Cisco Switching/Routing :: 3750X - Adding Ports To Existing Port-channel
Jan 29, 2013
I need to tear down an existing port-channel on a 3750X running c3750e-universalk9-mz.150-1.SE3.bin. This port channel is currently down down. It has three ports in it that will be added one each to three existing port-channels, I am assuming as long as the "channel-group" command is exactly the same as it is on the three existing port-channels I should be ok just adding the new port. One point to note is that the three existing port-channels all have three ports so this will be adding the fourth port to each port-channel. I know after reading that it is a best practice for load balancing to use either 2, 4, or 8 ports for a port-channel. Also what is the command to see all ports that are in a port channel?
View 1 Replies
ADVERTISEMENT
Apr 3, 2013
current topology is build from 4 6500 switches connected in a ring topology. Using Port channel (2x 10Gbit) links to connect left side top and bottom 6500's (DC1), 10 G bit link to connect right side 6500's (DC2) In between a 1 G bit link is used to connect top 6500's (DC1-DC2) and the same for bottom 6500's (DC1-DC2).
Path costs are 5 and 6 so the T5/4 from bottom right is blocking. Bandwidth demands are increasing, so thinking about adding extra 1 G bit links to the existing ones and create ether channels. Path costs here are 4 and 5, so T5/4 from bottom right is still blocking, but when the bottom 2 G bit port-channel is loosing one 1 G bit link the path costs of both directions become equal. So I am worried that STP will not re converge and leave me with a congested 1 G bit link. I cannot test this setup in a lab, are there any options for STP to re-converge here?
View 1 Replies
View Related
Jan 15, 2012
What I am attempting to achieve is to aggregate trunk ports out of a VMware server into a single logical connection to give as much bandwidth as possible, the switches are 3750X and are three stacked together with the server connections spread across the stack. What I am not sure about is if two port channel load balance protocols can happy co-exist on the switch, by default the switch is using MAC address load balancing and Vmware wants to use IP Source load balancing. As other trunks and channels exist on the switch I don't want to make a change that will affect the other live connections if changing this is a global setting and not local on the channel.
View 2 Replies
View Related
Feb 26, 2012
Possible to configure multichassis port-channel between a VSS and 3750X (Port-channel not in the same switch on the 3750X stack). I got it using LACP but I need Pagp to get VSL redundancy “dual-active detection pagp trust channel-group 1”. I am using the last VSS IOS version 15.0(1)SY. I can’t get the option “switch 1 preempt”, has it changed with other option?
View 2 Replies
View Related
Jan 20, 2012
I need adding a vlan to the trunks bundled in port channel. I know how to add v lans to a port channel with Cisco IOS but with CAT OS.
I have 2 ports bundled to form ether channel in switch which is running CAT OS. There are already few v lans allowed in the trunk of each interface. now I need to add one more v lan.
For Example:-
v lan 135 needs to be added in addition to the existing v lans.
clear trunk1/2 1-112,115,117-134,136-4094
set trunk 1/2 on dot1q 113-114,116,135
and similarly on the 2nd interface
so if I add vlan135 to the trunk one after another will it cause any service disruption?
View 3 Replies
View Related
Dec 4, 2012
I am a bit confused by the output of 'show run' and 'show run switch-profile' that pertains to a port-channel interface configured in a switch-profile. My main gaol is to find out how can I add/remove the allowed vlans the port-channel (configured as trunk) carries. The setup is like this. I have 2 N5k in vPC domain and Etherner1/11 on both switches is configured as trunk vPC that connects to a core switch. When I issue ‘show run’ for the port-channel and physical interface I get the following output. [code] From above it seems the switch-profile configuration is missing the 'switchport trunk allowed vlan' in the port-channel interface. If want I to remove vlan 30 from the allowed vlan, should I go under the switch-profile mode and remove vlan 30 from the allowed list even though the switch-profile configuration seems to be missing this.
View 2 Replies
View Related
Feb 18, 2013
I have two stacks 3750X on two different sites with two links L_2_L, and I want to configure the port channel to aggregate the two links.
