Cisco Switching/Routing :: SC/LC Cable Between 2960S Stack And 4948
Aug 9, 2012
I'm connecting the two devices above and I need an LC to SC fiber cable. It should be pretty simple but I've seen two different types of LC/SC cables - one is 8.3/125 and one is 62.5/125. I believe the 62.5 is an older cable type but when looking at the detail sheets for each of the SFPs I see that both of these support a 62.5 or 50 micron core size.
View 2 Replies
ADVERTISEMENT
Mar 11, 2013
I would like if is possible to stack a Cisco 4900M with a 2960S. I know it is not the most common situation but i need it.
View 1 Replies
View Related
Apr 29, 2013
I have a running setup having 2 Cisco 2960s 24 TS switch with Stack configuration. Now I want to add one more same Cisco switch. My questions are:-
1) How can I do this...(Should follow the same process as I did before.
2) Could I do this without impacting the service. i.e. without rebooting the switch.
3) What should be the connection archiecture as of now since there is two switch so it is connected 1 -1 and 2-2. but for 3 switch should we require to change the connectivity.
View 1 Replies
View Related
Mar 11, 2013
I would like to know if i can and how stack a Cisco 4900M with a 2960S. I know it's not the most common but i need it.
View 2 Replies
View Related
May 7, 2013
I have 4 switchs 2960s in stack, but this not full ring. [code]the interface stack 1 for switch 1 is down and interface stack 2 for switch 4 is down.I do insert this command "switch 1 stack port 1 enabled" but interface are not up.
View 4 Replies
View Related
Apr 18, 2012
I was just curious about something with upgrading a 2960s stack.
To copy the image to the switches in the stack I use: Switch# archive download-sw tftp://x.x.x.x/filename
Does this also set the image as the boot image or do I still need to issue the boot system flash command?
can I just issue this command on the master switch and reload and the new config will be pushed to the rest of the switches?
View 5 Replies
View Related
Oct 1, 2012
I need to add two additional 2960S switches to my stack. I saw a diagram that showed how a 4 switch stack can be connected, but I couldn't find much detail on adding a switch to an existing stack (besides master election). The output below shows how the existing stack is connected and its state
SW#sh switch detail
Switch/Stack Mac Address : 0011.2222.3333
H/W Current
[Code].....
I will need to break one of the stack rings between SW1 and SW2 in order to connect the new switches. Does it really matter which ring I break to connect the additional switches? Does one ring act as primary? If so, I'd rather not break that ring so this process is transparent as possible. Also, is there any benefit to disabling the stack port vs just disconnecting the cable?
View 2 Replies
View Related
Mar 5, 2013
I have an 2960S all configured, with vlans, ports configurations and others.Now, I bought other 2960S and two stack modules to create a stack with these 2 switches.We call:
-Switch1 (I have configured and in production)
-Switch2 (New switch, no configured)
Can I connect these two switches in stack without lost the configuration of my Switch1 and no turn-off this switch? Does not stop the users access?
View 1 Replies
View Related
May 6, 2013
I have a single 2960s without stack module. The stack port has a status of down, however I'd like to disable it so that it does not generate a false alarm in my NMS. The documentation states that there should be a command "switch 1 stack port 1 disable" but the switch (running 15.0(2)SE2) doesn't seem to be available. Is this a dcumentation bug or is the command not there at all?
View 2 Replies
View Related
Dec 1, 2010
I have a new problem with Catalyst 2960S. We have four switch in a stack and now I get the message:
“%PLATFORM_RPC-3-MSG_THROTTLED: RPC Msg Dropped by throttle mechanism: type 37, class 14, max_msg 32, total throttled 73968 (hostname1-2)”
Traceback= 13A686C 160862C 160E0B4 15E2088 184FD48 18467B8
sh switch de
Switch/Stack Mac Address : 68bd.abc9.0000
H/W Current
[Code]....
View 36 Replies
View Related
Nov 5, 2011
applied an iOS update to a stack via tftp. I used the archive Download-sw tftp:// method. I rebooted the stack after complete and it never came back up. I discovered the master switch upgraded but not the member. The member was sitting there with all amber lights on and frozen after the iOS load. The master wouldn't finish boot until I removed the member from the stack. I had a version mismatch and they would not communicate.
