I am getting a version mismatch when adding the following 3750X to the 3750 stack:
WS-C3750X-48 12.2(55)SE3 C3750E-UNIVERSALK9-M
2 0 WS-C3750-24TS 12.2(25)SEA C3750-I9K91-M
Can I upgrade the 3750's to be able to correct this? Which version does this require?
View 2 Replies
ADVERTISEMENT
Jun 13, 2012
Our customer has a stack of 6 3750G switches. They want to add another switch to the stack. I tried to quote another G, but I got a warning that the G series is EOS January 30,2013. Can I add a 3750X to the stack? I know that no matter what switch I get, I will have to upgrade the IOS in the stack, as the stack is running 12.2(25)SEE2.
View 2 Replies
View Related
Dec 6, 2011
I have two 3750s stacked and one 3750 standalone all in one data closet. The both have the same versions. I want to combine them to make one stack. How do I force the standalone to be the master? sw 1 priority XX(Higher then the existing stack)? Both the stack and the standalone have management addresses. Would it be ok to delete the stack ip address? That way, the standalone(master's address will be the only management address)?How should I connect the standalone 3750 to the stack? At present, the 3750 stack is connected via a cascade cable going from the stack 1 port of the top switch to the stack 2 port of the bottom switch.
View 19 Replies
View Related
May 29, 2012
I had 2 3750 stacked and one of them decided to die (power supply) cisco replaced it and now i want to re-add that switch to stack. I have already upgraded my replacement switch to the same IOS version.I was reading that i can do it without powering down operational 3750 so the action plan so far is:
-power down NEW member
-connect stacking cable
-power up
as you can see my switch 2 is now a master and it still holds config of all Gi ports for switch 1. If i connect my NEW switch without any config (vlan.dat and startup-config) will my existing switch 2 copy all ports config to new switch ?
View 4 Replies
View Related
Aug 2, 2012
I've a situation where I need to add a new 3750x to a existing stack of 3750. [code] When I tried to stack them together, I get a version mismatch error. Is this because of the difference in SW Image? What are my options next ? My ultimate goal is to make the new switch stack correctly with the exisitng switches.
View 11 Replies
View Related
Nov 20, 2011
if I read the Datasheet of Catalyst 3750X-Series-Switches it is possible to connect a new X-Switch to an existing and old Catalyst 3750-Series Stack.What kind of requirements are needed? Only same IOS-Version in the hole Stack and if possible same Feature-Set? .... like in a normal NOT mixed Stack?
View 4 Replies
View Related
Sep 12, 2012
We have a WS-C3750G-24PS switch running 12.2(50)SE , C3750-IPBASEK9-M in production & stand alone and we want to ask a new Cisco WS-C3750-24P running 12.2(55)SE3 , C3750-IPBASEK9-M into the stack with the 1st one.
Just want to know if it is possible and are there any problems with the IOS being different version.
View 8 Replies
View Related
Mar 25, 2012
in our network we were using three 3750-48-s switches with stacking one of the switch due to some hardware failure power problem,
now i want to add a new switch 3750-48-s in the existing Stack two switches , the old two switches ios version is = 12.2(25r)SEC the new Catalyst 3750 io verion is = 12.2(35)SE5
how to add this switch in the existing two stack switches , with documentation
View 1 Replies
View Related
Apr 2, 2012
The company I work for owns a remote manufacturing facility that houses a stack of five 3750 switches that function as the core switching system for the plant. DHCP services are configured on the 3750 stack.
There are currently three VLANs configured, one for data and one for voice (144 and 244 respectively) and one for UCM servers (200), with corresponding subnets of 10.44.32.0 /19, 10.44.0.0 /19 and 10.44.100.0 /24.
The current DHCP scope configurations are as follows:
ip dhcp pool Plant-44_DHCP
network 10.44.32.0 255.255.224.0
default-router 10.44.33.254
[Code].....
My question is will the addition of this scope in the manner presented cause any problems with PCs or IP phones outside the targeted recepents receiving the wrong IP information from this scope?
I plan to identify the users that should be members of this VLAN 444 and change the switchport mode access configuration on the corresponding switch ports from VLAN 144 to VLAN 444. The voice VLAN 244 will remain the same.
View 2 Replies
View Related
Nov 23, 2011
I am looking to add a new 3750 Switcch to an existing stack shown below
Switch Ports Model SW Version SW Image
------ ----- ----- ---------- ----------
* 1 26 WS-C3750-24P 12.2(35)SE5 C3750-IPBASE-M
2 26 WS-C3750-24P 12.2(35)SE5 C3750-IPBASE-M
3 26 WS-C3750-24P 12.2(35)SE5 C3750-IPBASE-M
[code]....
