Cisco Switching/Routing :: CBS 3120X-S Switch Stack Member Down

Mar 4, 2012

I have a 3 member CBS3120X-S stack in a HP C7000 enclosure (switches 1, 3, and 5). Switch 1, (the previous stack master) is not showing up in the stack and all the ports are down. Switch 3 has taken over as master, but I don't know what happened to switch 1.  The system and stack lights are green and I am not seeing any messages in the log. I reset switch 1 and that did not resove the issue. I disconnected the stack cable and reset the switch again (pulled it out and pushed it back in) and connected to it with a console cable. I get nothing on the console, not even rommon mode. I was connected at the default baud rate that worked when I connected the conole of the other switches in the stack, so I don't think is a serial configuration issue. If this is CBS hardware problem, I don't understand why the system light is green.

Switches 1,3, 5 and provision configuration:
 
switch 1 provision ws-cbs3120g-s
switch 3 provision ws-cbs3120x-s
switch 5 provision ws-cbs3120g-s

[Code].....

View 1 Replies


ADVERTISEMENT

Cisco Switching/Routing :: 3750 / Reload Member Switch In Stack?

Apr 5, 2012

I have just upgraded 2 3750 switches in a stack via the master and reloaded the master switch remotely, how can I reload the 2nd (member) switch?

View 16 Replies View Related

Cisco Switching/Routing :: 3750 Stack - Changing Switch Member Number From 3 To 2?

Sep 24, 2012

1)  current  switch have below mentioned  switch stack details
   . 
switch#sh switchSwitch/Stack Mac Address : fcfb.xyz.8b80H/W CurrentSwitch# Role Mac Address Priority Version State----------------------------------------------------------*1 Master fcfb.xyz.8b80 10 0 Ready3  Member 2893.xyz.3180 1 0 Ready
 
2) I am in process of changing switch member number from  3 to 2   , I executed the command on the global config mode " switch 3 renumber 2 "but I yet to reload the switch .
 
here I have I doubt . as currently  the ports module are   fas 1/0/1-48  and  fas 3/0/1-48 under respective vlan  . once I reload the switch is the switch port module number will get change to  fastethernt 3/0/1-48 to   fastethenet 2/0/1-48 ???  .  if it happens  the vlan configuation which configured on the fas 3/0/1-48 module  also get configured automatically  or I need to configure  manually
   
3) as i said  i have execuated  the command  :  "switch 3 renumber 2 " , how to remove this or revert the change  , as i checked in the running config  this command not exist .

switch ( config) # switch 3 renumber 2WARNING: Changing the switch number may result in aconfiguration change for that switch.The interface configuration associated with the old switchnumber will remain as a provisioned configuration.Do you want to continue?[confirm]Changing Switch Number 3 to Switch Number 2New Switch Number will be effective after next reboot

View 4 Replies View Related

Cisco Switching/Routing :: Add Stack Member 3750?

Jul 10, 2012

One of the stack member has failed and we need to replace the same with the new one.
 
[code],....

View 7 Replies View Related

Cisco Switching/Routing :: Cannot Console Into 3750-X Stack Member

Sep 27, 2012

I have 2 3750-x members in a stack running 12.2(58)SE2. I am able to console into the stack master, which happens to be the top switch, but not able to console into the 2nd member. I get the screen stating the console is available but never get the prompt to login. Is this expected behavior?On our stacks of 3750v2's, I'm able to console to any switch in the stack?

View 1 Replies View Related

Cisco Switching/Routing :: Replacing 3750X Stack Member?

Feb 7, 2012

I have two 3750X in a stack. Each 3750X has one 10Gb uplink to primary core1 and one 1Gb uplink to backup core2 configured in 2 etherchannel groups. The member switch has bad ports, so I need to replace it. I have spare 3750X unit. Is it possible to connect the spare unit to the stack and then move the RJ-45 cables from the member with bad ports to the new member? That way I can minimize servers downtime to just a few seconds..If that would work, then the last step would be to move the 10Gb networking module from old member to the new one, as well as the secondary PSU. Is it doable? Also according to the documentation, all I need to add new member is matching IOS version, correct?

View 1 Replies View Related

Cisco Switching/Routing :: 3750 - Change Stack Member Numbers

Mar 3, 2011

I've got a 3750 stack with a 3750-48p being switch 1 and a 3750-12s being switch 2 and switch 2 is the master. I would like to change the stack member numbers. I would like the 3750-12s to be switch 1 and the 3750-48p to be switch 2. I undertand I will have to reboot the stack for the change to take affect but here are my questions: How would this change affect the stack running-config ? will the switchport config follow the change ?