View 2 Replies
View Related
Oct 11, 2012
I would like to use flexstack to stack two Cisco 2960S 48 Port switches (2960S-48TD-L) for redundancy. Each switch will have a single 10G uplink into our Nexus 7K. One switch in the stack will terminate to linecard 6 (N7K-F248XP-25) and the other switch will terminate to linecard 7 (N7K-F248XP-25). My question is how many flexstack cables are needed? Do I need only one cable or do I need two to connect the two 2960s ?
View 2 Replies
View Related
May 15, 2013
I have 2 Catalyst 2960S-switches configured in a stack. The uplink is configured as a cross-stack etherchannel. Now I want to upgrade the stack with a minimum of downtime for the connected hosts. The hosts are connected to the stack via cross-stack etherchannels. So my question is: How can I upgrade the stack and reboot the members with a minimum of downtime? If I use the archive download-sw command with the /reload-option, the stack is reloaded and the result will be downtime for the hosts while th stack is reloading. Is it possible to upgrade the stack and then reboot the members one by one in a controlled manner?
View 8 Replies
View Related
Feb 27, 2013
I have to add a 2960s PoE switch to an existing stack of two 2960s PoE switches. If The new switch has no configuration on it and the existing stack is broken by pulling te stack cables and then new cables are added and everything re-cabled correctly will the new switch assume the configuration from the stack without any issues?
View 10 Replies
View Related
Jun 4, 2012
I have a stack of 2960S (c2960s-universalk9-mz.122-55.SE2.bin) and the master has failed (used to have a priority of 14). The second switch has become master (priority 1) as can be seen below: [code]
If I connect a new blank 2960S (same IOS) through the stack ports, will the master sync its config to the new one without causing problems?As I understand the new blank switch will also have a priority of 1 and will by default be numbered as 1. So if the config is correctly synced and I later on want to make switch 1 the master, I need to set the priority: [code]
View 4 Replies
View Related
Feb 27, 2013
Is there a stacking cable that is "bent"?Im using this cable:"CAB-STACK-50CM", "Cisco StackWise 50CM Stacking Cable".But it takes up to much room in the back of the switch, is there such a thing as "bent" stacking cable.
View 1 Replies
View Related
Sep 23, 2012
I have a live 28port Catalyst 2960S switch. By live I mean that there is an essential piece of equipment plugged into this switch that can suffer little to no downtime. Over the course of time the number of devices patched into this location has increased to exceed the 24 ports available and we have had to resort to adding unmanaged switches to fill the need. We have acquired an additional 2960 & stacking modules that I would like to stack together, keeping the existing switch as the master. It is my understanding that the stacking modules are hot-swappable and that this member switch can be added without bringing the master switch down, thus creating zero down time for the financial server that is connected.
The steps I believe that need to be followed are as such: write mem to existing switch and backup to our TFTP serverinstall the stack module in the existing (while powered up) and new (while powered down)place the 2 redundant FlexStack link cables on both switchesthen simply power the member switch on After boot the member switch will get it's OS and configuration from the master and I can begin moving CAT5 cables from the unmanaged switches to the stack.
View 2 Replies
View Related
Oct 30, 2012
specifying Cisco devices and I've made an error.I have 2 Catalyst 2960S switches (C2960S-24PS-L).Based on this snippet of web copy from the Cisco website:What's new for the Cisco Catalyst 2960-S Series Switches with LAN Base Software: # 10 and 1 Gigabit Ethernet uplink flexibility with Small Form-Factor Pluggable Plus (SFP+), providing business continuity and fast transition to 10 Gigabit Ethernet I bought a cable assembly "SFP-H10GB-CU3M" (3 meter copper twinax cable with 10GB SFPs on each end). Unfortunately, it appears after more careful reasearch that my specific model 2960S's are not directly compatible. , can I force these 10GB SFPs down to 1GB and get them to work with my switches or do I need to return and repurchase?
View 1 Replies
View Related
Nov 20, 2011
I have two 3750G switches stacked together however it's not in a full ring configuration:
Stack Ring Speed : 16G
Stack Ring Configuration: Half
Stack Ring Protocol : StackWise
And as shown below it's obvious which cable is not working:
show switch neighbors
Switch # Port 1 Port 2
-------- ------ ------
1 2 None
2 None 1
It's not flapping - it's like the cable isn't there at all. I'm going to try reseating the cable in there and perhaps an all out replacement if necessary. My question - is there any threat of a reboot of the switch stack or of partitioning of the switch stack by trying to get the 2nd cable working?
