Cisco Switching/Routing :: Catalyst 2960S Stack Required

Dec 1, 2010

I have a new problem with Catalyst 2960S. We have four switch in a stack and now I get the message:
 
“%PLATFORM_RPC-3-MSG_THROTTLED: RPC Msg Dropped by throttle mechanism: type 37, class 14, max_msg 32, total throttled 73968 (hostname1-2)”
 
Traceback= 13A686C 160862C 160E0B4 15E2088 184FD48 18467B8
 
sh switch de
Switch/Stack Mac Address : 68bd.abc9.0000
H/W   Current
[Code]....

View 36 Replies


ADVERTISEMENT

Cisco Switching/Routing :: Stack 4900M With 2960S?

Mar 11, 2013

I would like if is possible to stack a Cisco 4900M with a 2960S. I know it is not the most common situation but i need it.

View 1 Replies View Related

Cisco Switching/Routing :: 2960s / Add One More Switch In Stack?

Apr 29, 2013

I have a running setup having 2 Cisco 2960s 24 TS switch with Stack configuration. Now I want to add one more same Cisco switch. My questions are:-
 
1) How can I do this...(Should follow the same process as I did before.

2) Could I do this without impacting the service. i.e. without rebooting the switch.

3) What should be the connection archiecture as of now since there is two switch so it is connected 1 -1 and 2-2. but for 3 switch should we require to change the connectivity.

View 1 Replies View Related

Cisco Switching/Routing :: Stack 4900M With 2960S?

Mar 11, 2013

I would like to know if i can and how stack a Cisco 4900M with a 2960S. I know it's not the most common but i need it.

View 2 Replies View Related

Cisco Switching/Routing :: Stack 2960s Not Full

May 7, 2013

I have 4 switchs 2960s in stack, but this not full ring. [code]the interface stack 1 for switch 1 is down and interface stack 2 for switch 4 is down.I do  insert this command "switch 1 stack port 1 enabled" but interface are not up.

View 4 Replies View Related

Cisco Switching/Routing :: SC/LC Cable Between 2960S Stack And 4948

Aug 9, 2012

I'm connecting the two devices above and I need an LC to SC fiber cable. It should be pretty simple but I've seen two different types of LC/SC cables - one is 8.3/125 and one is 62.5/125. I believe the 62.5 is an older cable type but when looking at the detail sheets for each of the SFPs I see that both of these support a 62.5 or 50 micron core size.

View 2 Replies View Related

Cisco Switching/Routing :: 2960s Switch Stack IOS Upgrade?

Apr 18, 2012

I was just curious about something with upgrading a 2960s stack.
 
To copy the image to the switches in the stack I use: Switch# archive download-sw tftp://x.x.x.x/filename
 
Does this also set the image as the boot image or do I still need to issue the boot system flash command?
 
can I just issue this command on the master switch and reload and the new config will be pushed to the rest of the switches?

View 5 Replies View Related

Cisco Switching/Routing :: Adding Two 2960S To Existing Stack

Oct 1, 2012

I need to add two additional 2960S switches to my stack. I saw a diagram that showed how a 4 switch stack can be connected, but I couldn't find much detail on adding a switch to an existing stack (besides master election). The output below shows how the existing stack is connected and its state
 
SW#sh switch detail
Switch/Stack Mac Address : 0011.2222.3333
H/W   Current

[Code]..... 
 
I will need to break one of the stack rings between SW1 and SW2 in order to connect the new switches. Does it really matter which ring I break to connect the additional switches? Does one ring act as primary? If so, I'd rather not break that ring so this process is transparent as possible. Also, is there any benefit to disabling the stack port vs just disconnecting the cable?

View 2 Replies View Related

Cisco Switching/Routing :: Create Stack With 2960S Already Configured

Mar 5, 2013

I have an 2960S all configured, with vlans, ports configurations and others.Now, I bought other 2960S and two stack modules to create a stack with these 2 switches.We call:

-Switch1 (I have configured and in production)
-Switch2 (New switch, no configured)
 
Can I connect these two switches in stack without lost the configuration of my Switch1 and no turn-off this switch? Does not stop the users access?

