1) current switch have below mentioned switch stack details
.
switch#sh switchSwitch/Stack Mac Address : fcfb.xyz.8b80H/W CurrentSwitch# Role Mac Address Priority Version State----------------------------------------------------------*1 Master fcfb.xyz.8b80 10 0 Ready3 Member 2893.xyz.3180 1 0 Ready
2) I am in process of changing switch member number from 3 to 2 , I executed the command on the global config mode " switch 3 renumber 2 "but I yet to reload the switch .
here I have I doubt . as currently the ports module are fas 1/0/1-48 and fas 3/0/1-48 under respective vlan . once I reload the switch is the switch port module number will get change to fastethernt 3/0/1-48 to fastethenet 2/0/1-48 ??? . if it happens the vlan configuation which configured on the fas 3/0/1-48 module also get configured automatically or I need to configure manually
3) as i said i have execuated the command : "switch 3 renumber 2 " , how to remove this or revert the change , as i checked in the running config this command not exist .
switch ( config) # switch 3 renumber 2WARNING: Changing the switch number may result in aconfiguration change for that switch.The interface configuration associated with the old switchnumber will remain as a provisioned configuration.Do you want to continue?[confirm]Changing Switch Number 3 to Switch Number 2New Switch Number will be effective after next reboot
I've got a 3750 stack with a 3750-48p being switch 1 and a 3750-12s being switch 2 and switch 2 is the master. I would like to change the stack member numbers. I would like the 3750-12s to be switch 1 and the 3750-48p to be switch 2. I undertand I will have to reboot the stack for the change to take affect but here are my questions:
- How would this change affect the stack running-config ?
I have 2 3750-x members in a stack running 12.2(58)SE2. I am able to console into the stack master, which happens to be the top switch, but not able to console into the 2nd member. I get the screen stating the console is available but never get the prompt to login. Is this expected behavior?On our stacks of 3750v2's, I'm able to console to any switch in the stack?
I've got a 3750 stack with a 3750-48p being switch 1 and a 3750-12s being switch 2 and switch 2 is the master. I would like to change the stack member numbers. I would like the 3750-12s to be switch 1 and the 3750-48p to be switch 2. I undertand I will have to reboot the stack for the change to take affect but here are my questions: How would this change affect the stack running-config ? will the switchport config follow the change ?
We have a current 3-stack 3750 ( 48-P,48-TS & 3750v2-48PS ) running fine. There is a plan to introduce a fourth stack member ( 3750X-48P ) into this stack.as per cisco documentation, it suggests to use 3750X as master for a mixed stack. In this case, we will need to upgrade current other 3 stack switches to a latest version.,Can we do a no-downtime ios upgrade on the existing 3-switch stack?, when this upgrade is done, is there any way to have the new ios pushed down to all three stack members at the same time or do we need to each member upgrade seperately?, for adding the fourth member, is it acceptable if master is ruuning ver eg. 12.2(55) and all rest of the members run ver 12.2(53) ? will this create any issues and will stacking be successful.
I have a 3 member CBS3120X-S stack in a HP C7000 enclosure (switches 1, 3, and 5). Switch 1, (the previous stack master) is not showing up in the stack and all the ports are down. Switch 3 has taken over as master, but I don't know what happened to switch 1. The system and stack lights are green and I am not seeing any messages in the log. I reset switch 1 and that did not resove the issue. I disconnected the stack cable and reset the switch again (pulled it out and pushed it back in) and connected to it with a console cable. I get nothing on the console, not even rommon mode. I was connected at the default baud rate that worked when I connected the conole of the other switches in the stack, so I don't think is a serial configuration issue. If this is CBS hardware problem, I don't understand why the system light is green.
We currently have a stack of 5 x 3750 switches and i want to remove switch number 3 (it has the least number of things plugged in). What will happen to switch 4 and 5 will they be renumbered 3 and 4, and will the config automatically update this if it does?
i want to remove an access layer 3750 48 POE master switch and replace with a new 3750 switch in the stack. i want to copy the same configuration to new switch since the old switch is having POE issue and I got replacement of the malfunctioned switch. we have VTP domain is configured in the network...
I have a switch stack with three WS-C3750X-48 switches running 12.2(55)SE. Recently, stack member 3 went offline for a few minutes, after being online for over a year. A show version on member 3 reports that the system returned to ROM by power-on.
Stack member 3 shares a UPS with a router that did not lose power and all three stack members have stack power with four 350 WATT power supplies between the three of them. There are no crashinfo files on any of the switches, log files show the stack ports on the other switches going offline then switch 3 being removed from the stack.
Surveillance recordings show there was no one near the switch during the time and AAA accounting shows no clues. Is it possible the switch crashed without leaving a trace in the logs, a crashinfo file and report that it returned to ROM by power-on?
I've read before that loose stack cables can cause stack member reboots. Would such an event generate log messages other than the stack ports changing states to down?
