Cisco Switching/Routing :: Changes In TP If Replace 3750 Stack With 3750GS
Jan 4, 2013
I am replacing our 2 3750s which are in a stack and are running in VTP server mode for the domain with 2 new 3750Gs. There are 4 trunks to other switches which bare in client mode and 2 trunks to 2 ASAs which are in active/standby mode (one in each switch). Anyway what will happen to the VTP clients when I replace the stack as the revision number will be 1 on the server? The clients will ignore any VTP updates from the server ?
View 6 Replies
ADVERTISEMENT
Feb 27, 2013
I have two like switches in a stack (WS-C3750G-48PS 15.0(1)SE2 C3750-IPBASEK9-M). Switch#1 is the master and is the one that needs to be replaced. Can I force Switch #2 to be the master, then power down switch#1, remove switch#1, insert the replacement, and then power on the newly added switch without shutting down or rebooting switch#2?
View 3 Replies
View Related
Jun 4, 2012
I have a stack of 2960S (c2960s-universalk9-mz.122-55.SE2.bin) and the master has failed (used to have a priority of 14). The second switch has become master (priority 1) as can be seen below: [code]
If I connect a new blank 2960S (same IOS) through the stack ports, will the master sync its config to the new one without causing problems?As I understand the new blank switch will also have a priority of 1 and will by default be numbered as 1. So if the config is correctly synced and I later on want to make switch 1 the master, I need to set the priority: [code]
View 4 Replies
View Related
Feb 17, 2012
Any experience interoperating Nexus 5548 or 5596 with Catalyst 3750 or 4507R?
We're looking into Nexus to replace these switches in the long run.
View 1 Replies
View Related
Jan 23, 2013
We currently have a stack of 3750G switches that are running 12.2(46)SE C3750-ADVIPSERVICESK9-M
Our 3750X is currently running 15.0(2)SE C3750E-UNIVERSALK9-M and I believe we were told you can't stack with a Universal IOS image. We have the universal on there because we have some 10GB fiber connections on it that Cisco told us wouldn't work otherwise.
I realize that the switch versions need to match, but the question is, which version should we work off to have use of the 10GB SFP card?
View 9 Replies
View Related
Dec 19, 2011
The other day 3rd party supplier ran some stats on our Gigabit link between 2 Cisco catalyst 3750Gs.now the graphs produced showed only a Maximum output of about 100Mbps ( 5 minute intervals) yet when I do a show interface it shows a lot more always 150Mbps and more. So I did my own Perl script doing an "sh interface" every minute and then graphed it, and the results were a lot different to the MRTG results.Questions: I know MRTG uses SNMP to get the traffic is there a bug in the SNMP, what OID does it use?does the "sh interface" give the correct results?
View 2 Replies
View Related
Dec 6, 2011
I have two 3750s stacked and one 3750 standalone all in one data closet. The both have the same versions. I want to combine them to make one stack. How do I force the standalone to be the master? sw 1 priority XX(Higher then the existing stack)? Both the stack and the standalone have management addresses. Would it be ok to delete the stack ip address? That way, the standalone(master's address will be the only management address)?How should I connect the standalone 3750 to the stack? At present, the 3750 stack is connected via a cascade cable going from the stack 1 port of the top switch to the stack 2 port of the bottom switch.
View 19 Replies
View Related
May 19, 2013
I have a stack of 4 3750 Switches.
1. WS-C3750G-12S
2. WS-C3750G-12S
3. WS-C3750X-48P
4. WS-C3750X-48P
The stack cable connected to Switch 1 Port 1 and Switch 4 Port 2 will not come back online. The logs show that there was a Stack line change. I have replaced the 1 meter Stack cable from Switch 1 to Switch 4 three times and it still does not come back online. This is the part that is interesting.. I have disconnected Port 1 Switch 4 and connected it to Port 2 Switch 4 and then Switch 4 came back online. This made me think Port 2 on Switch 4 was working correctly. Then I disconnected Port 2 Switch 1 and connected it to Port 1 Switch 1 and then Switch 1 came back online.