View 1 Replies View Related

Cisco Switching/Routing :: 2960s Stack Port Shutdown

May 6, 2013

I have a single 2960s without stack module. The stack port has a status of down, however I'd like to disable it so that it does not generate a false alarm in my NMS. The documentation states that there should be a command "switch 1 stack port 1 disable" but the switch (running 15.0(2)SE2) doesn't seem to  be available. Is this a dcumentation bug or is the command not there at all?

View 2 Replies View Related

Cisco Switching/Routing :: Failure On 2960s Stack IOS Upgrade

Nov 5, 2011

applied an iOS update to a stack via tftp.  I used the archive Download-sw tftp:// method.  I rebooted the stack after complete and it never came back up. I discovered the master switch upgraded but not the member.  The member was sitting there with all amber lights on and frozen after the iOS load.  The master wouldn't finish boot until I removed the member from the stack.  I had a version mismatch and they would not communicate.

View 2 Replies View Related

Cisco Switching/Routing :: To Use Flexstack To Stack Two 2960S 48 Port Switches

Oct 11, 2012

I would like to use flexstack to stack two Cisco 2960S 48 Port switches (2960S-48TD-L) for redundancy. Each switch will have a single 10G uplink into our Nexus 7K. One switch in the stack will terminate to linecard 6 (N7K-F248XP-25) and the other switch will terminate to linecard 7 (N7K-F248XP-25). My question is how many flexstack cables are needed? Do I need only one cable or do I need two to connect the two 2960s ?

View 2 Replies View Related

Cisco Switching/Routing :: 2960S How To Upgrade Stack / Then Reboot Members One By One

May 15, 2013

I have 2 Catalyst 2960S-switches configured in a stack. The uplink is configured as a cross-stack etherchannel. Now I want to upgrade the stack with a minimum of downtime for the connected hosts. The hosts are connected to the stack via cross-stack etherchannels. So my question is: How can I upgrade the stack and reboot the members with a minimum of downtime? If I use the archive download-sw command with the /reload-option, the stack is reloaded and the result will be downtime for the hosts while th stack is reloading. Is it possible to upgrade the stack and then reboot the members one by one in a controlled manner?

View 8 Replies View Related

Cisco Switching/Routing :: Adding 2960s To Existing Stack Of Two POE Switches

Feb 27, 2013

I have to add a 2960s PoE switch to an existing stack of two 2960s PoE switches. If The new switch has no configuration on it and the existing stack is broken by pulling te stack cables and then new cables are added and everything re-cabled correctly will the new switch assume the configuration from the stack without any issues?

View 10 Replies View Related

Cisco Switching/Routing :: 2960S Replace Master Switch In Stack

Jun 4, 2012

I have a stack of 2960S (c2960s-universalk9-mz.122-55.SE2.bin) and the master has failed (used to have a priority of 14). The second switch has become master (priority 1) as can be seen below: [code]

If I connect a new blank 2960S (same IOS) through the stack ports, will the master sync its config to the new one without causing problems?As I understand the new blank switch will also have a priority of 1 and will by default be numbered as 1. So if the config is correctly synced and I later on want to make switch 1 the master, I need to set the priority: [code]

View 4 Replies View Related

Cisco Switching/Routing :: Creating Stack Of 2960s From Single Live Switch

Sep 23, 2012

I have a live 28port Catalyst 2960S switch. By live I mean that there is an essential piece of equipment plugged into this switch that can suffer little to no downtime. Over the course of time the number of devices patched into this location has increased to exceed the 24 ports available and we have had to resort to adding unmanaged switches to fill the need. We have acquired an additional 2960 & stacking modules that I would like to stack together, keeping the existing switch as the master. It is my understanding that the stacking modules are hot-swappable and that this member switch can be added without bringing the master switch down, thus creating zero down time for the financial server that is connected.
 
The steps I believe that need to be followed are as such: write mem to existing switch and backup to our TFTP serverinstall the stack module in the existing (while powered up) and new (while powered down)place the 2 redundant FlexStack link cables on both switchesthen simply power the member switch on After boot the member switch will get it's OS and configuration from the master and I can begin moving CAT5 cables from the unmanaged switches to the stack.