View 1 Replies
View Related
Apr 25, 2013
I have two Cisco 48 port Catalyst 2960-S series SI. Instead of buying the pricy stack modules can I only use the SFP+cable to connect them as stack? which type of SFP+cable should I buy? do I need any license to use those SFP ports?
View 9 Replies
View Related
May 8, 2012
We have two dedicated racks for our DMZ. We need to connect them to a firewall. We do all the cabling inside the rack, so each of them must have a top of rack.Problem is, switch in rack 2 will be connected to rack 1 and then to firewall, so if switch 1 fail, we lose both of them.
I would love to stack them like 3750 but I don't think there is stack-wise cable long enough to connect two racks (and I suppose this length isn't supported by technology).We have only one port left in the FW.
View 9 Replies
View Related
Oct 31, 2012
I have 3 switches in my 3750 X stack. I am getting the following error in the logs: %PLATFORM_STACKPOWER-4-PRIO_CONFLICT: Switch 1's power stack has conflicting power priorities. Not sure what I should do next. Below is my Stack-power configuration:
Power stack name: Powerstack-1 Stack mode: Power sharing Stack topology: Ring Switch 1: Power budget: 735 Low port priority value: 20 High port priority value: 10 Switch priority value: 2 Port 1 status: Connected Port 2 status: Connected Neighbor on port 1: c464.1308.7900 Neighbor on port 2: e8b7.4827.e680
Switch 3: Power budget: 729 Low port priority value: 22 High port priority value: 13 Switch priority value: 4 Port 1 status: Connected Port 2 status: Connected Neighbor on port 1: 2894.0fd9.9f00 Neighbor on port 2: 2894.0fd8.e200
Switch 2: Power budget: 690 Low port priority value: 21 High port priority value: 12 Switch priority value: 3 Port 1 status: Connected Port 2 status: Connected Neighbor on port 1: 2894.0fd8.e200 Neighbor on port 2: c464.1308.7900
Each switch has its own 715W power supply in it and all check out OK.
View 3 Replies
View Related
Sep 24, 2012
A site that i am responsible for has the following equipment installed:
2 x 3750G Switches configured as a stack using Stackwise - Collapsed Core/Distribution Layer
5 x 2960G Switches as Access Layer switches
WAN connections into the Core/Distribution Layer are all Gigabit Ethernet over Fibre.This is a dedicated CCTV Network with 50 Cameras all streaming video into the Core (decoders connected to access switches)Each 2960G has 2 links to the Core/Distribution 3750G Switches, 1 to each switch - Gigabit.I'm running rapid-pvst on all switches, so spanning tree is blocking one of the ports and effectively halving the 2 gig bandwidth. Next year our customer is going to add in a further 50 - 60 cameras.After monitoring the current loading on the ports in use, we have suggested to the customer that the 2 connections to each should be Ether-channeled together. [code]
First interface takes commands no problem, keep getting the message that etherchannel cannot be configured across different switches in a stack when i try to put the second interface commands on.
View 8 Replies
View Related
Jul 14, 2012
I cannot boot IOS, when i reload this switch it go to ROMMON. I try to uploand IOS but it still has problem. i think i may wrong some point during i did uploand.
This is problem
Switch#sh bootvar
BOOT variable = cat4500-entservicesk9-mz.150-2.SG3.bin,1;bootflash:cat4500-entservicesk9-mz.150-2.SG3.bin,1;bootflash:cat4500-entservicesk9-
[Code].....
View 2 Replies
View Related
Mar 13, 2013
My cisco 4948 switch is generating the below error,how do i troubleshoot this error.
*Mar 13 00:09:33.451: %C4K_L2MAN-6-INVALIDSOURCEADDRESSPACKET: (Suppressed 14 times)Packet received with invalid source MAC addre ss (00:00:00:00:00:00) on port Gi1/37 in vlan 1Gi1/37- to this port another 2950 switch is connected by trunk link.and to this switch end host is connected i.e.thin client
View 3 Replies
View Related
May 23, 2012
MAC Support: 16000
Backplane: 18Gbps
Forward: 28Gbps
VLAN's: 4000 (q-in-q support)
Jumbo Frame Supported
Supported 8000 static routing
!Supporting Stack!
