Cisco Switching/Routing :: Catalyst 2960 / Add New Stack To Existing Two Stacks
Mar 7, 2013
On first floor, I have two stack switches and each stack has got 4 switches. they all are working fine.Now the client would like to add one more stack on the 2nd floor. But the second floor switches are different when compared to the 1st floor switches.
can you have differnt IOS among different stacks. I knew in a stack we need all the switches should have same IOS version. But in between two stacks to communicate do we need same IOS or they can be on differnet IOS?
1st floor switches have 15.0 version and 2nd floor new switches has 12.2.58. Is this ok ?
1st floor switches are 3500 series ( Note: only one one Vlan 20 we are using on the both stack switches and we would like add same Vlan 20 on to the new stack)
2nd floor switches aew 2 catalyst 2960 switches.
Note: on the second floor switches one is 24 port switch and the other one is 48 port switch. so can i make them as a stack?
We have already done cabling from 1st floor to second floor. So no problem with that at all.
View 9 Replies
ADVERTISEMENT
Dec 1, 2012
How would I go about stacking 4 Cisco Catalyst 2960-48PST-L switches? The one switch needs to accept a fiber connection from a distribution switch. Do I have to buy flexstack module and cables? If so where does the module go on the switch? If this switch cannot do this set up, any other switch I should look at.
View 6 Replies
View Related
Apr 23, 2007
Any one who knows where I can find a documentation where it says the maximum switches per stack for the Catalyst 2960 family?
View 2 Replies
View Related
Apr 25, 2013
I have two Cisco 48 port Catalyst 2960-S series SI. Instead of buying the pricy stack modules can I only use the SFP+cable to connect them as stack? which type of SFP+cable should I buy? do I need any license to use those SFP ports?
View 9 Replies
View Related
Feb 7, 2012
I have an existing stack of 4 x 2960-S switches connected by stack cables.I would like to add another 2960-S switch to the stack but am unable to as the 2960-S will only allow 4 x 2960-S switches per stack.how I would add the 5th 2960-S switch to the existing stack of 4 x 2960-S switches.
View 12 Replies
View Related
Aug 2, 2012
I've a situation where I need to add a new 3750x to a existing stack of 3750. [code] When I tried to stack them together, I get a version mismatch error. Is this because of the difference in SW Image? What are my options next ? My ultimate goal is to make the new switch stack correctly with the exisitng switches.
View 11 Replies
View Related
Oct 1, 2012
I need to add two additional 2960S switches to my stack. I saw a diagram that showed how a 4 switch stack can be connected, but I couldn't find much detail on adding a switch to an existing stack (besides master election). The output below shows how the existing stack is connected and its state
SW#sh switch detail
Switch/Stack Mac Address : 0011.2222.3333
H/W Current
[Code].....
I will need to break one of the stack rings between SW1 and SW2 in order to connect the new switches. Does it really matter which ring I break to connect the additional switches? Does one ring act as primary? If so, I'd rather not break that ring so this process is transparent as possible. Also, is there any benefit to disabling the stack port vs just disconnecting the cable?
View 2 Replies
View Related
Sep 22, 2012
I have 3 3750 staking switch with the following configuration:
H/W Current
Switch# Role Mac Address Priority Version State
----------------------------------------------------------
1 Member 442b.0350.9400 1 1 Ready
2 Member 442b.0357.8780 2 1 Ready
3 Master 442b.036f.a800 3 1 Ready
The new switch is installed to be wired to the master switch. the swtich 3 (* 3 Master Ready 442b.036f.a800)my question is: if you disconnect the wiring from the master stack to connect to the new switch, it is possible that the new switch change the current configuration of stacking.
-Can I just add the new switch with clean configuration without changing the current configuration ?
-How is assigned the stack number? i need the new switch be with the GI4 / x?. I can I manually by assigning ports?
-If I want to the new 3750 member witch lower prioridad, can I change priority before adding to stack?
