Cisco Switching/Routing :: 2960 Stack Of Four Ws C2960S Crashes

May 29, 2011

We have a 2960 stack of 4 WS-C2960S-24PS-L switches.Sometimes, at random, the stack crashes and reboots. I have downloaded the crashinfo file and can see the following error.

View 7 Replies


ADVERTISEMENT

Cisco Switching/Routing :: WS-C2960S-48FPS-L Stack Port Down?

Mar 14, 2013

I'm trying to configure a stack between two WS-C2960S-48FPS-L but does not working.The switch port is always Down.I tried to change de module and cables.I tried to make a loop in one of two switches and the ports always down.
 
IOS: 12.2(55)SE5
 #show switch stack-ports
  Switch #    Port 1       Port 2
  --------    ------       ------
    1          Down         Down

View 15 Replies View Related

Cisco Switching/Routing :: WS-C2960S-24TS-L / Mac Flapping On Stack?

Feb 27, 2012

We have two switches WS-C2960S-24TS-L running in stack with running IOS c2960s-universalk9-mz.122-55.SE3.We have connected two checkpoint devices on Gi1/0/24 and Gi2/0/24 with a simple configuration:
 
interface range GigabitEthernet1/0/24, gi2/0/24
switchport access vlan x
switchport mode access
spanning-tree portfast
 
On the devices log we get the following message:

%SW_MATM-4-MACFLAP_NOTIF: Host 0000.0000.fe21 in vlan x is flapping between port Gi2/0/24 and port Gi1/0/24
 
The mac-address 0000.0000.fe21 is not found on any checkpoint interface. "Show mac-address int gi1/0/24 or gi2/0/24" does not show the correct mac-address of the checkpoint interface connected to the port, but instead shows 0000.0000.fe21.Is there a bug in the IOS, something wrong with the switch config or does it have something to do with the checkpoint config?

View 2 Replies View Related

Cisco Switching/Routing :: Stack C2960S High CPU Version 12.2(58)SE2

Jan 14, 2013

I have a customer with a stack of two switches C2960S-24TS-L that are running 12.2(58)SE2 universal K9, we see that the CPU load increase over time, to 95% and stays there reload solves the problem.the process that akes a lot of CPU is also the SNMP ENGINE, I see that it is running 30 minutes on 95% and then 10 minutes on 35%, this is the only stack were we see this problem. Is there also a SNMP bug in this version ?

View 1 Replies View Related

Cisco Switching/Routing :: WS-C2960S-48TD-L / Stack Reboot A Standalone Switch?

Dec 16, 2012

I have a Cisco WS-C2960S-48TD-L with 12.2(55)SE2.This is a standalone switch, not in stack, and with no order it reboots itself looking for a new master election. On logging i have nothing, but connected with console cable i see the following after 2 minutes of not showing anything:
 
Waiting for Stack Master Election...
 ...
The switch reboots and:
... 
*Mar  1 00:00:12.289: Read env variable - LICENSE_BOOT_LEVEL =

[URL]
 
After searching online i have no seeing nothing about disable the feature of the stack so i configure the priority for the "switch 1" to 15 and configure it the switches 2, 3 and 4 to no provision, although this switches don´t exist:
 
SW_ACCESS(config)#switch 1 priority 15
Changing the Switch Priority of Switch Number 1 to 15
Do you want to continue?[confirm]
New Priority has been set successfully

[URL]
 
With this new configuration the switch has rebooted again.Why on a standalone switch the stack is rebooting my system?Is it any feature to disable the stack?

View 8 Replies View Related

Cisco Switching/Routing :: WS-C2960S-24TS-L / Switch Version Compatibility In A Stack

Dec 19, 2012

We have the following stack configuration: 

Switch Ports Model              SW Version            SW Image------ ----- -----              ----------            ----------      1 28    WS-C2960S-24TS-L   12.2(55)SE3           C2960S-UNIVERSALK9-M     2 28    WS-C2960S-24TS-L   12.2(55)SE3           C2960S-UNIVERSALK9-M     3 52    WS-C2960S-48TS-L   12.2(55)SE5           C2960S-UNIVERSALK9-M *    4 52    WS-C2960S-48TS-L   12.2(55)SE5           C2960S-UNIVERSALK9-M 

View 5 Replies View Related

Cisco Switching/Routing :: Add 2960 To Stack Of 4 X 2960 Switches

Feb 7, 2012

I have an existing stack of 4 x 2960-S switches connected by stack cables.I would like to add another 2960-S switch to the stack but am unable to as the 2960-S will only allow 4 x 2960-S switches per stack.how I would add the 5th 2960-S switch to the existing stack of 4 x 2960-S switches.