Site A Site B
3750X -A1 --------------------------------------( )--------------------------------------- 3750X -B1
( L-2-L )
3750X -A2 --------------------------------------( )--------------------------------------- 3750X -B2
Below the configuration that I have put the two stacks.
site A
interface Port-channel5
description Etherchannel group entre le stack 3750X-A et Switch Lan_2_Lan
switchport trunk encapsulation dot1q
switchport trunk allowed vlan 11,12,999
switchport mode trunk
switchport nonegotiate
speed 100
But the problem is only one link is Bundeled in channel group, see below
Group Port-channel Protocol Ports
------+-------------+-----------+-----------------------------------------------
5 Po5(SU) LACP Gi1/0/15(I) Gi2/0/15(P)
View 8 Replies
View Related
Sep 12, 2012
Have 2 N2K with dual-connections to both 2 N5K, will all 4-ports of N5K will be the same port-channel. N2K as well ?
View 1 Replies
View Related
Feb 14, 2013
Can i configure access ports into port channel on Nexus 7K switch.If possible then provide the complete configuration.....
View 2 Replies
View Related
Mar 14, 2012
i have a VSS core that has 4 downstream links to 4 stacked switches. I connected each of the 4 links to different switch in the switch stack. I then created a port-channel that combines all the links from each switch. Is there any issues associated with this setup?
View 9 Replies
View Related
Mar 3, 2013
I need your input on how to appropriately introduce an N5K with Jumbo enanbled to a prexisting Core Network (Stack of Cisco 3750G Switches) without making any major alteration on the Core configs (everything is happy). The idea is to move two High I/O servers to the N5K during a transitional phase. I already have a fair understanding of what Jumbo-Frames are and what it does. Keep Jumbo-Frames within the N5K ONLY.
Conditions:
- Traffic is Data traffic, not storage/iSCSI
- The servers host our ERP applications and MySQL that is accessed heavily by users
- N5K to C3750G connectivity is a Port-Channel consisting of 4x1GB ports
- The servers are to remain on VLAN 2 (Data VLAN)
- The Core Switch is L3 and the boundaries reside here
View 1 Replies
View Related
Aug 2, 2012
I've a situation where I need to add a new 3750x to a existing stack of 3750. [code] When I tried to stack them together, I get a version mismatch error. Is this because of the difference in SW Image? What are my options next ? My ultimate goal is to make the new switch stack correctly with the exisitng switches.
View 11 Replies
View Related
Oct 1, 2012
I need to add two additional 2960S switches to my stack. I saw a diagram that showed how a 4 switch stack can be connected, but I couldn't find much detail on adding a switch to an existing stack (besides master election). The output below shows how the existing stack is connected and its state
SW#sh switch detail
Switch/Stack Mac Address : 0011.2222.3333
H/W Current
[Code].....
I will need to break one of the stack rings between SW1 and SW2 in order to connect the new switches. Does it really matter which ring I break to connect the additional switches? Does one ring act as primary? If so, I'd rather not break that ring so this process is transparent as possible. Also, is there any benefit to disabling the stack port vs just disconnecting the cable?
View 2 Replies
View Related
Dec 25, 2012
I have trunk etherchannel ports 47,48 which both have Vlans allowed on trunk 70,71. Everything works pretty fine. Now I am trying to add a new VLAN 72 to these ports.
conf t
interface FastEthernet0/47
switchport trunk allowed vlan add 72
exit
exit
So far so good. But when making the same command for port FastEthernet0/48 my switch stuck.
View 8 Replies
View Related
Mar 25, 2012
in our network we were using three 3750-48-s switches with stacking one of the switch due to some hardware failure power problem,
now i want to add a new switch 3750-48-s in the existing Stack two switches , the old two switches ios version is = 12.2(25r)SEC the new Catalyst 3750 io verion is = 12.2(35)SE5
how to add this switch in the existing two stack switches , with documentation
View 1 Replies
View Related
Nov 23, 2011
I am looking to add a new 3750 Switcch to an existing stack shown below
Switch Ports Model SW Version SW Image
------ ----- ----- ---------- ----------
* 1 26 WS-C3750-24P 12.2(35)SE5 C3750-IPBASE-M
2 26 WS-C3750-24P 12.2(35)SE5 C3750-IPBASE-M
3 26 WS-C3750-24P 12.2(35)SE5 C3750-IPBASE-M
[code]....
I have looked on notes to add a switch to an existing stack and haven’t identified answers on how the IOS will be affected on the new switch – will it downgrade to the current stack version or will the current stack upgrade to its version. At this moment in time I would prefer if the new switch IOS downgraded to the current stack IOS version.The new switch is a 3750V2 – will this affect how it joins the stack?The new switch has the image of IPBASEK9-M – again will this affect how it joins the stack?