View 1 Replies
View Related
Feb 20, 2013
i have two cisco 3750 in stack firts, master switch have all swports busy second have only 5 how can i see cpu utilizations of the second switch, and its reasonable to move somme devices from first switch to second for deacreases of cpu and memory utilisatio ns of the master? the stack tehnologies use both cpu as one? or its only for simple management ?
View 9 Replies
View Related
Mar 11, 2013
have a cable i think is bad, is it possiable to switch the cable out without causing any downtime to the switch or connected devices?
HQ-1st-Flr-Stack#show switch stack-ports summary
Switch#/ Stack Neighbor Cable Link Link Sync # In
Port# Port Length OK Active OK Changes Loopback
Status To LinkOK
[Code].....
View 15 Replies
View Related
Apr 29, 2012
I just need a little refreshing on upgrading a stack of 3750's. This stack only has 2 switches: [code]
1.) If I remember correctly I simply tftp the IOS to the flash of each switch and then reload the master only?
2.) Can I safely assume these are the 2 flash locations:
View 3 Replies
View Related
Jun 21, 2012
i want to remove an access layer 3750 48 POE master switch and replace with a new 3750 switch in the stack. i want to copy the same configuration to new switch since the old switch is having POE issue and I got replacement of the malfunctioned switch. we have VTP domain is configured in the network...
View 3 Replies
View Related
Mar 15, 2012
I have been given 2 3750 switches and need to put a config onto it wuld is for 2 3750's in a stack, how should I put this on the 2 switches? Is it bested to install it onto 1 switch first then physically attach the 2nd after?
View 3 Replies
View Related
Jul 10, 2012
One of the stack member has failed and we need to replace the same with the new one.
[code],....
View 7 Replies
View Related
Nov 21, 2011
I'm setting up a web cache using the wccp protocol on a Catalyst 3750 stack.
Probably missing something real simple here but when I from the global configuration mode are trying to enter the ip wccp command it just says "invalid input" from wccp. There is no such command.. should be supported on my device from IOS 12.2(37)
View 1 Replies
View Related
May 19, 2012
We have two 6k5 configured as vss and it is working fine. For each floor we have a 3750 stack. In each 3750 stack we have 4 switches. From the first 3750 we have a fiber link to the first 6k5 and from the fourth switch we have another fiber link to the other 6k5 switch, for each floor/3750 stack, both configured as etherchannel. We installled each 3750 stack/floor in different maintenance windows; in all these installations we have problems configuring the etherchannel. After we configure the etherchannel on 3750 stack and in the vss, the etherchannel does not go up/up. We see the etherchannel up/down; after a lot off work, try and error, configuring shut/ no shut, adding and excluding links from the etherchannel; in any aleatory moment the etherchannel goes up/up and works fine. Is there any bug related with these IOS versions, or is there any right procedure to configure etherchannel from vss to 3750 stack?
3750 stack config (IOS
Cisco IOS Software, C3750 Software (C3750-IPBASEK9-M), Version 12.2(50)SE1, RELEASE SOFTWARE (fc2))
interface GigabitEthernet1/0/1switchport trunk encapsulation dot1qswitchport trunk allowed vlan 100,101,371,372switchport mode trunkchannel-group 1 mode on!interface GigabitEthernet4/0/1switchport trunk encapsulation dot1qswitchport trunk allowed vlan 100,101,371,372switchport mode trunkchannel-group 1 mode on!interface Port-channel1switchport trunk encapsulation dot1qswitchport trunk allowed vlan 100,101,371,372switchport mode trunk
[code]....
View 7 Replies
View Related
Mar 5, 2012
I currently have 5 3750s connected via Stackwise. This stack is connected back to my core (6509s) via fiber (1Gig to Core1 & 1Gig to Core2). I want to move the 5th 3750 to another closet due to an addition of a new patch panel. Due to max length of 10 ft. for stackwise, my plan is to connect this 5th switch back to the stack using trunked fiber ports, with them being an etherchannel (2Gig). Also plan to use single fiber port form 2 different switches in the stack to provide some redundancy for the 5th switch. Should I be alert of any issues with this connection design? Do I need to properly remove the 5th switch from the stack using, no sw 5 provison sw-model or can I just disconnect stackwise and connect back with fiber?