I have two 3750X in a stack. Each 3750X has one 10Gb uplink to primary core1 and one 1Gb uplink to backup core2 configured in 2 etherchannel groups. The member switch has bad ports, so I need to replace it. I have spare 3750X unit. Is it possible to connect the spare unit to the stack and then move the RJ-45 cables from the member with bad ports to the new member? That way I can minimize servers downtime to just a few seconds..If that would work, then the last step would be to move the 10Gb networking module from old member to the new one, as well as the secondary PSU. Is it doable? Also according to the documentation, all I need to add new member is matching IOS version, correct?
I configured 3750 A switch with vlan 20 and its IP address 192.168.20.41Its default gateway was 192.168.20.3Then i configured 3750 B switch with same default gateway and vlan 20 IP 192.168.20.43My question is now when we stack it becomes single switch and now vlan 20 ip address is 192.168.20.43 thats only IP i can see.So how does stack switch choose vlan 20 IP?Does it choose highest IP address between two switches if they have same vlan 20 as in my case?Also when i go to switch 3750 b by session command and do sh ip route it does not show ip default gateway .Also it shows vlan 20 as admin down .
We have a stack of 3 cisco swithes 3750s WS-C3750G-24TS 12.2(25)SEB4 .We plan to recover a switch from the stack as it is not needed any more The switch we plan to recover is the existing Master.If we change the priority (switch 1 priority) and make another switch the master using command line will we have any loss of connectivity to the servers conecting to the stack ?
We have a WS-C3750G-24PS switch running 12.2(50)SE , C3750-IPBASEK9-M in production & stand alone and we want to ask a new Cisco WS-C3750-24P running 12.2(55)SE3 , C3750-IPBASEK9-M into the stack with the 1st one.
Just want to know if it is possible and are there any problems with the IOS being different version.
I have a stack with a lot of stack-port changes, but on all the ports, how can I determine the faulty switch in the stack, cables are already verified. We did also a restart of the whole stack power off/on
running version
WS-C3750-48P 12.2(55)SE C3750-IPBASEK9-M
This is the output after 6weeks
Switch#/ Stack Neighbor Cable Link Link Sync # In Port# Port Length OK Active OK Changes Loopback Status To LinkOK -------- ------ -------- -------- ---- ------ ---- --------- -------- 1/1 OK 4 1
In the current set up I have a LAN stack of 5 3750 switches configured as an access stack. As per the requirement I need to partition the current 5 switch stack into two individual stacks of 3 & 2 switches respectively. Kindly let me know the step by step process withh all the necessary commands, reloads and reconnections. I purpose to do it by changing the priority of current member switch to 15 so that its elected as Master in the new partitioned switch stack. But not sure what all steps required and in which order.
One switch of our stack of 8 3750 have reboot with no reason. Nobody was in the room server when it appears et there was'nt any electrical problem at this moment.
I have four-switch Cat 3750 stack that has been working reliably for a couple years. Suddenly the other morning it reboots itself, and has been doing so every 24 hours since. take a look at the attached log? This should really be a Smartnet thing, but as it turns out the warranty we have on this is not Smartnet .
We are having 3750 Stack switch as our edge switch. Here we are having some issues as low memory & itermediate High CPU utilization.For memory when we checked its shwoing maximum memory is allocated to DHCPD receive & ARP Input as follows
Processor Pool Total: 70829380 Used: 56809532 Free: 14019848 I/O Pool Total: 12582912 Used: 8554920 Free: 4027992 Driver te Pool Total: 1048576 Used: 40 Free: 1048536
[code].....
i want to understand why this 2 proceses (DHCPD & ARP input) taking more memory?High CPU: We also facing intermediate high CPU utilization (above 95%). When CPU is high there were 2 processes consuming more CPU are 'Spanning Tree' (about 20%) & ARP Input (about 66%). we also checked the ARP entries, there were 1500 ARP entries & 2 incomplete ARP (out of 6000 ARP supported)
At a customer i've tried to add a new 3750 switch til a running stack.I used the following proccess:
1. connect stack cables to the new switch
2. bootup new switch.
Normally the new switch will become a member of the stack, but here, the switch says its the stack master. I can see that the stack port from the old switches connecting the new is up.The only way i could make it work was to provisioning the new switch as switch nr x, save, power off and then connect it and boot it up.The IOS i the same on all switches.
in our network we were using three 3750-48-s switches with stacking one of the switch due to some hardware failure power problem,
now i want to add a new switch 3750-48-s in the existing Stack two switches , the old two switches ios version is = 12.2(25r)SEC the new Catalyst 3750 io verion is = 12.2(35)SE5
how to add this switch in the existing two stack switches , with documentation
I have stack of 2 switches 3750?I config etherchannel between them.
here is result
2 Po2(SD) LACP Fa1/0/15(I) Fa2/0/15(I)
Both ports are up up but standalone Int port channel 2 is down down.Need to know if this is default behaviour when we config etherchannel between stack switches?
is there a document that explains the compatibility of 3750 series that can be stacked together? for example can we stack 3750-x with 3750-v2 without the power sharing? Can we stack a L3 3750 with L2 3750 without upgrading the L2 switch IOS to ip services?