I have looked on notes to add a switch to an existing stack and haven’t identified answers on how the IOS will be affected on the new switch – will it downgrade to the current stack version or will the current stack upgrade to its version. At this moment in time I would prefer if the new switch IOS downgraded to the current stack IOS version.The new switch is a 3750V2 – will this affect how it joins the stack?The new switch has the image of IPBASEK9-M – again will this affect how it joins the stack?
View 5 Replies
View Related
Oct 16, 2012
I am attempting to add and Catalyst 3750 - 12 port Gigabit switch to an existing stack of 3750 48 port switches (non-X fabric). I am not sure how to proceed. These are the two questions/thoughts I have. Any additional perspective I should have before proceeding.
What kind of configuration should I apply to the Gig switch before adding it to the stack?I am sure I will need to assign priority to the new switch, ideally, it will act as master.
View 1 Replies
View Related
Oct 31, 2012
I have 3 switches in my 3750 X stack. I am getting the following error in the logs: %PLATFORM_STACKPOWER-4-PRIO_CONFLICT: Switch 1's power stack has conflicting power priorities. Not sure what I should do next. Below is my Stack-power configuration:
Power stack name: Powerstack-1 Stack mode: Power sharing Stack topology: Ring Switch 1: Power budget: 735 Low port priority value: 20 High port priority value: 10 Switch priority value: 2 Port 1 status: Connected Port 2 status: Connected Neighbor on port 1: c464.1308.7900 Neighbor on port 2: e8b7.4827.e680
Switch 3: Power budget: 729 Low port priority value: 22 High port priority value: 13 Switch priority value: 4 Port 1 status: Connected Port 2 status: Connected Neighbor on port 1: 2894.0fd9.9f00 Neighbor on port 2: 2894.0fd8.e200
Switch 2: Power budget: 690 Low port priority value: 21 High port priority value: 12 Switch priority value: 3 Port 1 status: Connected Port 2 status: Connected Neighbor on port 1: 2894.0fd8.e200 Neighbor on port 2: c464.1308.7900
Each switch has its own 715W power supply in it and all check out OK.
View 3 Replies
View Related
May 7, 2013
I'm trying to review a QoS setup, and I'd like to make sure I fully understand the current setup before I change anything. I'm seeing output drops on two different queue-thresholds, but not sure how packets are making it to one of the queues.
Switch Version
CORE#show ver
Cisco IOS Software, C3750E Software (C3750E-UNIVERSALK9-M), Version 15.0(2)SE, RELEASE SOFTWARE (fc1)
System image file is "flash:/c3750e-universalk9-mz.150-2.SE/c3750e-universalk9-mz.150-2.SE.bin"
cisco WS-C3750X-24 (PowerPC405) processor (revision A0) with 262144K bytes of memory.
Switch Ports Model SW Version(code)
I can find queue4-threshold3 in the mappings, but how are packets getting mapped to queue2-threshold1? The priority queue is disabled for this interface, so I'm not sure how this queue is dropping packets, according to the maps nothing is mapped to 02-01.
View 3 Replies
View Related
Mar 7, 2013
This 3750X stack (3 members) has some 100% cpu spikes. Is this bad enough to start tracking down the cause(s) or is this somewhat typical and not a reason for concern? I just took this reading. How can you detemine when the 100% and 80% spikes occurred?
2222233333333332222222222444442222222223333322222222222222
7777733333333338888888888000007777777770000077777888887777
100
[Code].....
View 3 Replies
View Related
Jan 31, 2012
I recently created a stack using (2) 3750x switches. I have three vlans on the stack (1,105,241) Vlan 105 is configured on 6509 core switches with multicasting and are connected to the stack via gigabit fiber. It is working well with clients on the Master or SW1, however clients on SW2 do not participate in multicasting Any client pc that is connected to SW2 vlan 105 does not show up in the "sh ip igmp snooping group" command. I can statically assign a client on SW2 to the mcast groups but but they fail to register on their own. I can take the cable connection from SW2 and plug it into an SW1 Vlan 105 port and it immediately becomes a member of the groups. I can then connect it back to the SW2 port and it disappears from the group membership. IGMP and PIM are configured with the defaults.
View 3 Replies
View Related
May 26, 2011
I have a 3750G and bought a new 3750X. It possible to stack these two together?