View 2 Replies View Related

Cisco Switching/Routing :: Catalyst 2960S IOS 15.0.2 IPv6 Don't Work

Aug 8, 2012

Just I have upgraded some 2960S to IOS 15.0(2)SE from a IOS 15.0(1)SE3 and the catalyst don't switch any IPv6 traffic. Don't work any RA and also don't work any unicast IPv6 traffic from any interface. I can see some references to IPv6 changes in the FHS (First Hop Security) in the Release Notes, but no any reference to changes in the configuration.
 
The switches don't have any IPv6 specific configuration and the sdm is the default templata. Returning to 15.0(1)SE3 everything work ok.
 
On Catalyst 2960, and 3560E this IOS version seem to work fine with IPv6.

View 1 Replies View Related

Cisco Switching/Routing :: Upgrade Catalyst 2960S And 3560x

Jun 20, 2012

i want upgrade my catalyst 2960S and 3560x at midnight, but i am worried about config loss.  If i upgrade my switch throught web interface, will need I reconfigure the switch?

View 2 Replies View Related

Cisco Switching/Routing :: Catalyst 2960S For IPTV Backbone

Nov 26, 2011

we have Catalysts 2960S for switching in our Wireless high capacity backbone network. As agregation switch we are using 3560x.
 
I just need to know, if are these 2960S good solution for igmp snooping for whole IPTV stream. It put only a range from backbone and put out on another port. But just specified multicast addresses.
 
Imput will be 239.128.0.10 to 239.128.0.20 on Gi 0/1,Output wil be 239.128.0.10 - 15 on Gi 0/24
 
IPTV will be separated on different VLAN for eg VLAN 20,Is needed any priorization configured od switches?,The capacity for IPTV is around 500 mbps

View 4 Replies View Related

Cisco Switching/Routing :: Catalyst 2960S Format Flash Failure?

Jan 3, 2013

I recently tried to manually format the flash on a model WS-2960S-48TS-L switch running IOS version 15.0(2)SE.  While executing the operation I got the following error - mifs[8]: Failed to create superblock  %Error formatting flash (I/O error).As a result the flash is no longer accessible by the switch.  I spoke with Cisco and they indicated that a switch reload would remount the flash and make it accessable again but the .bin file would need to be reloaded using the xModem recovery procedure (what a pain).The next IOS version 15.0(2)SE1 will supposedly fix this bug but it has not been released yet.  In the meantime if you are running 15.0(2)SE you may want to hold off performing a "format flash:" function on a 2960S.

View 3 Replies View Related

Cisco Switching/Routing :: Catalyst 2960S - Protected Port But Allow Specific MAC?

Nov 5, 2011

We are using catalyst 2960S Lan Base IOS on Radio towers. We just bought 50 Accest points, thas are GPS synchronized. Problem is the APs need to be connected on L2-mac betwen each other. But at this time we are using port isolation on each switch (tower) by protected port function to isolate clients from each other.
 
My question is, is possible to specifi a Mac addresses in specific vlan thats can comunicate betwen protected ports? On tower is one Master unit and others are slave. I thing there is only 1 dirrection comunication - from master to slave.

View 2 Replies View Related

Cisco Switching/Routing :: Catalyst 2960S / Downgrade 10GB Twinax CU SFP Cable To 1GB?

Oct 30, 2012

specifying Cisco devices and I've made an error.I have 2 Catalyst 2960S switches (C2960S-24PS-L).Based on this snippet of web copy from the Cisco website:What's new for the Cisco Catalyst 2960-S Series Switches with LAN Base Software: # 10 and 1 Gigabit Ethernet uplink flexibility with Small Form-Factor Pluggable Plus (SFP+), providing business continuity and fast transition to 10 Gigabit Ethernet I bought a cable assembly "SFP-H10GB-CU3M" (3 meter copper twinax cable with 10GB SFPs on each end).  Unfortunately, it appears after more careful reasearch that my specific model 2960S's are not directly compatible.  , can I force these 10GB SFPs down to 1GB and get them to work with my switches or do I need to return and repurchase?

