Cisco Switching/Routing :: 2960s Stack Port Shutdown
May 6, 2013
I have a single 2960s without stack module. The stack port has a status of down, however I'd like to disable it so that it does not generate a false alarm in my NMS. The documentation states that there should be a command "switch 1 stack port 1 disable" but the switch (running 15.0(2)SE2) doesn't seem to be available. Is this a dcumentation bug or is the command not there at all?
View 2 Replies
ADVERTISEMENT
Oct 11, 2012
I would like to use flexstack to stack two Cisco 2960S 48 Port switches (2960S-48TD-L) for redundancy. Each switch will have a single 10G uplink into our Nexus 7K. One switch in the stack will terminate to linecard 6 (N7K-F248XP-25) and the other switch will terminate to linecard 7 (N7K-F248XP-25). My question is how many flexstack cables are needed? Do I need only one cable or do I need two to connect the two 2960s ?
View 2 Replies
View Related
Aug 11, 2011
I have a doubt. In my environment I have two Switch 3750-X in stack.
My question is: How to shutdown remotely only a switch in stack?
View 23 Replies
View Related
Oct 23, 2011
is it possible to shutdown a specific port on my 3750x and monitor this port at the same time .for example , im dealing with a mac authenticated network using port security , i want to shut down all the ports that are not used at the moment , however , if some one gets connected to the one of the shutdown ports i want to know the mac address of the user or atleast to know that i have someone who is just plugged in to the one of the shutdowned ports .
View 4 Replies
View Related
Mar 11, 2013
I would like if is possible to stack a Cisco 4900M with a 2960S. I know it is not the most common situation but i need it.
View 1 Replies
View Related
Apr 29, 2013
I have a running setup having 2 Cisco 2960s 24 TS switch with Stack configuration. Now I want to add one more same Cisco switch. My questions are:-
1) How can I do this...(Should follow the same process as I did before.
2) Could I do this without impacting the service. i.e. without rebooting the switch.
3) What should be the connection archiecture as of now since there is two switch so it is connected 1 -1 and 2-2. but for 3 switch should we require to change the connectivity.
View 1 Replies
View Related
Mar 11, 2013
I would like to know if i can and how stack a Cisco 4900M with a 2960S. I know it's not the most common but i need it.
View 2 Replies
View Related
May 7, 2013
I have 4 switchs 2960s in stack, but this not full ring. [code]the interface stack 1 for switch 1 is down and interface stack 2 for switch 4 is down.I do insert this command "switch 1 stack port 1 enabled" but interface are not up.
View 4 Replies
View Related
Aug 9, 2012
I'm connecting the two devices above and I need an LC to SC fiber cable. It should be pretty simple but I've seen two different types of LC/SC cables - one is 8.3/125 and one is 62.5/125. I believe the 62.5 is an older cable type but when looking at the detail sheets for each of the SFPs I see that both of these support a 62.5 or 50 micron core size.
View 2 Replies
View Related
Apr 18, 2012
I was just curious about something with upgrading a 2960s stack.
To copy the image to the switches in the stack I use: Switch# archive download-sw tftp://x.x.x.x/filename
Does this also set the image as the boot image or do I still need to issue the boot system flash command?
can I just issue this command on the master switch and reload and the new config will be pushed to the rest of the switches?
View 5 Replies
View Related
Oct 1, 2012
I need to add two additional 2960S switches to my stack. I saw a diagram that showed how a 4 switch stack can be connected, but I couldn't find much detail on adding a switch to an existing stack (besides master election). The output below shows how the existing stack is connected and its state
SW#sh switch detail
Switch/Stack Mac Address : 0011.2222.3333
H/W Current
[Code].....
I will need to break one of the stack rings between SW1 and SW2 in order to connect the new switches. Does it really matter which ring I break to connect the additional switches? Does one ring act as primary? If so, I'd rather not break that ring so this process is transparent as possible. Also, is there any benefit to disabling the stack port vs just disconnecting the cable?