View 12 Replies View Related

Cisco Switching/Routing :: Stack With WS3750G-24ps And WS-C2960S-24PS

Jun 5, 2012

is possible to have WS3750G-24PS in one stack with WS-C2960S-24PS? I want to add two new WS-C2960S-24PS to stack with one  WS3750G 24PS.

View 1 Replies View Related

Cisco Switching/Routing :: How To Stack Catalyst 2960

Dec 1, 2012

How would I go about stacking 4 Cisco Catalyst 2960-48PST-L switches? The one switch needs to accept a fiber connection from a distribution switch.  Do I have to buy flexstack module and cables? If so where does the module go on the switch? If this switch cannot do this set up, any other switch I should look at. 

View 6 Replies View Related

Cisco Switching/Routing :: Configure 2960 Stack IP Address?

May 20, 2013

This is probably a dumb question, but I have read the 2960 stack administration guide and it does not explain how to configure the stack IP address. It says several times that the stack can be managed from the stack IP address, and that the stack IP address is a system-level configuration item. But it never explains how to configure the stack IP address.

View 3 Replies View Related

Cisco Switching/Routing :: 2960 S - Stack Of 4 Unable To Console From Members?

Sep 10, 2012

I have stack of 2960 S  switches.I can console only from Master not from memember switches is this default behaviour?

View 1 Replies View Related

Cisco Switching/Routing :: Cross Stack EtherChannel From 3750 To 2960

Mar 25, 2013

We have a pair of WS-C3750X-24T-S in a stack and four WS-C2960S-48TS-L in a stack of their own. There is not really anything too fancy configured (no special VLAN configuration/trunks or etc.) but the 3750 do have two ports configured as L3 for routing. We are not trying to use those ports for EtherChannel. These devices are running IOS 12.2(55)SE3 Essentially we are attempting to make an EtherChannel group using port 48 on all four of the 2960's in their stack (four ports). On the 3750 we will configure an EtherChannel group using port 23 and 24 on both switches (four ports). We then connect them up to form a four member EtherChannel.The ports on both ends are configured as mode ON and they are all 1Gb ports. I elected mode on because I understand at least one of the EtherChannel protocols will not work cross stack. What I would like to ask is whether the above configuration is possible or are we hitting some sort of limitation of EtherChannel cross stack, etc..? I cannot find anything to suggest this configration is invalid, but thought I would ask to see if I missed something in the EtherChannel articles.

View 3 Replies View Related

Cisco Switching/Routing :: Maximum Switches Per Stack For Catalyst 2960

Apr 23, 2007

Any one who knows where I can find a documentation where it says the maximum switches per stack for the Catalyst 2960 family?

View 2 Replies View Related

Cisco Switching/Routing :: Catalyst 2960 / Add New Stack To Existing Two Stacks

Mar 7, 2013

On first floor, I have two stack switches and each stack has got 4 switches. they all are working fine.Now the client would like to add one more stack on the 2nd floor. But the second floor switches are different when compared to the 1st floor switches.
 
can you have differnt IOS among different stacks. I knew in a stack we need all the switches should have same IOS version. But in between two stacks to communicate do we need same IOS or they can be on differnet IOS?
 
1st floor switches have 15.0 version and 2nd floor new switches has 12.2.58. Is this ok ?
 
1st floor switches are 3500 series ( Note: only one one Vlan 20 we are using on the both stack switches and we would like add same Vlan 20 on to the new stack)
 
2nd floor switches aew 2 catalyst 2960 switches.
 
Note: on the second floor switches one is 24 port switch and the other one is 48 port switch. so can i make them  as a stack?
 
We have already done cabling from 1st floor to second floor. So no problem with that at all.

View 9 Replies View Related

Cisco Switching/Routing :: Catalyst 2960 - Can SFP+ Cable Be Used To Connect As Stack?

Apr 25, 2013

I have two Cisco 48 port Catalyst 2960-S series SI. Instead of buying the pricy stack modules can I only use the SFP+cable to connect them as stack? which type of SFP+cable should I buy? do I need any license to use those SFP ports?

View 9 Replies View Related

Cisco Switching/Routing :: Add Another Fiber Redundant Link Between 6509 And 2960 Stack?