View 5 Replies View Related

Cisco Switching/Routing :: 3750 - Changing Stack Member Numbers

Feb 5, 2012

I've got a 3750 stack with a 3750-48p being switch 1 and a 3750-12s being switch 2 and switch 2 is the master. I would like to change the stack member numbers. I would like the 3750-12s to be switch 1 and the 3750-48p to be switch 2. I undertand I will have to reboot the stack for the change to take affect but here are my questions:
 
- How would this change affect the stack running-config ?

- will the switchport config follow the change ?
 
switch 1 provision ws-c3750-48p
switch 2 provision ws-c3750g-12s

View 1 Replies View Related

Cisco Switching/Routing :: 3750E-24PD-S Stack Member Fan Failed Syslog Message

Aug 6, 2012

I have a pair of 3750E-24PD-S stacked together, it seems after stacked together the stacked switch always flood the console screen with these messages which are not true: [code] Switch-2 is the stack member, Switch-1 is the stack master. The RPS fan failed refers to RPS2300 or the internal power supply of 3750E? Even when I turned on the RPS2300 the stacked switch still display the messages. Also I have two RPS2300 serving stack master and stack member respectively both RPS2300 were switched off why the messages only refer to Switch-2 and not Switch-1? [code]

View 1 Replies View Related

Cisco LAN :: Four Member Switch Stack 3750

Apr 16, 2013

We have a current 3-stack 3750 ( 48-P,48-TS & 3750v2-48PS ) running fine. There is a plan to introduce a fourth stack member ( 3750X-48P ) into this stack.as per cisco documentation, it suggests to use 3750X as master for a mixed stack. In this case, we will need to upgrade current other 3 stack switches to a latest version.,Can we do a no-downtime ios upgrade on the existing 3-switch stack?, when this upgrade is done, is there any way to have the new ios pushed down to all three stack members at the same time or do we need to each member upgrade seperately?, for adding the fourth member, is it acceptable if master is ruuning ver eg. 12.2(55) and all rest of the members run ver 12.2(53) ? will this create any issues and will stacking be successful.

View 5 Replies View Related

Cisco Switching/Routing :: 3120X - Blade Mac-addresses In Wrong VLAN

Feb 12, 2013

- Incoming frames on three of a blade's four switchports are being put into VLAN 1 even though the ports are either in other access VLANs, or are configured as trunks with different VLAN IDs being tagged by the server. - When the ports go down the access VLAN is removed from the port.
 
Switch stack: 4x WS-CBS3120X-S, 12.2(58)SE1
HP blade: HP BL460c Gen8
 
This combination has been used successfully elsewhere.
 
Switchport configuration:
 
!
interface GigabitEthernet1/0/13 -------> THIS PORT IS OK
switchport mode trunk

[Code].....

View 1 Replies View Related

Cisco Switching/Routing :: 3750 / Add A New Switch In Stack?

Jun 21, 2012

i want to remove an access layer 3750 48 POE master switch and replace with a  new 3750 switch in the stack. i want to copy the same configuration to new switch since the old switch is having POE issue and I got replacement of the malfunctioned switch. we have VTP domain is configured in the network...

View 3 Replies View Related

Cisco Switching/Routing :: C3750x-48P-E Stack Switch Best IOS

Mar 27, 2013

Which is the best and advanced IOS for c3750x-48P-E stack switch among below listed IOS.
 
c3750e-universalk9-mz.122-58.SE2 ?
or
c3750e-universalk9-mz.122-55.SE6..??

View 4 Replies View Related

Cisco Switching/Routing :: 2960s / Add One More Switch In Stack?

Apr 29, 2013

I have a running setup having 2 Cisco 2960s 24 TS switch with Stack configuration. Now I want to add one more same Cisco switch. My questions are:-
 
1) How can I do this...(Should follow the same process as I did before.

2) Could I do this without impacting the service. i.e. without rebooting the switch.

3) What should be the connection archiecture as of now since there is two switch so it is connected 1 -1 and 2-2. but for 3 switch should we require to change the connectivity.

View 1 Replies View Related

Cisco Switching/Routing :: Switch 3750G Stack

Jun 17, 2012

have one 3750G stack with 4 switches and this stack is presenting the follow log message:
 
%PLATFORM_UCAST-4-PREFIX:  One or more, more specific prefixes could not be programmed into TCAM and are being covered by a less specific prefix, and the packets may be software forwarded.
 
In this stack we are using the layer 3 with OSPF routing, and the current sdm prefer is default:
 
switch-01-3750#sh sdm prefer
The current template is "desktop default" template.
The selected template optimizes the resources in
the switch to support this level of features for
8 routed interfaces and 1024 VLANs.(code)

View 2 Replies View Related

Cisco :: 3750 Stack Member Loss Power?

