Cisco Switching/Routing :: Add A New 3750x To Existing Stack Of 3750
Aug 2, 2012
I've a situation where I need to add a new 3750x to a existing stack of 3750. [code] When I tried to stack them together, I get a version mismatch error. Is this because of the difference in SW Image? What are my options next ? My ultimate goal is to make the new switch stack correctly with the exisitng switches.
I have 3 3750 staking switch with the following configuration:
H/W Current Switch# Role Mac Address Priority Version State ---------------------------------------------------------- 1 Member 442b.0350.9400 1 1 Ready 2 Member 442b.0357.8780 2 1 Ready 3 Master 442b.036f.a800 3 1 Ready
The new switch is installed to be wired to the master switch. the swtich 3 (* 3 Master Ready 442b.036f.a800)my question is: if you disconnect the wiring from the master stack to connect to the new switch, it is possible that the new switch change the current configuration of stacking.
-Can I just add the new switch with clean configuration without changing the current configuration ? -How is assigned the stack number? i need the new switch be with the GI4 / x?. I can I manually by assigning ports? -If I want to the new 3750 member witch lower prioridad, can I change priority before adding to stack?
in our network we were using three 3750-48-s switches with stacking one of the switch due to some hardware failure power problem,
now i want to add a new switch 3750-48-s in the existing Stack two switches , the old two switches ios version is = 12.2(25r)SEC the new Catalyst 3750 io verion is = 12.2(35)SE5
how to add this switch in the existing two stack switches , with documentation
I have looked on notes to add a switch to an existing stack and haven’t identified answers on how the IOS will be affected on the new switch – will it downgrade to the current stack version or will the current stack upgrade to its version. At this moment in time I would prefer if the new switch IOS downgraded to the current stack IOS version.The new switch is a 3750V2 – will this affect how it joins the stack?The new switch has the image of IPBASEK9-M – again will this affect how it joins the stack?
I am attempting to add and Catalyst 3750 - 12 port Gigabit switch to an existing stack of 3750 48 port switches (non-X fabric). I am not sure how to proceed. These are the two questions/thoughts I have. Any additional perspective I should have before proceeding.
What kind of configuration should I apply to the Gig switch before adding it to the stack?I am sure I will need to assign priority to the new switch, ideally, it will act as master.
if I read the Datasheet of Catalyst 3750X-Series-Switches it is possible to connect a new X-Switch to an existing and old Catalyst 3750-Series Stack.What kind of requirements are needed? Only same IOS-Version in the hole Stack and if possible same Feature-Set? .... like in a normal NOT mixed Stack?
I have 3 switches in my 3750 X stack. I am getting the following error in the logs: %PLATFORM_STACKPOWER-4-PRIO_CONFLICT: Switch 1's power stack has conflicting power priorities. Not sure what I should do next. Below is my Stack-power configuration:
Power stack name: Powerstack-1 Stack mode: Power sharing Stack topology: Ring Switch 1: Power budget: 735 Low port priority value: 20 High port priority value: 10 Switch priority value: 2 Port 1 status: Connected Port 2 status: Connected Neighbor on port 1: c464.1308.7900 Neighbor on port 2: e8b7.4827.e680 Switch 3: Power budget: 729 Low port priority value: 22 High port priority value: 13 Switch priority value: 4 Port 1 status: Connected Port 2 status: Connected Neighbor on port 1: 2894.0fd9.9f00 Neighbor on port 2: 2894.0fd8.e200 Switch 2: Power budget: 690 Low port priority value: 21 High port priority value: 12 Switch priority value: 3 Port 1 status: Connected Port 2 status: Connected Neighbor on port 1: 2894.0fd8.e200 Neighbor on port 2: c464.1308.7900
Each switch has its own 715W power supply in it and all check out OK.
I need to add two additional 2960S switches to my stack. I saw a diagram that showed how a 4 switch stack can be connected, but I couldn't find much detail on adding a switch to an existing stack (besides master election). The output below shows how the existing stack is connected and its state
SW#sh switch detail Switch/Stack Mac Address : 0011.2222.3333 H/W Current
[Code].....
I will need to break one of the stack rings between SW1 and SW2 in order to connect the new switches. Does it really matter which ring I break to connect the additional switches? Does one ring act as primary? If so, I'd rather not break that ring so this process is transparent as possible. Also, is there any benefit to disabling the stack port vs just disconnecting the cable?
I need to tear down an existing port-channel on a 3750X running c3750e-universalk9-mz.150-1.SE3.bin. This port channel is currently down down. It has three ports in it that will be added one each to three existing port-channels, I am assuming as long as the "channel-group" command is exactly the same as it is on the three existing port-channels I should be ok just adding the new port. One point to note is that the three existing port-channels all have three ports so this will be adding the fourth port to each port-channel. I know after reading that it is a best practice for load balancing to use either 2, 4, or 8 ports for a port-channel. Also what is the command to see all ports that are in a port channel?
I'm trying to review a QoS setup, and I'd like to make sure I fully understand the current setup before I change anything. I'm seeing output drops on two different queue-thresholds, but not sure how packets are making it to one of the queues.