View 2 Replies
View Related
Mar 5, 2013
I have an 2960S all configured, with vlans, ports configurations and others.Now, I bought other 2960S and two stack modules to create a stack with these 2 switches.We call:
-Switch1 (I have configured and in production)
-Switch2 (New switch, no configured)
Can I connect these two switches in stack without lost the configuration of my Switch1 and no turn-off this switch? Does not stop the users access?
View 1 Replies
View Related
Dec 1, 2010
I have a new problem with Catalyst 2960S. We have four switch in a stack and now I get the message:
“%PLATFORM_RPC-3-MSG_THROTTLED: RPC Msg Dropped by throttle mechanism: type 37, class 14, max_msg 32, total throttled 73968 (hostname1-2)”
Traceback= 13A686C 160862C 160E0B4 15E2088 184FD48 18467B8
sh switch de
Switch/Stack Mac Address : 68bd.abc9.0000
H/W Current
[Code]....
View 36 Replies
View Related
Nov 5, 2011
applied an iOS update to a stack via tftp. I used the archive Download-sw tftp:// method. I rebooted the stack after complete and it never came back up. I discovered the master switch upgraded but not the member. The member was sitting there with all amber lights on and frozen after the iOS load. The master wouldn't finish boot until I removed the member from the stack. I had a version mismatch and they would not communicate.
View 2 Replies
View Related
May 15, 2013
I have 2 Catalyst 2960S-switches configured in a stack. The uplink is configured as a cross-stack etherchannel. Now I want to upgrade the stack with a minimum of downtime for the connected hosts. The hosts are connected to the stack via cross-stack etherchannels. So my question is: How can I upgrade the stack and reboot the members with a minimum of downtime? If I use the archive download-sw command with the /reload-option, the stack is reloaded and the result will be downtime for the hosts while th stack is reloading. Is it possible to upgrade the stack and then reboot the members one by one in a controlled manner?
View 8 Replies
View Related
Feb 27, 2013
I have to add a 2960s PoE switch to an existing stack of two 2960s PoE switches. If The new switch has no configuration on it and the existing stack is broken by pulling te stack cables and then new cables are added and everything re-cabled correctly will the new switch assume the configuration from the stack without any issues?
View 10 Replies
View Related
Jun 4, 2012
I have a stack of 2960S (c2960s-universalk9-mz.122-55.SE2.bin) and the master has failed (used to have a priority of 14). The second switch has become master (priority 1) as can be seen below: [code]
If I connect a new blank 2960S (same IOS) through the stack ports, will the master sync its config to the new one without causing problems?As I understand the new blank switch will also have a priority of 1 and will by default be numbered as 1. So if the config is correctly synced and I later on want to make switch 1 the master, I need to set the priority: [code]
View 4 Replies
View Related
Sep 23, 2012
I have a live 28port Catalyst 2960S switch. By live I mean that there is an essential piece of equipment plugged into this switch that can suffer little to no downtime. Over the course of time the number of devices patched into this location has increased to exceed the 24 ports available and we have had to resort to adding unmanaged switches to fill the need. We have acquired an additional 2960 & stacking modules that I would like to stack together, keeping the existing switch as the master. It is my understanding that the stacking modules are hot-swappable and that this member switch can be added without bringing the master switch down, thus creating zero down time for the financial server that is connected.
The steps I believe that need to be followed are as such: write mem to existing switch and backup to our TFTP serverinstall the stack module in the existing (while powered up) and new (while powered down)place the 2 redundant FlexStack link cables on both switchesthen simply power the member switch on After boot the member switch will get it's OS and configuration from the master and I can begin moving CAT5 cables from the unmanaged switches to the stack.
View 2 Replies
View Related
Apr 9, 2013
a switch port is shutdown, but when i use NO SHUTDOWN command it is working and shows administratively down. like this command does not affect on it. i should enable this port? what can i do btw, port is not in errdisable and portfast is enabled.