View 1 Replies View Related

Cisco Switching/Routing :: Catalyst 2960S Port-Based Address Allocation?

Sep 27, 2012

I just bought a Catalyst 2960S to test out the feature "Port-Based Address Allocation" which is required for our factory. I followed the instruction from Cisco IOS and did all the steps but I could not get it to work, my network client did not received the expected IP address that I configured.

View 8 Replies View Related

Cisco Switching/Routing :: Catalyst 2960S / Multicast Not Working Between Two Data-centers?

Jan 28, 2012

Multicast is not working between our two datacenter, we have catalyst 2960S (two stacked) as the internal lan switch, and catalyst 3560E as the external switch, same configuration for both datacenters.The two sites are connected using metro, the external switch (3560) is doing qinq and encapsulate the data from the internal switch with the metro vlan (611).
 
IGMP snooping is disabled for all switches, although we prefer to enable it for the internal switches.For each datacenter there is a different firewall which also act as the router, we are using fortigate as the firewall.Following is the important configuration section:
 
Port 43 in the internal switch is connected to the external switch (both sites):
 
interface GigabitEthernet1/0/43 
switchport mode trunk
 load-interval 30 
 
Port 3 in the external switch connected to the internal switch (both sites):
 
interface GigabitEthernet0/3 
switchport access vlan 611
 switchport mode dot1q-tunnel 
no cdp enable
 no cdp tlv server-location
 no cdp tlv app
 
 Port 8 on the external switch connected to the metro link (both sites) vlan 350 is the internet and 611 is the metro:
 
interface GigabitEthernet0/8
 switchport trunk encapsulation dot1q
 switchport trunk allowed vlan 350,611
 switchport mode trunk  

vlan 611 on external switch:
 
interface Vlan611 
ip address 192.168.168.2 255.255.255.0
 no ip route-cache 
no ip mroute-cache

View 6 Replies View Related

Cisco Switching/Routing :: Catalyst 2960S - Dynamically Assign IP Address To Computers Via DHCP

Aug 30, 2012

I am administering a Catalyst 2960S switch and I would like to connect several computers to it.  Some of those each have a static IP address.  For a few of them, I would like the switch to dynamically assign an IP address to them via DHCP.  Is the switch capable of doing this?  If so, how can I do it? I tried looking through Cisco Network Assistant and I couldn't find it.  Some web pages have suggested I telnet into the switch and issue commands like "ip dhcp ?" to see what commands are possible.  I can telnet in and if I type  but I get an "Unrecognized command" for both "ip ?" and "ip dhcp ?".  This makes me think I'm reading the wrong web pages. I did come across the term "DHCP snooping".  It seems relevant, but very difficult for me to grasp. 

View 9 Replies View Related

Cisco Switching/Routing :: Memory Leak On Catalyst 2960 And 2960S - Similar To Bug CSCts52797

May 6, 2013

after upgrading about 35 Catalyst 2960 and Catalyst 2960S to IOS 15.0(2)SE2, we experience a memory leak on several switches. After some days / weeks the switches are not accessible via Console/Telnet/SSH/Web any more. Only SNMP seems to work properly.Attached users do not experience any decrease in service.
 
Trying to connect to the console, we get following error message:

"% Low on memory; try again later"
 
The only (temporary) solution is to reboot the switch. The behavior is similar to Bug CSCts52797.With regards to the Bug notes this bug should only affect Catalyst 2960 with 64MB of RAM and should already be solved with IOS 15.0(2)SE2.
 
We experience the erroneous behavior with

-WS-C2960-48TC-S      running IOS 15.0(2)SE2
-WS-C2960S-48LPS-L  running IOS 15.0(2)SE2

View 7 Replies View Related

Cisco Switching/Routing :: Catalyst 6509E Upgrade IOS Required Memory Size

Oct 21, 2012

I have Catalyst 6509 E with redudant SUP720-3B (and MSFC3) running 12.2(18)SXF6 IP Services Lan Only IOS (this IOS requires 512MB DRAM and 64MB of flash) SUP has 512MB DRAM (458720K/65536K) and 512MB sup-bootdisk:, but, there is65536K bytes of Flash internal SIMM (Sector size 512K).
 