View 2 Replies
View Related
Mar 25, 2012
in our network we were using three 3750-48-s switches with stacking one of the switch due to some hardware failure power problem,
now i want to add a new switch 3750-48-s in the existing Stack two switches , the old two switches ios version is = 12.2(25r)SEC the new Catalyst 3750 io verion is = 12.2(35)SE5
how to add this switch in the existing two stack switches , with documentation
View 1 Replies
View Related
Nov 23, 2011
I am looking to add a new 3750 Switcch to an existing stack shown below
Switch Ports Model SW Version SW Image
------ ----- ----- ---------- ----------
* 1 26 WS-C3750-24P 12.2(35)SE5 C3750-IPBASE-M
2 26 WS-C3750-24P 12.2(35)SE5 C3750-IPBASE-M
3 26 WS-C3750-24P 12.2(35)SE5 C3750-IPBASE-M
[code]....
I have looked on notes to add a switch to an existing stack and haven’t identified answers on how the IOS will be affected on the new switch – will it downgrade to the current stack version or will the current stack upgrade to its version. At this moment in time I would prefer if the new switch IOS downgraded to the current stack IOS version.The new switch is a 3750V2 – will this affect how it joins the stack?The new switch has the image of IPBASEK9-M – again will this affect how it joins the stack?
View 5 Replies
View Related
Feb 27, 2013
I have to add a 2960s PoE switch to an existing stack of two 2960s PoE switches. If The new switch has no configuration on it and the existing stack is broken by pulling te stack cables and then new cables are added and everything re-cabled correctly will the new switch assume the configuration from the stack without any issues?
View 10 Replies
View Related
Dec 6, 2012
I am having an issue with adding a c3750x switch to an existing switch stack Currently there is 2 x WS-C3750X-48P and I am trying to add another WS-C3750X-48P to this switch I have cabled the switch to the stack using the stack cables and added the command to provision the switch on the exisitng stack. However when I turn the switch on it just goes on its own stack.
I noticed the new switch had a later version of IOS so have downgraded this to the same version as the other switches but still no joy Here is the sh ver from the exisitng stack
uptime is 4 weeks, 4 days, 23 hours, 30 minutes
System image file is "flash:/c3750e-universalk9-mz.122-53.SE2/c3750e-universalk9-mz.122-53.SE2.bin"
License Level: ipbaseLicense Type: PermanentNext reload license Level: ipbase
cisco WS-C3750X-48P (PowerPC405) processor (revision A0) with 262144K bytes of memory.Processor board ID FDO1448Z0FJLast reset from power-on21 Virtual Ethernet interfaces1 FastEthernet interface156 Gigabit Ethernet interfaces6 Ten Gigabit Ethernet interfacesThe password-recovery mechanism is enabled.
[code]....
View 3 Replies
View Related
Oct 16, 2012
I am attempting to add and Catalyst 3750 - 12 port Gigabit switch to an existing stack of 3750 48 port switches (non-X fabric). I am not sure how to proceed. These are the two questions/thoughts I have. Any additional perspective I should have before proceeding.
What kind of configuration should I apply to the Gig switch before adding it to the stack?I am sure I will need to assign priority to the new switch, ideally, it will act as master.
View 1 Replies
View Related
Feb 12, 2013
Q. Does the Supervisor 720 support all existing Cisco Catalyst 6500 series interface and services module, protecting customer investments?
View 1 Replies
View Related
May 20, 2013
This is probably a dumb question, but I have read the 2960 stack administration guide and it does not explain how to configure the stack IP address. It says several times that the stack can be managed from the stack IP address, and that the stack IP address is a system-level configuration item. But it never explains how to configure the stack IP address.
View 3 Replies
View Related
May 29, 2011
We have a 2960 stack of 4 WS-C2960S-24PS-L switches.Sometimes, at random, the stack crashes and reboots. I have downloaded the crashinfo file and can see the following error.
View 7 Replies
View Related
Nov 20, 2011
if I read the Datasheet of Catalyst 3750X-Series-Switches it is possible to connect a new X-Switch to an existing and old Catalyst 3750-Series Stack.What kind of requirements are needed? Only same IOS-Version in the hole Stack and if possible same Feature-Set? .... like in a normal NOT mixed Stack?
View 4 Replies
View Related
Dec 1, 2010
I have a new problem with Catalyst 2960S. We have four switch in a stack and now I get the message:
“%PLATFORM_RPC-3-MSG_THROTTLED: RPC Msg Dropped by throttle mechanism: type 37, class 14, max_msg 32, total throttled 73968 (hostname1-2)”
Traceback= 13A686C 160862C 160E0B4 15E2088 184FD48 18467B8
sh switch de
Switch/Stack Mac Address : 68bd.abc9.0000
H/W Current
[Code]....
