Cisco Switching/Routing :: Cannot Console Into 3750-X Stack Member

Sep 27, 2012

I have 2 3750-x members in a stack running 12.2(58)SE2. I am able to console into the stack master, which happens to be the top switch, but not able to console into the 2nd member. I get the screen stating the console is available but never get the prompt to login. Is this expected behavior?On our stacks of 3750v2's, I'm able to console to any switch in the stack?

View 1 Replies


ADVERTISEMENT

Cisco Switching/Routing :: Add Stack Member 3750?

Jul 10, 2012

One of the stack member has failed and we need to replace the same with the new one.
 
[code],....

View 7 Replies View Related

Cisco Switching/Routing :: 3750 - Change Stack Member Numbers

Mar 3, 2011

I've got a 3750 stack with a 3750-48p being switch 1 and a 3750-12s being switch 2 and switch 2 is the master. I would like to change the stack member numbers. I would like the 3750-12s to be switch 1 and the 3750-48p to be switch 2. I undertand I will have to reboot the stack for the change to take affect but here are my questions: How would this change affect the stack running-config ? will the switchport config follow the change ?

View 5 Replies View Related

Cisco Switching/Routing :: 3750 - Changing Stack Member Numbers

Feb 5, 2012

I've got a 3750 stack with a 3750-48p being switch 1 and a 3750-12s being switch 2 and switch 2 is the master. I would like to change the stack member numbers. I would like the 3750-12s to be switch 1 and the 3750-48p to be switch 2. I undertand I will have to reboot the stack for the change to take affect but here are my questions:
 
- How would this change affect the stack running-config ?

- will the switchport config follow the change ?
 
switch 1 provision ws-c3750-48p
switch 2 provision ws-c3750g-12s

View 1 Replies View Related

Cisco Switching/Routing :: 3750 / Reload Member Switch In Stack?

Apr 5, 2012

I have just upgraded 2 3750 switches in a stack via the master and reloaded the master switch remotely, how can I reload the 2nd (member) switch?

View 16 Replies View Related

Cisco Switching/Routing :: 3750 Stack - Changing Switch Member Number From 3 To 2?

Sep 24, 2012

1)  current  switch have below mentioned  switch stack details
   . 
switch#sh switchSwitch/Stack Mac Address : fcfb.xyz.8b80H/W CurrentSwitch# Role Mac Address Priority Version State----------------------------------------------------------*1 Master fcfb.xyz.8b80 10 0 Ready3  Member 2893.xyz.3180 1 0 Ready
 
2) I am in process of changing switch member number from  3 to 2   , I executed the command on the global config mode " switch 3 renumber 2 "but I yet to reload the switch .
 
here I have I doubt . as currently  the ports module are   fas 1/0/1-48  and  fas 3/0/1-48 under respective vlan  . once I reload the switch is the switch port module number will get change to  fastethernt 3/0/1-48 to   fastethenet 2/0/1-48 ???  .  if it happens  the vlan configuation which configured on the fas 3/0/1-48 module  also get configured automatically  or I need to configure  manually
   
3) as i said  i have execuated  the command  :  "switch 3 renumber 2 " , how to remove this or revert the change  , as i checked in the running config  this command not exist .

switch ( config) # switch 3 renumber 2WARNING: Changing the switch number may result in aconfiguration change for that switch.The interface configuration associated with the old switchnumber will remain as a provisioned configuration.Do you want to continue?[confirm]Changing Switch Number 3 to Switch Number 2New Switch Number will be effective after next reboot

View 4 Replies View Related

Cisco LAN :: Four Member Switch Stack 3750

Apr 16, 2013

We have a current 3-stack 3750 ( 48-P,48-TS & 3750v2-48PS ) running fine. There is a plan to introduce a fourth stack member ( 3750X-48P ) into this stack.as per cisco documentation, it suggests to use 3750X as master for a mixed stack. In this case, we will need to upgrade current other 3 stack switches to a latest version.,Can we do a no-downtime ios upgrade on the existing 3-switch stack?, when this upgrade is done, is there any way to have the new ios pushed down to all three stack members at the same time or do we need to each member upgrade seperately?, for adding the fourth member, is it acceptable if master is ruuning ver eg. 12.2(55) and all rest of the members run ver 12.2(53) ? will this create any issues and will stacking be successful.