Jun 10, 2012

I have a switch stack with three WS-C3750X-48 switches running 12.2(55)SE. Recently, stack member 3 went offline for a few minutes, after being online for over a year. A show version on member 3 reports that the system returned to ROM by power-on.

Stack member 3 shares a UPS with a router that did not lose power and all three stack members have stack power with four 350 WATT power supplies between the three of them. There are no crashinfo files on any of the switches, log files show the stack ports on the other switches going offline then switch 3 being removed from the stack.

Surveillance recordings show there was no one near the switch during the time and AAA accounting shows no clues. Is it possible the switch crashed without leaving a trace in the logs, a crashinfo file and report that it returned to ROM by power-on?

I've read before that loose stack cables can cause stack member reboots. Would such an event generate log messages other than the stack ports changing states to down?

View 6 Replies View Related

Cisco Switching/Routing :: WS C3750 Stack Switch Compatibility

Mar 13, 2011

We have existing stack of  3 units of  WS-C3750-48TS-S ( 100 mbps ports with Gigabot uplinks). with IOS as follows, Can we add  WS-C3750G-48PS-S  in this same stack (this is 48 Gigabit ports)?

View 2 Replies View Related

Cisco Switching/Routing :: Stack Behaviour Of 3750 Switch

Nov 17, 2012

I configured 3750 A  switch with vlan 20 and its IP address 192.168.20.41Its default gateway was 192.168.20.3Then i configured 3750 B  switch with same default gateway and vlan 20 IP   192.168.20.43My question is now when we stack it becomes single switch and now vlan 20 ip address is 192.168.20.43 thats only IP i can see.So how does stack switch choose vlan 20 IP?Does it choose highest IP address between two switches if they have same vlan 20 as in my case?Also when i go to switch 3750 b by session command and do sh ip route  it does not show ip default gateway .Also it shows vlan 20 as admin down .

View 5 Replies View Related

Cisco Switching/Routing :: 3750-X - How To Shutdown Only Switch In Stack

Aug 11, 2011

I have a doubt. In my environment I have two Switch 3750-X in stack.

My question is: How to shutdown remotely only a switch in stack?

View 23 Replies View Related

Cisco Switching/Routing :: 3750 - Removing Switch From Stack Of Three

Oct 30, 2011

We have a stack of 3 cisco swithes 3750s WS-C3750G-24TS 12.2(25)SEB4 .We plan to recover a switch from the stack as it is not needed any more The switch we plan to recover is the existing Master.If we change the priority (switch 1 priority) and make another switch the master using command line will we have any loss of connectivity to the servers conecting to the stack ?

View 1 Replies View Related

Cisco Switching/Routing :: 2960s Switch Stack IOS Upgrade?

Apr 18, 2012

I was just curious about something with upgrading a 2960s stack.
 
To copy the image to the switches in the stack I use: Switch# archive download-sw tftp://x.x.x.x/filename
 
Does this also set the image as the boot image or do I still need to issue the boot system flash command?
 
can I just issue this command on the master switch and reload and the new config will be pushed to the rest of the switches?

View 5 Replies View Related

Cisco Switching/Routing :: Stack 3750G-12S-S With 3750X-48T Switch?

Apr 14, 2012

if we can stack the 3750G switch with a 3750X switch ?

View 7 Replies View Related

Cisco Switching/Routing :: 3750 - Adding New Switch To Stack With Different IOS

Sep 12, 2012

We have a WS-C3750G-24PS switch running 12.2(50)SE , C3750-IPBASEK9-M in production & stand alone and we want to ask a new Cisco WS-C3750-24P running 12.2(55)SE3 , C3750-IPBASEK9-M into the stack with the 1st one.
 
Just want to know if it is possible and are there any problems with the IOS being different version.

View 8 Replies View Related

Cisco Switching/Routing :: 3750X - Single Switch Stack?

Mar 8, 2012

I have a 3750X 24 port switch (with NM-1G network module) running IOS 15.0(1). Is there any benefit or reason to plug in the included Stack Wise cable and loop it back to itself in a single switch installation?
 
I don't see any recommendation in the documentation. The data sheet indicates a single switch is a non-blocking device so I'd think there's no bandwidth advantage like there is when connecting an actual multi-switch stack and needing to close the loop for the full 32 Gbps stack bandwidth.

View 2 Replies View Related

Cisco Switching/Routing :: 3750 Switch Stack-port Changes

Feb 7, 2011

I have a stack with a lot of stack-port changes, but on all the ports, how can I determine the faulty switch in the stack, cables are already verified. We did also a restart of the whole stack power off/on
 
running version
 
WS-C3750-48P       12.2(55)SE            C3750-IPBASEK9-M
 
This is the output after 6weeks
 
Switch#/  Stack   Neighbor   Cable    Link   Link   Sync      #         In  Port#     Port              Length    OK   Active   OK    Changes   Loopback          Status                                          To LinkOK          --------  ------  --------  --------  ----  ------  ----  ---------  --------  1/1     OK         4      1

[Code].....