View 36 Replies
View Related
Sep 10, 2012
I have stack of 2960 S switches.I can console only from Master not from memember switches is this default behaviour?
View 1 Replies
View Related
Mar 25, 2013
We have a pair of WS-C3750X-24T-S in a stack and four WS-C2960S-48TS-L in a stack of their own. There is not really anything too fancy configured (no special VLAN configuration/trunks or etc.) but the 3750 do have two ports configured as L3 for routing. We are not trying to use those ports for EtherChannel. These devices are running IOS 12.2(55)SE3 Essentially we are attempting to make an EtherChannel group using port 48 on all four of the 2960's in their stack (four ports). On the 3750 we will configure an EtherChannel group using port 23 and 24 on both switches (four ports). We then connect them up to form a four member EtherChannel.The ports on both ends are configured as mode ON and they are all 1Gb ports. I elected mode on because I understand at least one of the EtherChannel protocols will not work cross stack. What I would like to ask is whether the above configuration is possible or are we hitting some sort of limitation of EtherChannel cross stack, etc..? I cannot find anything to suggest this configration is invalid, but thought I would ask to see if I missed something in the EtherChannel articles.
View 3 Replies
View Related
Oct 8, 2012
I have Cisco Catalyst Stack structure that consist of;
3750E-48TD-S (MASTER) (UNIVERSAL Image)
3750G-48TS-S (IPBASE Image)
3750G-48TS-S (IPBASE Image)
3750G-48TS-S (IPBASE Image)
I want to upgrade their IOSs to k9 images.
I can not dowload Universal Image file from Cisco website because of the expired service contract. I have IPBASE IOS files for all switches,
Can it be a problem to upgrade master switch IOS from Universal to IPBASE image?
View 1 Replies
View Related
Apr 1, 2013
I want to run rolling-stack upgrades on several stacks containing Catalyst 3750X-switches. I have done as follows: Configured the redundant uplinks as active and stand-by.Started to upgrade by using archive download-sw /rolling-stack-upgrade /overwrite /reload The upgrade starts as expected BUT switch number 2 in the stack is reloaded BEFORE switch 1 is finnished, the result is of course downtime for the stack. The documentation says something about the command "boot time", but what is this command doing? The default seems to be 7 minutes, it this parameter the time the upgrade-process waits before booting the next switch in the stack? I would expect that switch number 2 is reloaded when switch 1 is up again after reload, and not after an absolute number of minutes, is the rolling-stack-upgrade not working this way ?
View 4 Replies
View Related
Jan 1, 2012
I have 8 switch stack consisting of six WS-C3550-48P and two WS-C3750G-16TD running software vesrion 12.2(25) SEB1. When I added new C3750v2-24PS (running image 12.2(50) SE5) in stack so I up-graded the image of existing 8 switches with latest veriosn 12.2(50) SE5. Once I have done with the upgrade then all ports of my stack switches went down after around five minuts. Is it image compatibility issue with existing switches or something else?
View 7 Replies
View Related
Nov 21, 2012
I know the Catalyst 3030 is EOL/EOS and I am probably SOL.
Cisco IOS Software, CBS30X0 Software (CBS30X0-LANBASE-M), Version 12.2(25)SEE2, RELEASE SOFTWARE (fc1)
Copyright (c) 1986-2006 by Cisco Systems, Inc.
Compiled Fri 28-Jul-06 11:05 by yenanh
Image text-base: 0x00003000, data-base: 0x00AB4EB8
[code]....
I would like to put the below into the "stack trace" tool, but all links appear to be dead.
%PLATFORM-1-CRASHED: Program Exception (0x0700)!
%PLATFORM-1-CRASHED: SRR0 = 0xFEA10EC0 SRR1 = 0x00029210 SRR2 = 0x0043CD70 SRR3 = 0x00021200
%PLATFORM-1-CRASHED: ESR = 0x08000000 DEAR = 0x00000000 TSR = 0x8C000000 DBSR = 0x00000000
%PLATFORM-1-CRASHED:
[code]....