View 3 Replies
View Related
Aug 28, 2012
Connecting Avaya 9611G IEEE class 1 devices to a Cat2960s. How ever some of the phone are registering as class 3 devices no matter what interface the phone is connected to. Typical port config is as follows:
interface GigabitEthernet1/0/2
switchport access vlan 25
switchport mode access
switchport nonegotiate
switchport voice vlan 22
srr-queue bandwidth share 1 30 35 5
[code]....
View 4 Replies
View Related
Feb 24, 2013
The 2960s-48lpd-l comes with 2 SFP+ ports and is capable of supporting either SFP or SFP+ modules.
My question is:- if I have a SFP+ module in port 1, can I have a SFP in port 2? or do they both have to be either SFP+ or SFP?
View 1 Replies
View Related
Nov 5, 2011
We are using catalyst 2960S Lan Base IOS on Radio towers. We just bought 50 Accest points, thas are GPS synchronized. Problem is the APs need to be connected on L2-mac betwen each other. But at this time we are using port isolation on each switch (tower) by protected port function to isolate clients from each other.
My question is, is possible to specifi a Mac addresses in specific vlan thats can comunicate betwen protected ports? On tower is one Master unit and others are slave. I thing there is only 1 dirrection comunication - from master to slave.
View 2 Replies
View Related
Sep 27, 2012
I just bought a Catalyst 2960S to test out the feature "Port-Based Address Allocation" which is required for our factory. I followed the instruction from Cisco IOS and did all the steps but I could not get it to work, my network client did not received the expected IP address that I configured.
View 8 Replies
View Related
May 19, 2013
I have a stack of 4 3750 Switches.
1. WS-C3750G-12S
2. WS-C3750G-12S
3. WS-C3750X-48P
4. WS-C3750X-48P
The stack cable connected to Switch 1 Port 1 and Switch 4 Port 2 will not come back online. The logs show that there was a Stack line change. I have replaced the 1 meter Stack cable from Switch 1 to Switch 4 three times and it still does not come back online. This is the part that is interesting.. I have disconnected Port 1 Switch 4 and connected it to Port 2 Switch 4 and then Switch 4 came back online. This made me think Port 2 on Switch 4 was working correctly. Then I disconnected Port 2 Switch 1 and connected it to Port 1 Switch 1 and then Switch 1 came back online.
View 1 Replies
View Related
Mar 11, 2013
have a cable i think is bad, is it possiable to switch the cable out without causing any downtime to the switch or connected devices?
HQ-1st-Flr-Stack#show switch stack-ports summary
Switch#/ Stack Neighbor Cable Link Link Sync # In
Port# Port Length OK Active OK Changes Loopback
Status To LinkOK
[Code].....
View 15 Replies
View Related
Mar 14, 2013
I'm trying to configure a stack between two WS-C2960S-48FPS-L but does not working.The switch port is always Down.I tried to change de module and cables.I tried to make a loop in one of two switches and the ports always down.
IOS: 12.2(55)SE5
#show switch stack-ports
Switch # Port 1 Port 2
-------- ------ ------
1 Down Down
View 15 Replies
View Related
Feb 7, 2011
I have a stack with a lot of stack-port changes, but on all the ports, how can I determine the faulty switch in the stack, cables are already verified. We did also a restart of the whole stack power off/on
running version
WS-C3750-48P 12.2(55)SE C3750-IPBASEK9-M
This is the output after 6weeks
Switch#/ Stack Neighbor Cable Link Link Sync # In Port# Port Length OK Active OK Changes Loopback Status To LinkOK -------- ------ -------- -------- ---- ------ ---- --------- -------- 1/1 OK 4 1
[Code].....