View 5 Replies View Related

Cisco :: 3750 Stack Member Loss Power?

Jun 10, 2012

I have a switch stack with three WS-C3750X-48 switches running 12.2(55)SE. Recently, stack member 3 went offline for a few minutes, after being online for over a year. A show version on member 3 reports that the system returned to ROM by power-on.

Stack member 3 shares a UPS with a router that did not lose power and all three stack members have stack power with four 350 WATT power supplies between the three of them. There are no crashinfo files on any of the switches, log files show the stack ports on the other switches going offline then switch 3 being removed from the stack.

Surveillance recordings show there was no one near the switch during the time and AAA accounting shows no clues. Is it possible the switch crashed without leaving a trace in the logs, a crashinfo file and report that it returned to ROM by power-on?

I've read before that loose stack cables can cause stack member reboots. Would such an event generate log messages other than the stack ports changing states to down?

View 6 Replies View Related

Cisco Switching/Routing :: CBS 3120X-S Switch Stack Member Down

Mar 4, 2012

I have a 3 member CBS3120X-S stack in a HP C7000 enclosure (switches 1, 3, and 5). Switch 1, (the previous stack master) is not showing up in the stack and all the ports are down. Switch 3 has taken over as master, but I don't know what happened to switch 1.  The system and stack lights are green and I am not seeing any messages in the log. I reset switch 1 and that did not resove the issue. I disconnected the stack cable and reset the switch again (pulled it out and pushed it back in) and connected to it with a console cable. I get nothing on the console, not even rommon mode. I was connected at the default baud rate that worked when I connected the conole of the other switches in the stack, so I don't think is a serial configuration issue. If this is CBS hardware problem, I don't understand why the system light is green.

Switches 1,3, 5 and provision configuration:
 
switch 1 provision ws-cbs3120g-s
switch 3 provision ws-cbs3120x-s
switch 5 provision ws-cbs3120g-s

[Code].....

View 1 Replies View Related

Cisco Switching/Routing :: Replacing 3750X Stack Member?

Feb 7, 2012

I have two 3750X in a stack. Each 3750X has one 10Gb uplink to primary core1 and one 1Gb uplink to backup core2 configured in 2 etherchannel groups. The member switch has bad ports, so I need to replace it. I have spare 3750X unit. Is it possible to connect the spare unit to the stack and then move the RJ-45 cables from the member with bad ports to the new member? That way I can minimize servers downtime to just a few seconds..If that would work, then the last step would be to move the 10Gb networking module from old member to the new one, as well as the secondary PSU. Is it doable? Also according to the documentation, all I need to add new member is matching IOS version, correct?

View 1 Replies View Related

Cisco WAN :: 3750 - Access Switches Not Accessible When Stack Member Got Rebooted

May 20, 2012

We have got 2 3750 switches in the stack which are connected to access switches with 2 uplink ports .  each 1 uplink from each physical stack switch .
 
Due to some power issue our member switch got rebooted. After the reboot the access switches were not reachable through ping , but i was abe to see access switches in "show cdp neighbour" .   Then i rebooted the master switch and member switch one after other . after which i was able to ping the access switches.
 
IOS Version : c3750-ipservices-mz.122-35.SE5.bin

View 3 Replies View Related

Cisco Switching/Routing :: 3750E-24PD-S Stack Member Fan Failed Syslog Message

Aug 6, 2012

I have a pair of 3750E-24PD-S stacked together, it seems after stacked together the stacked switch always flood the console screen with these messages which are not true: [code] Switch-2 is the stack member, Switch-1 is the stack master. The RPS fan failed refers to RPS2300 or the internal power supply of 3750E? Even when I turned on the RPS2300 the stacked switch still display the messages. Also I have two RPS2300 serving stack master and stack member respectively both RPS2300 were switched off why the messages only refer to Switch-2 and not Switch-1? [code]

View 1 Replies View Related

Cisco Switching/Routing :: 3750 / Replacing Failed Member In Stackwise?