View 2 Replies
View Related
May 29, 2012
I had 2 3750 stacked and one of them decided to die (power supply) cisco replaced it and now i want to re-add that switch to stack. I have already upgraded my replacement switch to the same IOS version.I was reading that i can do it without powering down operational 3750 so the action plan so far is:
-power down NEW member
-connect stacking cable
-power up
as you can see my switch 2 is now a master and it still holds config of all Gi ports for switch 1. If i connect my NEW switch without any config (vlan.dat and startup-config) will my existing switch 2 copy all ports config to new switch ?
View 4 Replies
View Related
Oct 22, 2012
We had an "Event" on our process network at the mill yesterday. I connected a new WS-C3560V2-48TS-S to our network and we lost communications with all of the other switches.
The core is a stack of 3 WS-C3750 switches, one is a -24TS-1U and the other two are -12S-S. These connect to 10 WS-C3560G-24TS and 5 Rockwell Stratix 8000 (IE3000) over fiber. I am planning on replaceing two 24 port switches with the new 48 port. I had the switch configured and running at my work bench. It was connected to the network with one sfp module and ran all weekend with no issues. Yesterday afternoon I took it to the network cabinet and installed it. I powered it up and connected two sfp modules to the fiber patch panel and made the connection at the core stack.
Everything looked OK. I had communication link lights working on everything. Within minutes, we lost communication with every switch connected to the core stack. I shut down the new 48 port switch and the network slowly came back up.
The new 48 port is configured with Flex Links for the fiber redundancy protocol and was connected to each of the 3750G-12S-S stack members.
I though it might have been a power issue but the stack is UPS protected and shows it has been up for over 10 weeks. I'm not even sure "Crash" is the best decription for what happened. The new switch has a high enough IP address that it would not take over as a IGMP Querier.
View 1 Replies
View Related
Jul 17, 2012
Any one try to form a stack with mixed 3750-X and 3750G? Is there any prerequisites in hardware and software?
View 5 Replies
View Related
Aug 2, 2012
I've a situation where I need to add a new 3750x to a existing stack of 3750. [code] When I tried to stack them together, I get a version mismatch error. Is this because of the difference in SW Image? What are my options next ? My ultimate goal is to make the new switch stack correctly with the exisitng switches.
View 11 Replies
View Related
Nov 17, 2012
I configured 3750 A switch with vlan 20 and its IP address 192.168.20.41Its default gateway was 192.168.20.3Then i configured 3750 B switch with same default gateway and vlan 20 IP 192.168.20.43My question is now when we stack it becomes single switch and now vlan 20 ip address is 192.168.20.43 thats only IP i can see.So how does stack switch choose vlan 20 IP?Does it choose highest IP address between two switches if they have same vlan 20 as in my case?Also when i go to switch 3750 b by session command and do sh ip route it does not show ip default gateway .Also it shows vlan 20 as admin down .
View 5 Replies
View Related
Aug 11, 2011
I have a doubt. In my environment I have two Switch 3750-X in stack.
My question is: How to shutdown remotely only a switch in stack?
View 23 Replies
View Related
Dec 13, 2011
attached diagram and following is the basic configuration on L3 and L2 switch. Is this configuration sufficient for simple routing?
L3SWITCH:
switch 1 priority 15
switch 2 priority 10
[Code].....
View 6 Replies
View Related
Jul 17, 2012
I am getting a version mismatch when adding the following 3750X to the 3750 stack:
WS-C3750X-48 12.2(55)SE3 C3750E-UNIVERSALK9-M
2 0 WS-C3750-24TS 12.2(25)SEA C3750-I9K91-M
Can I upgrade the 3750's to be able to correct this? Which version does this require?