View 7 Replies
View Related
Aug 7, 2012
I have a stack of 3750G's where the connection between switch 1 port 1 and switch 2 port 2 are down
Stack Port Status Neighbors
Switch# Port 1 Port 2 Port 1 Port 2
--------------------------------------------------------
1 Down Ok None 3
2 Ok Down 3 None
3 Ok Ok 1 2
I have ruled out the stackwise cable as the problem but would like to know which switch has the problem
View 1 Replies
View Related
Feb 23, 2012
2960 switch stack (flex) Spanning tree re-calculate from stack port one?I need to identify with port in the stack is causing the re-calc I have four 48 port switches and show spanning detail only indicates stack port 1.
View 1 Replies
View Related
Sep 27, 2012
I am having an issue on a Cisco 3750 stack where when the stack master is rebooted, all my lacp port-channels drop and then come back up again. After doing some investigation It seems that it is happening because of lacp using the stack master mac-address as part of the system-id, so when the stack master reboots, the stack mac changes. I see that there is the command: stack-mac persistent timer 0
There is this warning about using this command:
When you configure this feature, a warning message displays the consequences of your configuration. You should use this feature cautiously. Using the old master MAC address elsewhere in the domain could result in lost traffic.
My question are:
Are there any other consequences to using this command (apart from moving the switch/mac to another location in the network)It mentions 'If the entire switch stack reloads, it acquires the MAC address of the master as the stack MAC address' Is this still the case if you have the stack-mac persistent timer to 0? Does using channel-group mode on for the port-channels still use the same mechanism of having a system-id? (Will the channels flap using 'mode on' when rebooting the stack master.
View 4 Replies
View Related
Feb 18, 2013
I have two stacks 3750X on two different sites with two links L_2_L, and I want to configure the port channel to aggregate the two links.
Site A Site B
3750X -A1 --------------------------------------( )--------------------------------------- 3750X -B1
( L-2-L )
3750X -A2 --------------------------------------( )--------------------------------------- 3750X -B2
Below the configuration that I have put the two stacks.
site A
interface Port-channel5
description Etherchannel group entre le stack 3750X-A et Switch Lan_2_Lan
switchport trunk encapsulation dot1q
switchport trunk allowed vlan 11,12,999
switchport mode trunk
switchport nonegotiate
speed 100
But the problem is only one link is Bundeled in channel group, see below
Group Port-channel Protocol Ports
------+-------------+-----------+-----------------------------------------------
5 Po5(SU) LACP Gi1/0/15(I) Gi2/0/15(P)
View 8 Replies
View Related
Feb 27, 2013
Is there a stacking cable that is "bent"?Im using this cable:"CAB-STACK-50CM", "Cisco StackWise 50CM Stacking Cable".But it takes up to much room in the back of the switch, is there such a thing as "bent" stacking cable.
View 1 Replies
View Related
Oct 31, 2012
I have 3 switches in my 3750 X stack. I am getting the following error in the logs: %PLATFORM_STACKPOWER-4-PRIO_CONFLICT: Switch 1's power stack has conflicting power priorities. Not sure what I should do next. Below is my Stack-power configuration:
Power stack name: Powerstack-1 Stack mode: Power sharing Stack topology: Ring Switch 1: Power budget: 735 Low port priority value: 20 High port priority value: 10 Switch priority value: 2 Port 1 status: Connected Port 2 status: Connected Neighbor on port 1: c464.1308.7900 Neighbor on port 2: e8b7.4827.e680
Switch 3: Power budget: 729 Low port priority value: 22 High port priority value: 13 Switch priority value: 4 Port 1 status: Connected Port 2 status: Connected Neighbor on port 1: 2894.0fd9.9f00 Neighbor on port 2: 2894.0fd8.e200
Switch 2: Power budget: 690 Low port priority value: 21 High port priority value: 12 Switch priority value: 3 Port 1 status: Connected Port 2 status: Connected Neighbor on port 1: 2894.0fd8.e200 Neighbor on port 2: c464.1308.7900
Each switch has its own 715W power supply in it and all check out OK.
View 3 Replies
View Related