Dec 18, 2012

The stackwise marketing info states that when a failed member is replaced with a new switch the replacement switch "gets the exact configuration of the old device".  I would figure it takes a little more than just disconnecting and connecting a new switch in the same spot on the stack. doing this with 3750 family switches?  What are the steps to prepare the stack for a new member?  what steps need to be taken on the replacement switch before insertion into the stack to make sure it gets configured like the unit it was replacing?

View 5 Replies View Related

Cisco Switching/Routing :: 2960 S - Stack Of 4 Unable To Console From Members?

Sep 10, 2012

I have stack of 2960 S  switches.I can console only from Master not from memember switches is this default behaviour?

View 1 Replies View Related

Cisco Switching/Routing :: Can't Connect To Console On 3750X Stack Members

Oct 23, 2012

I have a 3750X stack of 6 switches, I have a terminal server console server plugged into the console ports of all 6 switches. I am having a strange issue where I can connect to the master via the console, get a login prompt then I can log in, but when I try and connect to any of the members then I get a prompt "Press RETURN to get started" When I push return, it just loops back to the same prompt again:
 
switch-6 con0 is now available
Press RETURN to get started.
 
switch-6 con0 is now available
Press RETURN to get started.
 
I can connect to the stack via SSH fine etc. I am running 15.0(1)SE2. The stack is configured for TACACS+ auth via Cisco ACS.
 
Switch#  Role   Mac Address     Priority Version  State
----------------------------------------------------------
*1       Master f0f7.55ba.2700     15     1       Ready              
2       Member f0f7.5541.da00     14     1       Ready              
3       Member a493.4c1e.4b80     13     1       Ready              
4       Member f0f7.5585.cb80     12     1       Ready              
5       Member a44c.1120.8e80     11     1       Ready              
6       Member a493.4cc0.fa80     10     1       Ready     

View 4 Replies View Related

Cisco Switching/Routing :: 3750 Turn Off 802.1x Console Messages

Dec 16, 2012

Is there a way to turn off 802.1x authentication messages to the console of a 3750 switch? The issue we have is that we like to monitor the terminal when remotely configuring our switches. However, every time a computer authenticates to the network we get messages and sometimes quite a few depending on the situation.

View 3 Replies View Related

Cisco Switching/Routing :: Adding 3750 To Stack?

Dec 6, 2011

I have two  3750s stacked and one 3750 standalone all in one data closet. The both have the same versions. I want to combine them to make one stack. How do I force the standalone to be the master? sw 1 priority XX(Higher then the existing stack)? Both the stack and the standalone have management addresses. Would it be ok to delete the stack ip address? That way, the standalone(master's address will be the only management address)?How should I connect the standalone 3750 to the stack? At present, the 3750 stack is connected via a cascade cable going from the stack 1 port of the top switch to the stack 2 port of the bottom switch.

View 19 Replies View Related

Cisco Switching/Routing :: 3750 Stack Port

May 19, 2013

I have a stack of 4 3750 Switches.
 
1. WS-C3750G-12S
2. WS-C3750G-12S
3. WS-C3750X-48P
4. WS-C3750X-48P
 
The stack cable connected to Switch 1 Port 1 and Switch 4 Port 2 will not come back online. The logs show that there was a Stack line change. I have replaced the 1 meter Stack cable from Switch 1 to Switch 4 three times and it still does not come back online. This is the part that is interesting.. I have disconnected Port 1 Switch 4 and connected it to Port 2 Switch 4 and then Switch 4 came back online. This made me think Port 2 on Switch 4 was working correctly. Then I disconnected Port 2 Switch 1 and connected it to Port 1 Switch 1 and then Switch 1 came back online.

View 1 Replies View Related

Cisco Switching/Routing :: 3750 Stack CPU Utilization?

Feb 20, 2013

i have two cisco 3750 in stack firts, master switch have all swports busy second have only 5 how can i see cpu utilizations of the second switch, and its reasonable to move somme devices from first switch to second for deacreases of cpu and memory utilisatio ns of the master? the stack tehnologies use both cpu as one? or its only for simple management ?

View 9 Replies View Related

Cisco Switching/Routing :: Stack Port Down On 3750

Mar 11, 2013

have a cable i think is bad, is it possiable to switch the cable out without causing any downtime to the switch or connected devices?
 