View 2 Replies
View Related
Apr 21, 2013
What will be the recommended connectivity of stack power cable in 6 number of 3750x switches ?
Is it similar to the stack cable ?
View 3 Replies
View Related
Oct 30, 2011
We have a stack of 3 cisco swithes 3750s WS-C3750G-24TS 12.2(25)SEB4 .We plan to recover a switch from the stack as it is not needed any more The switch we plan to recover is the existing Master.If we change the priority (switch 1 priority) and make another switch the master using command line will we have any loss of connectivity to the servers conecting to the stack ?
View 1 Replies
View Related
Aug 6, 2012
Looking for feedback from other organizations that have large 3750 stacks. I've got one stack of (8) 3750's composed of (6) 3750G's and (2) plain 3750's. This particular stack is usually unresponsive to SNMP queries and often fails to write config when we make changes. After a couple tries it will finally go. Part of my probably here is likely the plain 3750's that always boot faster and come up as the master. I should manually set the master to one of the G's. What I'm wondering is who else has 7-9 3750's stacked and are they performing well for SNMP, telnet, etc? I've got another newer stack of 7 3750E's that I need to add one more switch to. Need to decide if I want extended downtime to break the stack up or just add the 3750X to make member 8 and hope it performs well. I have 50+ 3750 stacks working great on our campus.
View 1 Replies
View Related
Jun 10, 2011
Zero downtime 3750 stack upgrade?
View 1 Replies
View Related
Apr 4, 2011
I have 8 switches (different models) configured in stack:
Switch Ports Model SW Version SW Image------ ----- ----- ---------- ---------- 1 28 WS-C3750G-24TS-1U 12.2(55)SE C3750-IPSERVICESK9-M 2 26 WS-C3750-24P 12.2(55)SE C3750-IPSERVICESK9-M 3 30 WS-C3750X-24P 12.2(55)SE C3750E-UNIVERSALK9-M 4 30 WS-C3750X-24P 12.2(55)SE C3750E-UNIVERSALK9-M* 5 12 WS-C3750G-12S 12.2(55)SE C3750-IPSERVICESK9-M 6 30 WS-C3750E-24PD 12.2(55)SE C3750E-UNIVERSALK9-M 7 30 WS-C3750E-24PD 12.2(55)SE C3750E-UNIVERSALK9-M 8 30 WS-C3750X-24P 12.2(55)SE C3750E-UNIVERSALK9-M
Now I'm have IOS ver. 12.2(55)SE but from time to time I'm experiencing strange system freezing. It means that all systems connected to the stack are working very, very slow. It hapens ones, sometimes twice a month and takes 5 minutes. I didn't find anything strange in logs (neither on switch nor router). I would like to install other IOS version. Could you recomend me the most stable version for this stack (built from these different models) ?And the secound question: - Is it possible to copy SE1 manualy to every switch and reload one by one manualy. Will they join the stack and work fine after reload or maybe there will be a IOS mismatch ?
View 10 Replies
View Related
Nov 20, 2011
if I read the Datasheet of Catalyst 3750X-Series-Switches it is possible to connect a new X-Switch to an existing and old Catalyst 3750-Series Stack.What kind of requirements are needed? Only same IOS-Version in the hole Stack and if possible same Feature-Set? .... like in a normal NOT mixed Stack?
View 4 Replies
View Related
Feb 3, 2009
Zero downtime 3750 stack upgrade
View 3 Replies
View Related
Feb 23, 2012
Every link and guide i see about stacking two 3750 switch , the port 1 is connected to port 2 on the other switch and vice versa
i mean you can connect port 1 to port 1 on the other and connect their port 2 to each other
1- is it any benefit in the cross connection ?
2- do i encounter any problem if i stack a 24ts with a 48ts or a 12s-s (all are 3750)
3-i stacked two switches with each other and the ports became 1/0/* and 2/0/* and then i removed stack but on second switch the ports are still 2/0* !! when there is only one switch the interfaces should be 1/0/*
View 4 Replies
View Related