Jan 6, 2012

below is the current config of link that is already up. I need to add another fiber redundant link between 6509 and 2960 stack. How to work on config Spanning side by not taking 6509 down after the change. 6509 is in distribution.
 
---------------X-ALPHA-IDF-1FORMS-2960S-0# (SIDE)
!interface GigabitEthernet1/0/52description X-ALPHA-F-6509-0 uplinkswitchport trunk native vlan 18switchport mode trunksrr-queue bandwidth share 1 50 30 19priority-queue out mls qos trust dscpmacro description cisco-routerauto qos trust spanning-tree portfast disablespanning-tree guard loopip dhcp snooping trust!
 
-----------------X-ALPHA-F-6509-0# (SIDE)
!interface GigabitEthernet3/10description 1st floor POC2 Forms IDFswitchportswitchport trunk encapsulation dot1qswitchport trunk native vlan 18switchport mode trunkno ip addressmls qos trust dscpspanning-tree guard loop!

View 1 Replies View Related

Cisco Switching/Routing :: 2960 Switch Stack Spanning Tree Recalculate From Port One

Feb 23, 2012

2960 switch stack (flex) Spanning tree re-calculate from stack port one?I need to identify with port in the stack is causing the re-calc  I have four 48 port switches and show spanning detail only indicates stack port 1.

View 1 Replies View Related

Cisco Switching/Routing :: Configure 3750 Stack As Core / 2960 As Access Layer Switches

Sep 29, 2012

I configure 3750 stack switch as core and 2960 stack switches as access layer switches.I connected my laptop to one of my core stack in VLAN 10 and I am pinging to one of my server in VLAN 1. What will be the minimum latency at the time of inter VALN routing

View 2 Replies View Related

Cisco Switching/Routing :: 2960 / ME 3600 - Stack Switches Are Good Solution For Resilience Of Huge Network

May 8, 2012

I have a question for Cisco Cat.2960-s Flex Stack switches which are installing on our sties. Two of 2960-s Stack switches as access switch and two of Cisco ME 3600X Series as distribution layer switches are to be installed in our sites. In case of two stack switches, One is will be a Master and the other one will be a member logically, as you know. So, if the master fails, the other one automatically becomes the stack master following a well-documented election process.

Now, it is my question. How long takes to be a stack master from a member switch ?  I cant find it on white paper of Cat.2960-s flex stack .
And also, I heard that sometimes a member switches don't election process when the master fails as a result, all stack members become
a panic.  Is that really right ? In addition, I heard that the stack switches have many troubleshooting points than stand alone switches.
I really wanna know if the stack switches are good solution for resilience of huge network site. I'm waiting an answer from  those who have experience of maintenance or installation.

View 9 Replies View Related

Cisco Switching/Routing :: CAB-STACK-50CM Bent Stack Cable

Feb 27, 2013

Is there a stacking cable that is "bent"?Im using this cable:"CAB-STACK-50CM", "Cisco StackWise 50CM Stacking Cable".But it takes up to much room in the back of the switch, is there such a thing as "bent" stacking cable.

View 1 Replies View Related

Cisco Switching/Routing :: Configuring Stack-power On A 3750X Stack?

Oct 31, 2012

I have 3 switches in my 3750 X stack. I am getting the following error in the logs:  %PLATFORM_STACKPOWER-4-PRIO_CONFLICT: Switch 1's power stack has conflicting power priorities.  Not sure what I should do next. Below is my Stack-power configuration:
 
Power stack name: Powerstack-1    Stack mode: Power sharing    Stack topology: Ring    Switch 1:        Power budget: 735        Low port priority value: 20        High port priority value: 10        Switch priority value: 2        Port 1 status: Connected        Port 2 status: Connected        Neighbor on port 1: c464.1308.7900        Neighbor on port 2: e8b7.4827.e680
    Switch 3:        Power budget: 729        Low port priority value: 22        High port priority value: 13        Switch priority value: 4        Port 1 status: Connected        Port 2 status: Connected        Neighbor on port 1: 2894.0fd9.9f00        Neighbor on port 2: 2894.0fd8.e200
    Switch 2:        Power budget: 690        Low port priority value: 21        High port priority value: 12        Switch priority value: 3        Port 1 status: Connected        Port 2 status: Connected        Neighbor on port 1: 2894.0fd8.e200        Neighbor on port 2: c464.1308.7900
 
Each switch has its own 715W power supply in it and all check out OK.