Switch Version CORE#show ver Cisco IOS Software, C3750E Software (C3750E-UNIVERSALK9-M), Version 15.0(2)SE, RELEASE SOFTWARE (fc1) System image file is "flash:/c3750e-universalk9-mz.150-2.SE/c3750e-universalk9-mz.150-2.SE.bin" cisco WS-C3750X-24 (PowerPC405) processor (revision A0) with 262144K bytes of memory. Switch Ports Model SW Version(code)
I can find queue4-threshold3 in the mappings, but how are packets getting mapped to queue2-threshold1? The priority queue is disabled for this interface, so I'm not sure how this queue is dropping packets, according to the maps nothing is mapped to 02-01.
I have to add a 2960s PoE switch to an existing stack of two 2960s PoE switches. If The new switch has no configuration on it and the existing stack is broken by pulling te stack cables and then new cables are added and everything re-cabled correctly will the new switch assume the configuration from the stack without any issues?
I am having an issue with adding a c3750x switch to an existing switch stack Currently there is 2 x WS-C3750X-48P and I am trying to add another WS-C3750X-48P to this switch I have cabled the switch to the stack using the stack cables and added the command to provision the switch on the exisitng stack. However when I turn the switch on it just goes on its own stack.
I noticed the new switch had a later version of IOS so have downgraded this to the same version as the other switches but still no joy Here is the sh ver from the exisitng stack
uptime is 4 weeks, 4 days, 23 hours, 30 minutes System image file is "flash:/c3750e-universalk9-mz.122-53.SE2/c3750e-universalk9-mz.122-53.SE2.bin" License Level: ipbaseLicense Type: PermanentNext reload license Level: ipbase cisco WS-C3750X-48P (PowerPC405) processor (revision A0) with 262144K bytes of memory.Processor board ID FDO1448Z0FJLast reset from power-on21 Virtual Ethernet interfaces1 FastEthernet interface156 Gigabit Ethernet interfaces6 Ten Gigabit Ethernet interfacesThe password-recovery mechanism is enabled.
On first floor, I have two stack switches and each stack has got 4 switches. they all are working fine.Now the client would like to add one more stack on the 2nd floor. But the second floor switches are different when compared to the 1st floor switches.
can you have differnt IOS among different stacks. I knew in a stack we need all the switches should have same IOS version. But in between two stacks to communicate do we need same IOS or they can be on differnet IOS?
1st floor switches have 15.0 version and 2nd floor new switches has 12.2.58. Is this ok ?
1st floor switches are 3500 series ( Note: only one one Vlan 20 we are using on the both stack switches and we would like add same Vlan 20 on to the new stack)
2nd floor switches aew 2 catalyst 2960 switches.
Note: on the second floor switches one is 24 port switch and the other one is 48 port switch. so can i make them as a stack?
We have already done cabling from 1st floor to second floor. So no problem with that at all.
This 3750X stack (3 members) has some 100% cpu spikes. Is this bad enough to start tracking down the cause(s) or is this somewhat typical and not a reason for concern? I just took this reading. How can you detemine when the 100% and 80% spikes occurred?
I recently created a stack using (2) 3750x switches. I have three vlans on the stack (1,105,241) Vlan 105 is configured on 6509 core switches with multicasting and are connected to the stack via gigabit fiber. It is working well with clients on the Master or SW1, however clients on SW2 do not participate in multicasting Any client pc that is connected to SW2 vlan 105 does not show up in the "sh ip igmp snooping group" command. I can statically assign a client on SW2 to the mcast groups but but they fail to register on their own. I can take the cable connection from SW2 and plug it into an SW1 Vlan 105 port and it immediately becomes a member of the groups. I can then connect it back to the SW2 port and it disappears from the group membership. IGMP and PIM are configured with the defaults.
Seeing very high CPU on one of our 3750X stacks. Usally its around 30% but recently its 70, 80, 90 or maxed at 100% during the main day.IOS version c3750e-universalk9-mz.122-55.SE1.bin.Has a ten gig uplink connected to a nexus 7k and another ten gig connected to another 7k. Running Layer 3 and EIGRP on the 3750X.Is this normal for the CPU?
#sh processes cpu history 5555555554444455555555555555588888666669999888885555577777 8888000001111111111222227777755555666662222222229999977777 100 90 ***** **** 80 ***** ********* *****
I have a stack of three 3750X-24P-S switches. Each switch has two PSU's.If I do a SH INVENT, switch 2 only lists Power Supply 0
If, however I do a SESS 2 onto the second switch in the stack and then do a SH INVENT, it shows both power supplies. Is it anything to be concerned about?
I'm trying to use LMS to upgrade a stack of switches that have 1 or more 3750x's and other 3750's. In Software Distribution, if I choose Distrube to devices, basic, it finds the x switch, which is the master but says the others are not candidates. I don't see a place where I can tell it it is a mixes stack and choose multiple IOS's.
I have two WS-C3750X-48PF-S in stack, but every one has just one power supply. In the package of the switches is included one stack power supply cable.does it make sense to use stack power cable if every switch has just one power supply ??