We have a live stack with 4 Cat 3750 switches of mixed varieties. Switch 1 crashed the other day and didn't come back up. A power reset brought the switch online again, and switch 2 is now running as the stack master. We are going to replace switch 1 in a staged approach to minimise client downtime. Switch 1 is a ws-c3750-48ts and we will be replacing it with a ws-c3750g-48ts. I will be pre-provisioning and installing the new switch into the stack as switch 5 and configuing the ports to be the same as switch 1. The cables will then be moved over from switch 1 to switch 5 so the changeover time should be minimal. When all cutover, I'll power down switch 1, reconfigure the stack cables and remove switch 1 from the stack.
My question is to what occurs next. If I perform a 'no switch 1 provision ws-c3750-48ts' will I be left with switch 2 through to 5 (ie no switch 1)? I can live with this moving forward. I know I can renumber switch 5 to be switch 1 if I want, but my understanding is that I have to reload the member switch which is something I'd like to avoid at this stage. In my reading, I saw the statement - "Note: You cannot use the switch current-stack-member-number renumber new-stack-member-number global configuration command on a provisioned switch. If you do, the command is rejected." I'm a bit confused by this statement, I'm assuming that it is saying that if I do as above but don't issue the 'no switch 1 provision' command, I cannot renumber switch 5 to switch 1 but as long as I use the 'no switch 1 provision' command first, I can renumber switch 5 to switch 1? Will all of my switch 5 port configuration information and any associated references (eg port-channel configuration etc) be changed from gi5/0/x to gi1/0/x if I do renumber?
I have looked on notes to add a switch to an existing stack and haven’t identified answers on how the IOS will be affected on the new switch – will it downgrade to the current stack version or will the current stack upgrade to its version. At this moment in time I would prefer if the new switch IOS downgraded to the current stack IOS version.The new switch is a 3750V2 – will this affect how it joins the stack?The new switch has the image of IPBASEK9-M – again will this affect how it joins the stack?
I have a Cisco 3750G-48PS Running IOS 12.2(40) and was wondering how many physical ports are supported in an LACP Configuration. Is it 4 or 8 ports in a single switch.
If I have a dual 3750 stacked together, and I want to configure (8) port LACP, Can I take (4) ports from each switch in the stack and LACP together.
I have been looking at the Cisco Hardware docs and I can't find anything on the proper way to setup a 2 switch stack for Stackwise redundancy and Stackpower redundancy. Everything details 3 or more switches.
I have 4 switches in a 3750-X stack.Here is the output from the stack why are the switches out of order and I'm not able to bring up switch 1 port 1.
switch 4 port 2 shows not connect it is I've checked the cables.
Power stack name: Powerstack-4 Stack mode: Power sharing Switch 1: Power budget: 695 Low port priority value: 22 High port priority value: 13 Switch priority value: 4 Port 1 status: Shut Port 2 status: Connected Neighbor on port 1: 0000.0000.0000 Neighbor on port 2: c471.fe84.e100
Switch 2: Power budget: 713 Low port priority value: 21 High port priority value: 12 Switch priority value: 3 Port 1 status: Connected Port 2 status: Connected Neighbor on port 1: c471.fe85.3000 Neighbor on port 2: c471.fe80.2800
Switch 4: Power budget: 697 Low port priority value: 19 High port priority value: 10 Switch priority value: 1 Port 1 status: Connected Port 2 status: Not connected Neighbor on port 1: c471.fe80.2800 Neighbor on port 2: 0000.0000.0000
Switch 3: Power budget: 710 Low port priority value: 20 High port priority value: 11 Switch priority value: 2 Port 1 status: Connected Port 2 status: Connected Neighbor on port 1: c471.fe84.e100 Neighbor on port 2: c471.fe7f.eb00s
We have 2 3750 24 port fiber switches in a stack and we would like to change the member to become the master. Both are running the same IOS and they are alive on the network. I read that you can change the who becomes the master by setting the priority number higher on the member, which we did. However this requires a reboot of the member to take effect. Is there a way to force this without having to reboot? One other note, both switches in stack have a single gig connection that goes to the core (6500). One gig link is blocked due to spanning-tree and this is on the member that we want to become the master.
I am attempting to add and Catalyst 3750 - 12 port Gigabit switch to an existing stack of 3750 48 port switches (non-X fabric). I am not sure how to proceed. These are the two questions/thoughts I have. Any additional perspective I should have before proceeding.
What kind of configuration should I apply to the Gig switch before adding it to the stack?I am sure I will need to assign priority to the new switch, ideally, it will act as master.