View 5 Replies
View Related
Dec 3, 2012
Seeing very high CPU on one of our 3750X stacks. Usally its around 30% but recently its 70, 80, 90 or maxed at 100% during the main day.IOS version c3750e-universalk9-mz.122-55.SE1.bin.Has a ten gig uplink connected to a nexus 7k and another ten gig connected to another 7k. Running Layer 3 and EIGRP on the 3750X.Is this normal for the CPU?
#sh processes cpu history
5555555554444455555555555555588888666669999888885555577777
8888000001111111111222227777755555666662222222229999977777
100
90 ***** ****
80 ***** ********* *****
[code]....
View 5 Replies
View Related
Dec 3, 2012
way to upgrade the IOS in my stack on 4 3750x switches
View 6 Replies
View Related
Dec 4, 2012
I have a stack of three 3750X-24P-S switches. Each switch has two PSU's.If I do a SH INVENT, switch 2 only lists Power Supply 0
If, however I do a SESS 2 onto the second switch in the stack and then do a SH INVENT, it shows both power supplies. Is it anything to be concerned about?
View 2 Replies
View Related
Oct 10, 2012
I'm trying to use LMS to upgrade a stack of switches that have 1 or more 3750x's and other 3750's. In Software Distribution, if I choose Distrube to devices, basic, it finds the x switch, which is the master but says the others are not candidates. I don't see a place where I can tell it it is a mixes stack and choose multiple IOS's.
View 2 Replies
View Related
Mar 12, 2012
I have two WS-C3750X-48PF-S in stack, but every one has just one power supply. In the package of the switches is included one stack power supply cable.does it make sense to use stack power cable if every switch has just one power supply ??
View 6 Replies
View Related
Jun 17, 2012
Switch 2 has an interface configured in RSU Standby.Switch 3 has an interface configured in RSU active. The upgrading sequence is : Switch 2, Switch 1, Switch3.The aim of the test is to prove that there is no loss of IP connectivity throught the RSU process.During the RSU process, there are ping between all the computers.
IOS starting version : 15.0-1.SE3
IOS upgrading version (with OVERWRITE) : 15.0-1.SE3 (same version)
1rst step : Switch 2 reboot and come back master but isolated from original stack (switch 1 and 3)
2nd step : Switch 1 reboot, and come back with switch 2 into the upgrading stack.
Issue : at this step :
- Switch 1 put its interface (IP 192.168.5.254) up :
- Switch 3 has not reboot and still has its interface (IP 192.168.5.254) up
=> we have some OSPF adjencies and mac flapping issues : switch 1 and 3 are trying to mount there OSPF adjencies on the same IP. We loss our IP connectivity since step 3 is not over.
3rd step : Switch 3 reboot and come back up in the upgrading stack. The IP connectivity is back, and the RSU process is done.Is that a normal behaviour ?How can we avoid to loose IP connectivity during RSU process ?
View 2 Replies
View Related
Jan 24, 2013
IOS upgrade tried on the stack of 2XWS-C3750X-24T-S , Upgrade was tried to support WCCP on the platform. Current version is Cisco IOS Software, C3750E Software (C3750E-UNIVERSALK9-M), Version 12.2(58)SE1, Not able find any IP Plus ios in the site ? Only available are IP base and Universal K9 , Tried upgrading to c3750e-universalk9-tar.122-58.SE2.tar by using stack upgrade method as per document [URL]
Upgrade fails with error :
%Error opening flash:update/info (No such file or directory)
ERROR: Image is not a valid IOS image archive.
Why current ios is not supporting WCCP , I hope it is there in the featureset. ( tried "sdm prefer routing" but no success) Does c3750e-universalk9-tar.122-58.SE2.tar will give me wccp support ? What is the issue with my upgrade and how do I do a successfull upgrade ?
View 3 Replies
View Related
Jun 19, 2012
We recently configured a stack of four 48 port 3750-x switches . We are noticing high CPU usage. "Hulc LED process" seems pretty high. This has coincided with VMware servers getting slow and non-responsive at times, perhaps a coincidence, not sure. Below I provided some outputs about how to diagnose it.
View 13 Replies
View Related
Apr 14, 2012
if we can stack the 3750G switch with a 3750X switch ?
View 7 Replies
View Related
Mar 8, 2012
I have a 3750X 24 port switch (with NM-1G network module) running IOS 15.0(1). Is there any benefit or reason to plug in the included Stack Wise cable and loop it back to itself in a single switch installation?