View 3 Replies View Related

Cisco Switching/Routing :: 2960G Configuring Ether-channel On Stack-wise Stack

Sep 24, 2012

A site that i am responsible for has the following equipment installed: 

2 x 3750G Switches configured as a stack using Stackwise - Collapsed Core/Distribution Layer
5 x 2960G Switches as Access Layer switches
 
WAN connections into the Core/Distribution Layer are all Gigabit Ethernet over Fibre.This is a dedicated CCTV Network with 50 Cameras all streaming video into the Core (decoders connected to access switches)Each 2960G has 2 links to the Core/Distribution 3750G Switches, 1 to each switch - Gigabit.I'm running rapid-pvst on all switches, so spanning tree is blocking one of the ports and effectively halving the 2 gig bandwidth. Next year our customer is going to add in a further 50 - 60 cameras.After monitoring the current loading on the ports in use, we have suggested to the customer that the 2 connections to each should be Ether-channeled together. [code]
 
First interface takes commands no problem, keep getting the message that etherchannel cannot be configured across different switches in a stack when i try to put the second interface commands on.

View 8 Replies View Related

Cisco Switching/Routing :: C2960S - 12.2(58)SE Crash On SSH

Apr 13, 2011

I just upgraded several of my C2960S-48FPD-L from 12.2(55)SE to 12.2(58)SE and now almost every time I try to SSH to it the switch reboots and gives me these trace backs ... 
 
07:58:52 CST Thu Apr 14 2011: Unexpected exception to CPU vector 200, PC = 1EADA28
-Trace back= 0x1EADA28z 0x1CDC324z 0x1EA5520z 0x1CDC35Cz 0x1CDD0E0z 0x1CDF0C4z 0x1CE06CCz 0x1CE07F8z 0x1D67348z 0x1D611BCz
 
Writing crash info to flash:/crashinfo_ext/crashinfo_ext_3
 
07:58:56 CST Thu Apr 14 2011: Unexpected exception to CPU vector 1100, PC = 121BB98
-Trace back= 0x121BB98z 0x12250FCz 0xFA7540z 0xA807B8z 0xA75DF4z 0xA78080z 0x94B708z 0x9717C0z 0x918DD8z 0x936520z 0x9344BCz 0x9345FCz 0x93484Cz 0x1D67348z 0x1D611BCz

=== Flushing messages (07:58:56 CST Thu Apr 14 2011) ===

Buffered messages: (last 4096 bytes only)
0x00000005  R6 = 0x01224F44  R7 = 0x02A23C6C
000089: *Feb 28 18:03:13.577 CST: %PLATFORM-1-CRASHED: R8 = 0x00000080  R9 = 0x00000000  R10 = 0x00000000  R11 = 0x00000071
000090: *Feb 28 18:03:13.577 CST: %PLATFORM-1-CRASHED: R12 = 0x00034855  R13 = 0x00000280  R14 = 0x01CE0778  R15 = 0x00000000
000091: *Feb 28 18:03:13.577 CST: %PLATFORM-1-CRASHED: R16 = 0x00000000  R17 = 0x00000000  R18 = 0x00000000  R19 = 0x00000000
[ code]....

View 9 Replies View Related

Cisco Switching/Routing :: WS-C2960S Inter VLAN Routing

Dec 9, 2012

I am looking for a reasonable switch but it has do do inter-VLAN Routing. I know I could go with a 3560/3750 with IP Services but I am also thinking the 2960S with IP Base IOS might do?
 
I have looked up the IP Base IOS and it does list IP Routing but how to actually configure inter-VLAN Routing on a 2960S with IP Base?

View 2 Replies View Related

Cisco Switching/Routing :: Enable L3 Routing On C2960S

Apr 19, 2013

I have been trying to enable L3 intervlan routing on C2960S Switch with ip routing command and that was the output from the Switch: [code]

View 6 Replies View Related

Cisco Switching/Routing :: C2960S Flexstack Serial Number

Mar 21, 2012

Is there a CLI-command to see the serial number of the flexstack module installed in a C2960S.

View 13 Replies View Related

Cisco Switching/Routing :: Recommended IOS For Switch C2960S And C3750

Jun 13, 2013

We have several of these WS-C2960S-24PS-L running 12.2(55)SE5  C2960S-universalK9-M and need to upgrade to a better.IOS since we have a sitution where CPU would get to 100% but we have only a few ports connected.Also we have several of WS-C3750-48P running 12.2(55) SE6 C3750-IPBASEK9-M.

View 3 Replies View Related

Cisco Switching/Routing :: GLC-GE-100FX Supported On WS-C2960S-24TD-L?