HQ-1st-Flr-Stack#show switch stack-ports summary
Switch#/  Stack   Neighbor   Cable    Link   Link   Sync      #         In 
Port#     Port              Length    OK   Active   OK    Changes   Loopback
Status                                          To LinkOK   

[Code].....

View 15 Replies View Related

Cisco Switching/Routing :: Upgrading A Stack Of 3750

Apr 29, 2012

I just need a little refreshing on upgrading a stack of 3750's.  This stack only has 2 switches: [code]

1.) If I remember correctly I simply tftp the IOS to the flash of each switch and then reload the master only?
2.) Can I safely assume these are the 2 flash locations:

View 3 Replies View Related

Cisco Switching/Routing :: 3750 / Add A New Switch In Stack?

Jun 21, 2012

i want to remove an access layer 3750 48 POE master switch and replace with a  new 3750 switch in the stack. i want to copy the same configuration to new switch since the old switch is having POE issue and I got replacement of the malfunctioned switch. we have VTP domain is configured in the network...

View 3 Replies View Related

Cisco Switching/Routing :: 3750 Add A Config To Stack?

Mar 15, 2012

I have been given 2 3750 switches and need to put a config onto it wuld is for 2 3750's in a stack, how should I put this on the 2 switches?  Is it bested to install it onto 1 switch first then physically attach the 2nd after?

View 3 Replies View Related

Cisco Switching/Routing :: 3750 12.2(46) WCCP Stack

Nov 21, 2011

I'm setting up a web cache using the wccp protocol on a Catalyst 3750 stack.
 
Probably missing something real simple here but when I from the global configuration mode are trying to enter the ip wccp command it just says "invalid input" from wccp. There is no such command.. should be supported on my device from IOS 12.2(37)

View 1 Replies View Related

Cisco Switching/Routing :: Etherchannel Does Not Go Up / Up From 3750 Stack To 6k5 Vss

May 19, 2012

We have two 6k5 configured as vss and it is working fine. For each floor we have a 3750 stack. In each 3750 stack we have 4 switches. From the first 3750 we have a fiber link to the first 6k5 and from the fourth switch we have another fiber link to the other 6k5 switch, for each floor/3750 stack, both configured as etherchannel. We installled each 3750 stack/floor in different maintenance windows; in all these installations we have problems configuring the etherchannel. After we configure the etherchannel on 3750 stack and in the vss, the etherchannel does not go up/up. We see the etherchannel up/down; after a lot off work, try and error, configuring shut/ no shut, adding and excluding links from the etherchannel; in any aleatory moment the etherchannel goes up/up and works fine. Is there any bug related with these IOS versions, or is there any right procedure to configure etherchannel from vss to 3750 stack?

3750 stack config (IOS
Cisco IOS Software, C3750 Software (C3750-IPBASEK9-M), Version 12.2(50)SE1, RELEASE SOFTWARE (fc2))
interface GigabitEthernet1/0/1switchport trunk encapsulation dot1qswitchport trunk allowed vlan 100,101,371,372switchport mode trunkchannel-group 1 mode on!interface GigabitEthernet4/0/1switchport trunk encapsulation dot1qswitchport trunk allowed vlan 100,101,371,372switchport mode trunkchannel-group 1 mode on!interface Port-channel1switchport trunk encapsulation dot1qswitchport trunk allowed vlan 100,101,371,372switchport mode trunk

[code]....

View 7 Replies View Related

Cisco Switching/Routing :: 3750 Stack And Trunking

Mar 5, 2012

I currently have 5 3750s connected via Stackwise. This stack is connected back to my core (6509s) via fiber (1Gig to Core1 & 1Gig to Core2). I want to move the 5th 3750 to another closet due to an addition of a new patch panel. Due to max length of 10 ft. for stackwise, my plan is to connect this 5th switch back to the stack using trunked fiber ports, with them being an etherchannel (2Gig). Also plan to use single fiber port form 2 different switches in the stack to provide some redundancy for the 5th switch. Should I be alert of any issues with this connection design? Do I need to properly remove the 5th switch from the stack using, no sw 5 provison sw-model or can I just disconnect stackwise and connect back with fiber?