My question is can I put 12.2(33)SXJ3 IP Services Lan Only IOS to this 6500 because this IOS requires 512MB DRAM and 512MB od flash?This is "sh ver" and "dir all-filesystems" of my 6500:
 
cat6500#sh verCisco Internetwork Operating System Software IOS (tm) s72033_rp Software (s72033_rp-IPSERVICESK9-M), Version 12.2(18)SXF6, RELEASE SOFTWARE (fc1)Technical Support: [URL] Copyright (c) 1986-2006 by cisco Systems, Inc.Compiled Mon 18-Sep-06 23:59 by tinhuangImage text-base: 0x40101040, data-base: 0x42D90000
ROM: System Bo

View 6 Replies View Related

Cisco Switching/Routing :: How To Stack Catalyst 2960

Dec 1, 2012

How would I go about stacking 4 Cisco Catalyst 2960-48PST-L switches? The one switch needs to accept a fiber connection from a distribution switch.  Do I have to buy flexstack module and cables? If so where does the module go on the switch? If this switch cannot do this set up, any other switch I should look at. 

View 6 Replies View Related

Cisco Switching/Routing :: Catalyst 3750 And 3750X Together In One Stack?

Nov 20, 2011

if I read the Datasheet of Catalyst 3750X-Series-Switches it is possible to connect a new X-Switch to an existing and old Catalyst 3750-Series Stack.What kind of requirements are needed? Only same IOS-Version in the hole Stack and if possible same Feature-Set? .... like in a normal NOT mixed Stack?

View 4 Replies View Related

Cisco Switching/Routing :: Catalyst 3750 Series Stack IOS Upgrade?

Oct 8, 2012

I have Cisco Catalyst Stack structure that  consist of;
 
3750E-48TD-S (MASTER) (UNIVERSAL Image)
3750G-48TS-S (IPBASE Image)
3750G-48TS-S (IPBASE Image)
3750G-48TS-S (IPBASE Image)
             
I want to upgrade their IOSs to k9 images.
 
I can not dowload Universal Image file from Cisco website because of the expired service contract.  I have IPBASE IOS files for all switches,
 
Can it be a problem to upgrade master switch IOS from Universal to IPBASE image?

View 1 Replies View Related

Cisco Switching/Routing :: Rolling Stack Upgrade Of Catalyst 3750

Apr 1, 2013

I want to run rolling-stack upgrades on several stacks containing Catalyst 3750X-switches. I have done as follows: Configured the redundant uplinks as active and stand-by.Started to upgrade by using archive download-sw /rolling-stack-upgrade /overwrite /reload The upgrade starts as expected BUT switch number 2 in the stack is reloaded BEFORE switch 1 is finnished, the result is of course downtime for the stack. The documentation says something about the command "boot time", but what is this command doing? The default seems to be 7 minutes, it this parameter the time the upgrade-process waits before booting the next switch in the stack? I would expect that switch number 2 is reloaded when switch 1 is up again after reload, and not after an absolute number of minutes, is the rolling-stack-upgrade not working this way ?

View 4 Replies View Related

Cisco Switching/Routing :: Catalyst WS-C3750-48P And WS-C3750G-16TD Stack?

Jan 1, 2012

I have 8 switch stack consisting of six WS-C3550-48P and two WS-C3750G-16TD running software vesrion 12.2(25) SEB1. When I added new C3750v2-24PS (running image 12.2(50) SE5) in stack so I up-graded the image of existing 8 switches with latest veriosn 12.2(50) SE5. Once I have done with the upgrade then all ports of my stack switches went down after around five minuts. Is it image compatibility issue with existing switches or something else?

View 7 Replies View Related

Cisco Switching/Routing :: Maximum Switches Per Stack For Catalyst 2960

Apr 23, 2007

Any one who knows where I can find a documentation where it says the maximum switches per stack for the Catalyst 2960 family?

View 2 Replies View Related