Cisco Switching/Routing :: 3750-X Stacking Switch By Switch
Nov 18, 2012
I have two 3750-X configured to be a stack and I am planning to re-rack these somewhere else. What I would like to know is what are the effects of having the master switch itself lose power? Does it immediately just make the member take over master (there should be no election since there are only 2 switches??) and there would be no loss of connectivity?
We have three Cisco 3750 - 48port POE -LAN switches and i am trying to see if there are any issues when we stack POE and Non-POE type of switches.Aslo looking for information on the advanatage and disadvantage the stacking can provide on a Cisco 3750 48port.
i have an issue to connect a trunk between cisco switch and extreme switch i have many vlans that i want to cross via a link between cisco 3750 switch and a Extreme Alpine 3800 switch
configure qos in Cisco 3750 switch.I have configured below template and applied on the vlan interface.But i am getting the hit on the access list but I am not able to get hit on the class map.
I had a bad expirience with Switch 3750-X. Because of an auditing security processess, my customer ran a software called "Nessus" to do a scanning of vulnerability on the network. When this software is point to switch, the process of the switch will next to 100% and reset. The software only do a listening on the ports to see what ports are opened and the switch should not reset because this. Bellow is the log os switch on the moment of test; we note that the processess 'HTTP' rise moments before the switch reset. I disable the HTTP service on switch but the problem persist. The test was made only one machine connected to switch.
The question is: Will a 3750 switch route Jumbo frame sizes (e.g. 9000 MTU)?
We know that we can change the System MTU to 9000, and someone on a previous thread said that we can change the Routing MTU to 9000 as well, although I couldn't figure out how to do that. However, regardless of how we configure the System MTU and Routing MTU, I don't think we're able to adjust the MTU on L3 VLAN interfaces, so if we want to actually "route" between VLANs on the switch, we're limited to 1500 MTU.
Our situation is that we have a customer connecting to our 3750 switch, and this customer wants to use Jumbo frames. The customer connects to our 3750 switch via their own VLAN, with their own L3 VLAN interface configured on the switch. The customer will point their traffic towards the L3 VLAN interface, then we want to route them onto another VLAN, via a different L3 VLAN interface, before forwarding their traffic. Because of the limitations noted above, specificially regarding the routing between these VLANs via L3 interfaces, I do not think we'll be able to support 9000 MTU frames on this 3750 switch. I think the L3 VLAN interfaces will limit us to 1500 MTU, regardless of what we configured via the global System MTU and Routing MTU settings.
How do you properly remove the QOS queues and configs from the switch.A was using auto qos which created a whole mess of qos configs on my running-config. I did "no mls qos" in conf term but that did not remove the queues.
i want to remove an access layer 3750 48 POE master switch and replace with a new 3750 switch in the stack. i want to copy the same configuration to new switch since the old switch is having POE issue and I got replacement of the malfunctioned switch. we have VTP domain is configured in the network...
I'm looking at adding a Cisco 3750-X switch running c3750e-universalk9-mz.122-55.SE1 (IP base license) into a stack of 3750-G switches running c3750-ipbasek9-mz.122-55.SE1.bin Given that the version and feature sets are the same I don't forsee any compatibility issues. Would there be any reason why a universal image wouldn't stack correctly with other switches running the single .bin file?
I would like to ask about 3750 stacking and some Cat6 stuff...
1) How do we monitor 3750 stacking port in LMS? 2) Let say if I stack 3 switches, middle switch should be Master. Uplink should be at Top and Bottom. Is best practice? 3) Can we mixed 3750G and 3750X and what is result internal BW - fallback to 32Gps? 4) is there any Qos difference between WS-X6816-10G-2T and WS-X6816-10G-2TXL? 5) is there any Qos difference between MSFC5 PFC4 and MSFC5 PFC4XL? 6) What is main difference between PFC4 and PFC4XL in Sup2T? 7) Pls share more about Central and Distributed Switching in Sup2T and which card support Distributed DFCXL?
In Cisco 3750 facing high CPU utilization for specific period. During this period traffic response times across the switch degrades. Steps to identify interface potentially generating traffic. I have attached 'sh proc cpu history' , ' sh ip traffic', 'sh proc cpu sorted' during troubled period .
I have a 2 member 3750-x switch stack that was upgraded to 15.2 today via CNA. All the files were transfered and expanded correctly and it got to the step where the switches needed to be reloaded but on reload they froze.
I connected a console cable and power cycled the stack. I see the flash initialize and then the IOS image start to load. Lots of @ symbols and then nothing. It just sits there. The system light on the switches, while flashing green during the load, is now off. No light at all. But fans are running and the process will repeat itself if power cycled.