Cisco 4948 supporting stackable? which product do you recommend to these criteria?
View 3 Replies
View Related
Sep 19, 2012
I am updating the iOS for a 4948 the bootflash is empty so all i can get into is the rommon. There is no option for x-modem. How can I put the iOS onto this device? [code]
View 2 Replies
View Related
Jun 5, 2013
We had to transport one of our 4948 10 GE to another Data Centre and when we got it there and tried to power up its System Status LED was red and we cannot even get console to the device.
We can try to see if the switch is completely dead and needs replacing or is there something we can do to get it back up and running again?
View 1 Replies
View Related
Apr 23, 2012
We purchased two new 4948 with two 10GE uplink ports and upgraded the devices to run IOS 15. My 6506 is running Sup 720 with s77233-adventerprisek0_wan-mz.122-33.SXI9. Currently we have 4948's connected to the same 6506's with no problems. Today I tried to add the new switches with new IOS and it caused of of my 6506 core switches to failover. I can't explain why because it was close to start of business and couldn't do much troubleshooting.
Currently we have four 4948 (running IOS 12.2(14) switches running Layer2 connecting dually to each of the two 6506 cores via 10GE fiber uplinks. I tried to add two more to the scenario, again running layer2 and dual-honing them to each of te 6506 switches. there are two 6506 core switches and they run HSRP and spanning tree is manually set to give priority to even vlans on one 6506 and odds on the other 6506. Also the new switches I tried to add did had rootguard applied as well as the uplinks.
We have to get this working and have no test environment to work with. We need to do this late this evening after close of business.
On another note, I have had problems upgrading some of my older 4948's to IOS 15. I followed Cisco's suggestion and upgraded the EPROM first and then the IOS upgrade took on three of the switches that were ordered rather recently. The four that were ordered in one batch will not take the upgrade even following Cisco's instruction and lots of other tricks. Nothing works. Having problems with IOS 15, in general?
View 1 Replies
View Related
Jul 25, 2012
I am planning to upgrade Cisco 4948 IOS upgrade. We have few with older code( 12.2(25)EWA7), when issue sh version shows as Catalyst 4000 L3 Switch Software. while newer version of the switch show as Catalyst 4500 L3 switch.
1 Is this/(sh ver output) just because of the Older code ?
My 2 question is according to release note : [URL]
You need to upgrade your ROMMON before the IOS . 2 What is the approximate time it take to do this ROMMON upgrade ?
View 2 Replies
View Related
Mar 8, 2013
I have 4948E module switch at customer site and below is the show version output. Image on the switch is not supporting 'AUTO QoS' as i need to enable Auto Qos on it to prioritize Voice traffic. Which image supports Auto QoS feature . Image should have L3 functionality also i mean it should support Routing protocols. I tried to enable auto QoS using by configuring "QoS' globally but no luck...with existing image.
{ URL}
ROM: 12.2(44r)SG9
Hobgoblin Revision 20, Fortooine Revision 1.22
Switch up time is 12 hours, 1 minute
System returned to ROM by reload
[ code]...
Configuration register is 0x2012
Switch#sh boot flash:
-#- --length-- -----date/time------ path
1 25793234 May 31 2011 15:20:20 cat4500e-entservicesk9-mz.122-54.SG.bin
2 25005209 Mar 08 2013 09:53:18 cat4500e-entservices-mz.122-54.SG1.bin
70033408 bytes available (58249216 bytes used)
View 1 Replies
View Related
Oct 2, 2012
In the Ciscoview, the uplink SFP interfaces of 2960S stack are represented incorrectly. The two uplink interface should be Ten1/0/1 and Ten4/0/1 but proved to be Ten1/0/1 and Gi4/0/25. There is no 1G SFP module, so that the interface gi4/0/25 doesn't exist. [code]
View 3 Replies
View Related
May 24, 2012
I would just like to confirm if it is possible to create a 2x10G etherchannel on a 4948.
View 4 Replies
View Related