May 10, 2013

Does GLC-GE-100FX is supported on the WS-C2960S-24TD-L.  I don't see this switch listed under the compatibility matrix.URL
 
But the datasheet for the 2960S says this:
 
"The Cisco Catalyst 2960-S with SFP+ does not support the GLC-FE-100BX, GLC-FE-100FX, or GLC-FE-100LX." But it provides no reference for the GLC-GE-100FX The easy answer is, no the 2960S-24TD doesn't support it, any clarification if possible.

View 1 Replies View Related

Cisco Switching/Routing :: Configure Connection Between UCS FI 6120 To C2960S?

Mar 29, 2012

is it possible to connect UCS FI directly to C2960S using Twin Ax Cable (3M long) ?

View 2 Replies View Related

Cisco Switching/Routing :: Adding Dhcp Option 82 On C2960S

Dec 12, 2012

I have a very simple setup containing 3 C2960S switches:switch 1:  central switch, acting as router between VLAN 1 en VLAN 2switch 2+3: edge switches, connected via 1 link to central switch, both on VLAN 2,Clients connect to switch 2 and 3 using dhcp, switch 1 uses dhcp relay to forward requests from VLAN 2 to the dhcp server on VLAN 1.  So far so good.Now I want switch 1 to add option  82 to the dhcp requests so the dhcp server can see whether the request came through switch 2 or switch 3. I tried turning on dhcp option 82 support on switch 1 by doing.

View 2 Replies View Related

Cisco Switching/Routing :: WS-C2960S-24PD-L Support 1 Gig Uplinks With SFP?

Apr 1, 2012

WS-C2960S-24PD-LCatalyst 2960S 24 GigE PoE 370W, 2 x 10G SFP+ LAN Base 
 
Can I use the above said switch for 1 Gig Uplinks using SFP. 

View 2 Replies View Related

Cisco Switching/Routing :: WS-C2960S-48FPS-L / Pinount Poe (802.3af) And Poe+ (802.3at) For Switch?

Feb 12, 2012

The pinout of poe and poe+ (802.3af) and (803.3at) of these models of Cisco switches?

WS-C2960S-48FPS-L 48 Ethernet 10/100/1000 PoE+ ports; 740W PoE capacityWS-C2960S-48LPS-L 48 Ethernet 10/100/1000 PoE+ ports; 370W PoE capacityWS-C3750-48PS-S 48 Ethernet 10/100 ports with IEEE 802.3af and Cisco prestandard Power 
 
Pin goes where the power for Poe (802.3af) and poe+ (802.3at) for this model Cisco

View 1 Replies View Related

Cisco Switching/Routing :: WS-C2960S-24PS-L Floods Network

Jan 21, 2013

I have three new 2960 switches as listed in the title. I configured them as follows:

192.168.1.215     host: whse-c
192.168.1.216     host: whse-b
192.168.1.217     host: whse-a
 
Switches B and C flow into A before continuing on into the server room switch (distance issues).All three switches are configured for ports 21-24 at 1000 and set as cisco switches. all other ports are undefined as they have a myriad of desktops, printers and non cisco access points flowing into them. side question - should i configure them as access points where applicable even if they are non cisco? I am replacing three netgear switches that currently are in place and have no known issues other than they are old and the fans may fail soon.hooked up .217. was able to get to it from the network. Hooked up 215 and then 216.  All the sudden I lost the ability to tap into the switches, any of them. (I think I had done 215 at that point too, before adding 216.  I found out later it took the network to its knees as internet was lost, and the MPLS stopped functioning.
 
I undid the changes and put the netgears back in service and all was right with the world again.  At first I thought it was a bad host name as I had used whse-a on switch C in error. I changed that after this issue.Later that day I put 215 in place. checked it from the network and could get to it just fine. Then I put 216 in service. I lost connection to 215. I could no longer get to the internet from my pc and the MPLS went down again.  This time I just unhooked 216. 215 is still in place and working on the network at the moment and not causing issues. (btw these switches are not even in my path from my pc to the internet, just on the same network) tomorrow I am going to try 217 again while 215 is still on the network and see if there are any issues adding that swtich. if I can do so, and there are no problems, is this an indication of a faulty switch?  what further testing can I do, have I missed something in setup?  If this brings the network down again, why cant i add two of these switches to each other/on the same network path (B and C were not even connected to each other yesterday evening when it went down again).

View 2 Replies View Related







Copyrights 2005-15 www.BigResource.com, All rights reserved