We currently have a stack of 5 x 3750 switches and i want to remove switch number 3 (it has the least number of things plugged in). What will happen to switch 4 and 5 will they be renumbered 3 and 4, and will the config automatically update this if it does?
I configured 3750 A switch with vlan 20 and its IP address 192.168.20.41Its default gateway was 192.168.20.3Then i configured 3750 B switch with same default gateway and vlan 20 IP 192.168.20.43My question is now when we stack it becomes single switch and now vlan 20 ip address is 192.168.20.43 thats only IP i can see.So how does stack switch choose vlan 20 IP?Does it choose highest IP address between two switches if they have same vlan 20 as in my case?Also when i go to switch 3750 b by session command and do sh ip route it does not show ip default gateway .Also it shows vlan 20 as admin down .
We have two 3750-x stacked switches with IP base license. We need to upgrade them to IP services license. I read some where that it is possible to install IP serivces license to only management switch and no need to purchase/install same license to other switches on the stack. But, I could not find/recall where I read it and as far as I know it was not official cisco documentation.
There 's a Cisco IP phone that sits between a PC and the switch port. On the switch port, no MAC address is learned. However, the switch is able to detect the IP phone and deliver power to it: [code] Switch is Catalyst 3750 with IOS version 12.2(58)SE1.
I have a 3750 switch and I am trying to configure PBR (route-maps) in it.But when I try to apply the policy to a vlan interface the policy does not show in the interface.So I can not use PBR to choose my default gateway!Question: Does PBR work in a 3750 switch? Can PBR be configured in a vlan interface? There is any problem with the IOS that I do not know?
We have a stack of 3 cisco swithes 3750s WS-C3750G-24TS 12.2(25)SEB4 .We plan to recover a switch from the stack as it is not needed any more The switch we plan to recover is the existing Master.If we change the priority (switch 1 priority) and make another switch the master using command line will we have any loss of connectivity to the servers conecting to the stack ?
What is the most cost effective way of connecting a Nexus 5k with a 3750, Apparently we cannot use 7 and 10 meter twinax cables to connect the 3750 switches to Nexus 5Ks.
I've created a scenario using a 3750 cisco as core switch ad other 6 switch model 2900 in access level.my problem is this, the router is not a cisco router, and this router is not able to make NAT on more than one subnet.Into the core switch I've created 4 VLAN and I must to give internet access to 3 of them, 192.168.0.0/24 (vlan1), 172.16.0.0/24 (vlan2), 172.17.0.0/24 (vlan3).I've connected the switch to router via gigabit ethernet 0/1 and I've assigned to this interface ip address 192.168.10.2, the router ip address is 192.168.10.1, Switch ip default-gateway is router ip address 192.168.10.1, ip default route is 0.0.0.0 0.0.0.0 192.168.10.1 I've enabled ip routing feature and I've set no switchport feature to interface gigabit ethernet 0/1.From core switch I can ping router ip address but I can't make it from all other user, and the users not able to have internet access.
Below the switch configuration (only necessary strings)
version 12.1 no service pad service timestamps debug uptime service timestamps log uptime no service password-encryption
Is there a way to change interface numbers on a 3750 stack but, still retain the config of the physical port?
For instance:
I would like to take the top switch, which has the ports numbered g2/0/1 - 52 and change them to be g1/0/1 - 52. And the bottom switch, which has ports numbered g1/0/1 - 52 and change them to be g2/0/1 - 52. Basically, just swap the interface numbers but, not effect any interface configurations.
I have 2 x 3750's in a stack, switch 2 is the master. We only have 5 hosts in each switch so we decided to move all hosts into switch to and removed switch 1 as we need it elsewhere. Anyway all worked fine, but I wanted to tidy the config up as it was still provisioned so I removed the provisioning for switch 1 and the config was now showing ports 2/0/1 to 2/0/24, I then wanted to renumber switch 2 in the stack to 1 and saved the config to NVRAM and reloaded and then disaster the switch reloaded with it provisioned with 2 switches. Switch 1 was now the main switch with no config on ports 1/0/1 to 1/0/24, but the correct config was still on 2/0/1 to 2/0/24 so I just copied those ports over switch 1's ports and then removed the second switch and all was good, but I did this all wrong, what is the best way to un-provision a switch from a stack and change the master?
The more I think about it when the switch 1 member was removed should I of copied the port config from the switch 2 (master) first and overlaid it on ports 1/0/1 to 1/0/24, renumber then master form 2 to 1 then rebooted, then removed the 2 switch from the provision?