View 5 Replies
View Related
Feb 27, 2013
I have to add a 2960s PoE switch to an existing stack of two 2960s PoE switches. If The new switch has no configuration on it and the existing stack is broken by pulling te stack cables and then new cables are added and everything re-cabled correctly will the new switch assume the configuration from the stack without any issues?
View 10 Replies
View Related
Dec 6, 2012
I am having an issue with adding a c3750x switch to an existing switch stack Currently there is 2 x WS-C3750X-48P and I am trying to add another WS-C3750X-48P to this switch I have cabled the switch to the stack using the stack cables and added the command to provision the switch on the exisitng stack. However when I turn the switch on it just goes on its own stack.
I noticed the new switch had a later version of IOS so have downgraded this to the same version as the other switches but still no joy Here is the sh ver from the exisitng stack
uptime is 4 weeks, 4 days, 23 hours, 30 minutes
System image file is "flash:/c3750e-universalk9-mz.122-53.SE2/c3750e-universalk9-mz.122-53.SE2.bin"
License Level: ipbaseLicense Type: PermanentNext reload license Level: ipbase
cisco WS-C3750X-48P (PowerPC405) processor (revision A0) with 262144K bytes of memory.Processor board ID FDO1448Z0FJLast reset from power-on21 Virtual Ethernet interfaces1 FastEthernet interface156 Gigabit Ethernet interfaces6 Ten Gigabit Ethernet interfacesThe password-recovery mechanism is enabled.
[code]....
View 3 Replies
View Related
Oct 16, 2012
I am attempting to add and Catalyst 3750 - 12 port Gigabit switch to an existing stack of 3750 48 port switches (non-X fabric). I am not sure how to proceed. These are the two questions/thoughts I have. Any additional perspective I should have before proceeding.
What kind of configuration should I apply to the Gig switch before adding it to the stack?I am sure I will need to assign priority to the new switch, ideally, it will act as master.
View 1 Replies
View Related
Jun 21, 2011
I have two 3750Xs for stack, and i want connect a 2960 switch on this stack with port-channel.I connect 2960 G0/1 to 3750X G1/0/24, and 2960 G0/2 to 3750X G2/0/24. [code] i try to config spanning-tree etherchannel guard misconfig, but no use finally, i have to use "no errdisable detect cause all"..i check the cisco.com, and find a information: for this case, channel-group can use mode desirble.but when i try to change the channel-group in 3750X stack, it shows me that: "with pagp enable, desirble mode must config in the same switch".i try to use mode desirble mode in G1/0/23 and G1/0/24 in 3750X stack, it still can not work.i want to know how to solve this problem? not only do "no errdisable detect cause all".
View 11 Replies
View Related
Jul 17, 2012
I am getting a version mismatch when adding the following 3750X to the 3750 stack:
WS-C3750X-48 12.2(55)SE3 C3750E-UNIVERSALK9-M
2 0 WS-C3750-24TS 12.2(25)SEA C3750-I9K91-M
Can I upgrade the 3750's to be able to correct this? Which version does this require?
View 2 Replies
View Related
Jun 13, 2012
Our customer has a stack of 6 3750G switches. They want to add another switch to the stack. I tried to quote another G, but I got a warning that the G series is EOS January 30,2013. Can I add a 3750X to the stack? I know that no matter what switch I get, I will have to upgrade the IOS in the stack, as the stack is running 12.2(25)SEE2.
View 2 Replies
View Related
Jan 22, 2013
I have hardcoded 1GB ports on 3750X to 1000 and full duplex for all servers connected. THe ports are not coming up with this speed and duplex settings. If I configure them to 100, I am able to see the port is up. Whereas if i connect the same servers to 2950 switches, i can see the ports working fine with 1000 speed ..we have tried with the latest universal IOS as well
View 7 Replies
View Related
Jul 15, 2012
We are having an odd occurance happening to our 3750x stacks. For no apperent reason ports will become unusable. Doing a shut/no shut on the ports has no effect. The weird thing is that the indicator lights will stay solid green even if there is nothing plugged into them. We had this happen a couple months ago and a reboot fixed the issue. But as it has happened again makes me think that is was not a fluke. As of right now it only effects a few ports.