Switch 2 has an interface configured in RSU Standby.Switch 3 has an interface configured in RSU active. The upgrading sequence is : Switch 2, Switch 1, Switch3.The aim of the test is to prove that there is no loss of IP connectivity throught the RSU process.During the RSU process, there are ping between all the computers.
IOS starting version : 15.0-1.SE3 IOS upgrading version (with OVERWRITE) : 15.0-1.SE3 (same version)
1rst step : Switch 2 reboot and come back master but isolated from original stack (switch 1 and 3)
2nd step : Switch 1 reboot, and come back with switch 2 into the upgrading stack.
Issue : at this step :
- Switch 1 put its interface (IP 192.168.5.254) up :
- Switch 3 has not reboot and still has its interface (IP 192.168.5.254) up
=> we have some OSPF adjencies and mac flapping issues : switch 1 and 3 are trying to mount there OSPF adjencies on the same IP. We loss our IP connectivity since step 3 is not over.
3rd step : Switch 3 reboot and come back up in the upgrading stack. The IP connectivity is back, and the RSU process is done.Is that a normal behaviour ?How can we avoid to loose IP connectivity during RSU process ?
IOS upgrade tried on the stack of 2XWS-C3750X-24T-S , Upgrade was tried to support WCCP on the platform. Current version is Cisco IOS Software, C3750E Software (C3750E-UNIVERSALK9-M), Version 12.2(58)SE1, Not able find any IP Plus ios in the site ? Only available are IP base and Universal K9 , Tried upgrading to c3750e-universalk9-tar.122-58.SE2.tar by using stack upgrade method as per document [URL]
Upgrade fails with error :
%Error opening flash:update/info (No such file or directory) ERROR: Image is not a valid IOS image archive.
Why current ios is not supporting WCCP , I hope it is there in the featureset. ( tried "sdm prefer routing" but no success) Does c3750e-universalk9-tar.122-58.SE2.tar will give me wccp support ? What is the issue with my upgrade and how do I do a successfull upgrade ?
We recently configured a stack of four 48 port 3750-x switches . We are noticing high CPU usage. "Hulc LED process" seems pretty high. This has coincided with VMware servers getting slow and non-responsive at times, perhaps a coincidence, not sure. Below I provided some outputs about how to diagnose it.
Our customer has a stack of 6 3750G switches. They want to add another switch to the stack. I tried to quote another G, but I got a warning that the G series is EOS January 30,2013. Can I add a 3750X to the stack? I know that no matter what switch I get, I will have to upgrade the IOS in the stack, as the stack is running 12.2(25)SEE2.
I have a 3750X 24 port switch (with NM-1G network module) running IOS 15.0(1). Is there any benefit or reason to plug in the included Stack Wise cable and loop it back to itself in a single switch installation?
I don't see any recommendation in the documentation. The data sheet indicates a single switch is a non-blocking device so I'd think there's no bandwidth advantage like there is when connecting an actual multi-switch stack and needing to close the loop for the full 32 Gbps stack bandwidth.
Is that possible to configure a stack between then?
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Tenho um cisco WS-C3750G-24TS com o IOS flash:/c3750-ipservicesk9-mz.1 22-25.SEB4.bin" Adquiri um novo cisco WS-C3750X-24 com o IOS flash:/c3750e-universalk9-mz.150-1.SE/c3750e-universalk9-mz.150-1.SE.bin.
I have two 3750X in a stack. Each 3750X has one 10Gb uplink to primary core1 and one 1Gb uplink to backup core2 configured in 2 etherchannel groups. The member switch has bad ports, so I need to replace it. I have spare 3750X unit. Is it possible to connect the spare unit to the stack and then move the RJ-45 cables from the member with bad ports to the new member? That way I can minimize servers downtime to just a few seconds..If that would work, then the last step would be to move the 10Gb networking module from old member to the new one, as well as the secondary PSU. Is it doable? Also according to the documentation, all I need to add new member is matching IOS version, correct?
I have two 3750G switches stacked together however it's not in a full ring configuration:
Stack Ring Speed : 16G Stack Ring Configuration: Half Stack Ring Protocol : StackWise
And as shown below it's obvious which cable is not working:
show switch neighbors Switch # Port 1 Port 2 -------- ------ ------ 1 2 None 2 None 1
It's not flapping - it's like the cable isn't there at all. I'm going to try reseating the cable in there and perhaps an all out replacement if necessary. My question - is there any threat of a reboot of the switch stack or of partitioning of the switch stack by trying to get the 2nd cable working?
i am seeing very high utilization on a random basis on the stack. and the logs indicate me that there is a pattern where there is a stack power cable shows inserted (which was never unplugged) followed by sudden spike in the utilization.
001018: *Mar 6 16:21:22.138: %PLATFORM_STACKPOWER-6-CABLE_EVENT: Switch 4 stack power cable 1 inserted 001019: *Mar 6 18:18:37.982: %SYS-1-CPURISINGTHRESHOLD: Threshold: Total CPU