View 2 Replies View Related

Cisco Switching/Routing :: Adding A New 3750 To Stack

May 29, 2012

I had 2 3750 stacked and one of them decided to die (power supply) cisco replaced it and now i want to re-add that switch to stack. I have already upgraded my replacement switch to the same IOS version.I was reading that i can do it without powering down operational 3750 so the action plan so far is:
 
-power down NEW member
-connect stacking cable
-power up
 
as you can see my switch 2 is now a master and it still holds config of all Gi ports for switch 1. If i connect my NEW switch without any config (vlan.dat and startup-config) will my existing switch 2 copy all ports config to new switch ?

View 4 Replies View Related

Cisco Switching/Routing :: 3750 Stack Crash

Oct 22, 2012

We had an "Event" on our process network at the mill yesterday.  I connected a new WS-C3560V2-48TS-S to our network and we lost communications with all of the other switches.
 
The core is a stack of 3 WS-C3750 switches, one is a -24TS-1U and the other two are -12S-S.  These connect to 10 WS-C3560G-24TS and 5 Rockwell Stratix 8000 (IE3000) over fiber.  I am planning on replaceing two 24 port switches with the new 48 port.  I had the switch configured and running at my work bench.  It was connected to the network with one sfp module and ran all weekend with no issues.  Yesterday afternoon I took it to the network cabinet and installed it.  I powered it up and connected two sfp modules to the fiber patch panel and made the connection at the core stack. 
 
Everything looked OK.  I had communication link lights working on everything.  Within minutes, we lost communication with every switch connected to the core stack.  I shut down the new 48 port switch and the network slowly came back up.
 
The new 48 port is configured with Flex Links for the fiber redundancy protocol and was connected to each of the 3750G-12S-S stack members.
 
I though it might have been a power issue but the stack is UPS protected and shows it has been up for over 10 weeks.  I'm not even sure "Crash" is the best decription for what happened.  The new switch has a high enough IP address that it would not take over as a IGMP Querier.

View 1 Replies View Related

Cisco Switching/Routing :: Mixed 3750-X And 3750G In A Stack?

Jul 17, 2012

Any one try to form a stack with mixed 3750-X and 3750G? Is there any prerequisites in hardware and software?

View 5 Replies View Related

Cisco Switching/Routing :: Add A New 3750x To Existing Stack Of 3750

Aug 2, 2012

I've a situation where I need to add a new 3750x to a existing stack of 3750. [code] When I tried to stack them together, I get a version mismatch error. Is this because of the difference in SW Image?  What are my options next ? My ultimate goal is to make the new switch stack correctly with the exisitng switches.

View 11 Replies View Related

Cisco Switching/Routing :: Stack Behaviour Of 3750 Switch

Nov 17, 2012

I configured 3750 A  switch with vlan 20 and its IP address 192.168.20.41Its default gateway was 192.168.20.3Then i configured 3750 B  switch with same default gateway and vlan 20 IP   192.168.20.43My question is now when we stack it becomes single switch and now vlan 20 ip address is 192.168.20.43 thats only IP i can see.So how does stack switch choose vlan 20 IP?Does it choose highest IP address between two switches if they have same vlan 20 as in my case?Also when i go to switch 3750 b by session command and do sh ip route  it does not show ip default gateway .Also it shows vlan 20 as admin down .

View 5 Replies View Related

Cisco Switching/Routing :: Changes In TP If Replace 3750 Stack With 3750GS

Jan 4, 2013

I am replacing our 2 3750s which are in a stack and are running in VTP server mode for the domain with 2 new 3750Gs.  There are 4 trunks to other switches which bare in client mode and 2 trunks to 2 ASAs which are in active/standby mode (one in each switch).  Anyway what will happen to the VTP clients when I replace the stack as the revision number will be 1 on the server?  The clients will ignore any VTP updates from the server ?

View 6 Replies View Related

Cisco Switching/Routing :: 3750-X - How To Shutdown Only Switch In Stack

Aug 11, 2011

I have a doubt. In my environment I have two Switch 3750-X in stack.

My question is: How to shutdown remotely only a switch in stack?

View 23 Replies View Related







Copyrights 2005-15 www.BigResource.com, All rights reserved