View 7 Replies View Related

Cisco Switching/Routing :: 3750 Switch Stack Partition

Jan 6, 2013

In the current set up I have a LAN stack of 5 3750 switches configured as an access stack. As per the requirement I need to partition the current 5 switch stack into two individual stacks of 3 & 2 switches respectively. Kindly let me know the step by step process withh all the necessary commands, reloads and reconnections. I purpose to do it by changing the priority of current member switch to 15 so that its elected as Master in the new partitioned switch stack. But not sure what all steps required and in which order.

View 1 Replies View Related

Cisco Switching/Routing :: Upgrading C3750-X Stack Switch

Nov 27, 2012

a) I have three C3750-X switch stack together as my SAN switch and running on the new 15.0 release which is 15.0(1) SE.

b) Recently the master switch rebooted without any explanation. Create ticket with TAC and got an answer that it is due to a bug with ID: CSCtr31957.
 
My question is, which release that should i choose either the 15.0(1) SE3 or the latest 15.0(2)? Will it affect any of my configuration if i change to 15.0(2)?

Finally, what is the best practice to upgrade IOS in a stack whether to upgrade it 1 switch at a time or do it to all at once?

View 3 Replies View Related

Cisco Switching/Routing :: Switch 3750 Of Stack Rebooted With No Reason

Oct 2, 2012

One switch of our stack of 8 3750 have reboot with no reason. Nobody was in the room server when it appears et there was'nt any electrical problem at this moment.

View 4 Replies View Related

Cisco Switching/Routing :: 3750 - Switch Stack Reboots Every 24 Hours

Nov 12, 2011

I have four-switch Cat 3750 stack that has been working reliably for a couple years. Suddenly the other morning it reboots itself, and has been doing so every 24 hours since. take a look at the attached log? This should really be a Smartnet thing, but as it turns out the warranty we have on this is not Smartnet .

View 6 Replies View Related

Cisco Switching/Routing :: High Utilization On 3750x Switch Stack?

Feb 25, 2013

i am seeing very high utilization on a random basis on the stack. and the logs indicate me that there is a pattern where there is a stack power cable shows inserted (which was never unplugged) followed by sudden spike in the utilization.
 
001018: *Mar  6 16:21:22.138: %PLATFORM_STACKPOWER-6-CABLE_EVENT: Switch 4 stack power cable 1 inserted
001019: *Mar  6 18:18:37.982: %SYS-1-CPURISINGTHRESHOLD: Threshold: Total CPU

[Code]......

View 16 Replies View Related

Cisco Switching/Routing :: High Memory And CPU With 3750 Stack Switch?

Dec 26, 2012

We are having 3750 Stack switch as our edge switch. Here we are having some issues as low memory & itermediate High CPU utilization.For memory when we checked its shwoing maximum memory is allocated to DHCPD receive & ARP Input as follows
 
Processor Pool Total:   70829380 Used:   56809532 Free:   14019848
      I/O Pool Total:   12582912 Used:    8554920 Free:    4027992
Driver te Pool Total:    1048576 Used:         40 Free:    1048536

[code].....

i want to understand why this 2 proceses (DHCPD & ARP input) taking more memory?High CPU: We also facing intermediate high CPU utilization (above 95%). When CPU is high there were 2 processes consuming more CPU are 'Spanning Tree' (about 20%) & ARP Input (about 66%). we also checked the ARP entries, there were 1500 ARP entries & 2 incomplete ARP (out of 6000 ARP supported)

View 6 Replies View Related

Cisco Switching/Routing :: 3750 Connect Stack Cables To New Switch

Dec 11, 2011

At a customer i've tried to add a new 3750 switch til a running stack.I used the following proccess:
 
1. connect stack cables to the new switch

2. bootup new switch.
 
Normally the new switch will become a member of the stack, but here, the switch says its the stack master. I can see that the stack port from the old switches connecting the new is up.The only way i could make it work was to provisioning the new switch as switch nr x, save, power off and then connect it and boot it up.The IOS i the same on all switches.

View 2 Replies View Related

Cisco Switching/Routing :: Adding A New Switch In Existing Two 3750 Stack

Mar 25, 2012

in our network we were using three 3750-48-s switches with stacking one of the switch due to some hardware failure power problem,
 
now i want to add a new switch 3750-48-s in the existing Stack two switches , the old two switches ios version is = 12.2(25r)SEC the new Catalyst 3750 io verion is =   12.2(35)SE5
 
how to add this switch in the existing two stack switches , with documentation

View 1 Replies View Related