View 3 Replies
View Related
Jan 6, 2012
below is the current config of link that is already up. I need to add another fiber redundant link between 6509 and 2960 stack. How to work on config Spanning side by not taking 6509 down after the change. 6509 is in distribution.
---------------X-ALPHA-IDF-1FORMS-2960S-0# (SIDE)
!interface GigabitEthernet1/0/52description X-ALPHA-F-6509-0 uplinkswitchport trunk native vlan 18switchport mode trunksrr-queue bandwidth share 1 50 30 19priority-queue out mls qos trust dscpmacro description cisco-routerauto qos trust spanning-tree portfast disablespanning-tree guard loopip dhcp snooping trust!
-----------------X-ALPHA-F-6509-0# (SIDE)
!interface GigabitEthernet3/10description 1st floor POC2 Forms IDFswitchportswitchport trunk encapsulation dot1qswitchport trunk native vlan 18switchport mode trunkno ip addressmls qos trust dscpspanning-tree guard loop!
View 1 Replies
View Related
May 14, 2008
The Catalyst 3750 switch reboots, and the " Reloading because of stack merge or communication failure" error message appears.
I saw this issue at "Cisco wiki" but the resolution in that page is just "Open a case with TAC". Because of the reasion is H/W Problem.
Is The resolution only one ? anything else? The 3750 does not use Stack.It is just stand alone. So i think it has other resolution as "disabling Stack" or another one. How about my opinion ? Is the Resolution only "Open a Case with TAC"
View 4 Replies
View Related
Jun 13, 2012
I'm having trouble setting up SSH on my new Switch.
no aaa new-model
aaa authentication login default local
ip domain-name king.local
[Code].....
I would like to be able to use Vlan 10 192.168.155.1 for SSH remote management.
View 11 Replies
View Related
Mar 18, 2013
I have Catalyst 2960 S (WS-C2960S-48FPS-L) Switch. I have plugged in SFP module but still interface is down and line protocol down. Is there any configuration to enable SFP module and make the interface up?
This port is connected to nexus 5 k.
View 11 Replies
View Related
Aug 20, 2012
i try to implement layer 2 qos in 2960. when i complete to configure the switch, i want to test the qos.PC1 conect to switch port 1,PC2 conect to switch port 2 . PC1 is source teminal. i use skydata.exe and FTP for the test.
when use the skydata ,the PC2 speed can reach 10mbps.when use the FTP , the PC2 only can reach 1.2mbps. why?
View 3 Replies
View Related
Apr 29, 2012
I can use Putty to SSH into my new switch (Directly connected to my laptop with ethernet cable), but I cant log into my switch.
Sent username "admin"
admin@192.168.251.1's password:
Access denied
It doesnt like my password, but I have only set 1 password (king) on this switch. I've configured 3 other switches with SSH and had no problem. Been trouble shooting for awhile and It'd be great if I could have a 2nd set of eyes take a peek, Also, my running config is attached.
View 5 Replies
View Related
Sep 20, 2012
Will catalyst2960 supports SSH, and how to configures with CLI.
View 2 Replies
View Related
Apr 9, 2012
I need to upgrade a Catalyst IOS, but I got a bit confused. The catalyst is currently running "c2960-lanbase-mz.122-35.SE5.bin", but I want to upgrade to "c2960-lanbasek9-mz.122-35.SE5.bin", in order to enable ssh. [code] What are the appropriate steps in order to upgrade to "c2960-lanbasek9-mz. 122- 35. SE5.bin". I have downloaded the tar file (c2960-lanbasek9-tar.122-35.SE5.tar)
1) Do I have to delete the old directory (drwx 192 Mar 1 1993 02:07:21 +02:00 c2960-lanbase-mz.122-35.SE5)?
2) Are these the correct steps to download and extract the IOS?
3) Where will the tar files be extracted? Will an new directory be made or do I have to make one manually?
View 3 Replies
View Related
Dec 15, 2012
I have packet loss with QoS configured and I was wondering is it somehow connected with the QoS configured on the switch.The traffic is passing through fa0/19 and gi0/1 interfaces.
mls qos map cos-dscp 0 8 16 24 32 46 48 56
mls qos srr-queue input bandwidth 90 10
mls qos srr-queue input threshold 1 8 16
mls qos srr-queue input threshold 2 34 66
[code]...
View 2 Replies
View Related