I don't see any recommendation in the documentation. The data sheet indicates a single switch is a non-blocking device so I'd think there's no bandwidth advantage like there is when connecting an actual multi-switch stack and needing to close the loop for the full 32 Gbps stack bandwidth.
View 2 Replies
View Related
Jul 15, 2012
I have a cisco WS-C3750G-24TS with IOS flash :/ c3750-mz.122-ipservicesk9-25.SEB4.bin "
I purchased a new Cisco WS-C3750X-24 with the IOS flash :/ c3750e-universalk9-mz.150-1.SE/c3750e-universalk9-mz.150-1.SE.bin. ( NEW )
When i configured a stack between the two 3750, the new switch restarted due the version mismatch (different IOS´s);
We have two versions:
WS-C3750G-24TS-ipservicesk9 flash :/ c3750-mz.122-25.SEB4.bin "
VS
WS-C3750X-24 flash :/ c3750e-universalk9-mz.150-1.SE/c3750e-universalk9-mz.150-1.SE.bin.
Is that possible to configure a stack between then?
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Tenho um cisco WS-C3750G-24TS com o IOS flash:/c3750-ipservicesk9-mz.1
22-25.SEB4.bin"
Adquiri um novo cisco WS-C3750X-24 com o IOS flash:/c3750e-universalk9-mz.150-1.SE/c3750e-universalk9-mz.150-1.SE.bin.
[code]...
View 4 Replies
View Related
Feb 7, 2012
I have two 3750X in a stack. Each 3750X has one 10Gb uplink to primary core1 and one 1Gb uplink to backup core2 configured in 2 etherchannel groups. The member switch has bad ports, so I need to replace it. I have spare 3750X unit. Is it possible to connect the spare unit to the stack and then move the RJ-45 cables from the member with bad ports to the new member? That way I can minimize servers downtime to just a few seconds..If that would work, then the last step would be to move the 10Gb networking module from old member to the new one, as well as the secondary PSU. Is it doable? Also according to the documentation, all I need to add new member is matching IOS version, correct?
View 1 Replies
View Related
Jan 10, 2013
I would just like to confirm whether dual stack hsrp is possible or not on 3750X both stack and non-stack.
The following is that I have to take care of this on the stack?
[Catalyst 3750 Software Configuration Guide, Release 12.2(55)SE]
[URL]
%FHRP group not consistent with already configured groups on the switch stack
View 4 Replies
View Related
Mar 23, 2012
I have a Catalyst 3750 I want to add to an existing stack (same models) through the stackwise port We use some complex QoS and other features on our network, and I'm not sure how much configuration I need to do on the new switch before adding it to the stack. Since this is going into an existing setup?
View 9 Replies
View Related
Oct 1, 2012
I need to add two additional 2960S switches to my stack. I saw a diagram that showed how a 4 switch stack can be connected, but I couldn't find much detail on adding a switch to an existing stack (besides master election). The output below shows how the existing stack is connected and its state
SW#sh switch detail
Switch/Stack Mac Address : 0011.2222.3333
H/W Current
[Code].....
I will need to break one of the stack rings between SW1 and SW2 in order to connect the new switches. Does it really matter which ring I break to connect the additional switches? Does one ring act as primary? If so, I'd rather not break that ring so this process is transparent as possible. Also, is there any benefit to disabling the stack port vs just disconnecting the cable?
View 2 Replies
View Related
Jan 29, 2013
I need to tear down an existing port-channel on a 3750X running c3750e-universalk9-mz.150-1.SE3.bin. This port channel is currently down down. It has three ports in it that will be added one each to three existing port-channels, I am assuming as long as the "channel-group" command is exactly the same as it is on the three existing port-channels I should be ok just adding the new port. One point to note is that the three existing port-channels all have three ports so this will be adding the fourth port to each port-channel. I know after reading that it is a best practice for load balancing to use either 2, 4, or 8 ports for a port-channel. Also what is the command to see all ports that are in a port channel?
View 1 Replies
View Related
Nov 20, 2011
I have two 3750G switches stacked together however it's not in a full ring configuration:
Stack Ring Speed : 16G
Stack Ring Configuration: Half
Stack Ring Protocol : StackWise
And as shown below it's obvious which cable is not working:
show switch neighbors
Switch # Port 1 Port 2
-------- ------ ------
1 2 None
2 None 1
It's not flapping - it's like the cable isn't there at all. I'm going to try reseating the cable in there and perhaps an all out replacement if necessary. My question - is there any threat of a reboot of the switch stack or of partitioning of the switch stack by trying to get the 2nd cable working?