current code we are running is Version 12.2(53r)SE2
View 4 Replies
View Related
Jan 31, 2012
I work at a hospital and we have 3750X-48P switches in stacks in various locations throughout the hospital. We have noticed that when an EKG machine is plugged into one of the ports on some of these switches and the EKG machines are set manually to 100/Full, the ports are no longer usable until the switch is restarted. The switch is configured for auto. If the EKG machine is set to auto, it will work and not cause problems. The link on the interface will show up/up and there will be output packets increasing. However, there will be no inputs on the link and the port is unusable. Unfortunately, even when the device is removed, the port becomes unusable for any device. Is there any way to fix this problem without rebooting the switch?
View 5 Replies
View Related
Feb 29, 2012
In my environment we have 3750x switches running ios 15.0 (1) SE2. We have port security mac address sticky configured on all our switch ports. I noticed that we have several interfaces (on different switches) that are up but have not captured the MAC address from the workstation. Here is one example:
interface GigabitEthernet2/0/11
switchport mode access
switchport port-security
[Code].....
View 21 Replies
View Related
Oct 23, 2011
is it possible to shutdown a specific port on my 3750x and monitor this port at the same time .for example , im dealing with a mac authenticated network using port security , i want to shut down all the ports that are not used at the moment , however , if some one gets connected to the one of the shutdown ports i want to know the mac address of the user or atleast to know that i have someone who is just plugged in to the one of the shutdowned ports .
View 4 Replies
View Related
Oct 8, 2012
I have 4 cisco 2960 switches to which many users are connected. No vlans are the only default vlan 1 is there. Now I want to make ether channel on switch 1 whcih has 24 fast etherenet ports. Can I make port 1- 8 as one ether channel which are connected to users or i can only make ethere channel of ports that are connectd to other switchs. If I can, how the other switchs will comnicate with the switch ports bundalled in the ether channel in switch 1.
View 6 Replies
View Related
Dec 19, 2011
Is there a switch that handle its 24/48 ports at 10 Gbps with copper?. I have checked 3750 X but just handle 2 SFP with 10 Gbps.The requirement is to use this switch as CORE and connect 12 switches (access) using its uplinks at 10 Gbps with copper ( in this case 3750 X can be used).using copper at 10 Gbps the distance is still 100 m?
View 9 Replies
View Related
May 28, 2012
we have just purchased a few 3750x's that we intend to add to our 3750g stacks. We've purchased the 10gb uplink modules, C3kx-nm-10gt, but when they are installed they are not appearing in the switches web gui nor can you configure them correctly. If we upgrade a 3750x to 15.0.1 they seem to work fine. All of our current 3750g's are running 12.2(58)SE2 IPBASE so we don't really want to have to upgrade them all to 15.0.1
Are we missing something or do the 10gb modules only work properly with ios 15.0.1?
View 3 Replies
View Related
Nov 29, 2011
I need to configure a port channel between two sw 4507R. with port Giga, but those port are in different modules.
Sw-1
interface GigabitEthernet5/48
description **** Conexion Switch-2*****
[Code].....
View 2 Replies
View Related
Dec 7, 2011
I have 3750 core/distribution switches with routing enabled in two offices connected with copper link and L3 port channel interfaces. NewOffice#2 has moved about 5 miles farther away from office#1 and I have to deploy new core/distribution switch connect it to old core#2 via F.O and move all access switches with it. Old core will stay in old #2 offices as a bridge between office#1 and new office#2 Office#1core<->copper (Ethernet) <->oldoffice#2core<->f.o. <->new office#2core How I should configure port channels ports on oldoffice#2 core to act as bridge between office#1 core/dist and newoffice#2 core/dist without changing anything else (ip, etc) on whole network
View 1 Replies
View Related
Apr 22, 2012
I have 2 Cisco 6509 switches linked together via single Fibre as a trunk.I want to change this to a port channel where I will add another 3 fibre ports to the port channel but what order do I do this to minimise any disruption.
1-Configure PortChannel and add the 3 new ports, this will bring up the Port Channel but what effect will this have on traffic currently going over the single Trunk link? Will spanning tree go mad, how will switches react?
2-Convert existing Trunk link to Portchannel then add in new ports to PortChannel, I guess in doing this there will be a small hit on traffic as it changes to a port channel.
View 2 Replies