Cisco Switching/Routing :: Stack 4900M With 2960S?

Mar 11, 2013

I would like to know if i can and how stack a Cisco 4900M with a 2960S. I know it's not the most common but i need it.

View 2 Replies


ADVERTISEMENT

Cisco Switching/Routing :: Stack 4900M With 2960S?

Mar 11, 2013

I would like if is possible to stack a Cisco 4900M with a 2960S. I know it is not the most common situation but i need it.

View 1 Replies View Related

Cisco Switching/Routing :: 2960s / Add One More Switch In Stack?

Apr 29, 2013

I have a running setup having 2 Cisco 2960s 24 TS switch with Stack configuration. Now I want to add one more same Cisco switch. My questions are:-
 
1) How can I do this...(Should follow the same process as I did before.

2) Could I do this without impacting the service. i.e. without rebooting the switch.

3) What should be the connection archiecture as of now since there is two switch so it is connected 1 -1 and 2-2. but for 3 switch should we require to change the connectivity.

View 1 Replies View Related

Cisco Switching/Routing :: Stack 2960s Not Full

May 7, 2013

I have 4 switchs 2960s in stack, but this not full ring. [code]the interface stack 1 for switch 1 is down and interface stack 2 for switch 4 is down.I do  insert this command "switch 1 stack port 1 enabled" but interface are not up.

View 4 Replies View Related

Cisco Switching/Routing :: SC/LC Cable Between 2960S Stack And 4948

Aug 9, 2012

I'm connecting the two devices above and I need an LC to SC fiber cable. It should be pretty simple but I've seen two different types of LC/SC cables - one is 8.3/125 and one is 62.5/125. I believe the 62.5 is an older cable type but when looking at the detail sheets for each of the SFPs I see that both of these support a 62.5 or 50 micron core size.

View 2 Replies View Related

Cisco Switching/Routing :: 2960s Switch Stack IOS Upgrade?

Apr 18, 2012

I was just curious about something with upgrading a 2960s stack.
 
To copy the image to the switches in the stack I use: Switch# archive download-sw tftp://x.x.x.x/filename
 
Does this also set the image as the boot image or do I still need to issue the boot system flash command?
 
can I just issue this command on the master switch and reload and the new config will be pushed to the rest of the switches?

View 5 Replies View Related

Cisco Switching/Routing :: Adding Two 2960S To Existing Stack

Oct 1, 2012

I need to add two additional 2960S switches to my stack. I saw a diagram that showed how a 4 switch stack can be connected, but I couldn't find much detail on adding a switch to an existing stack (besides master election). The output below shows how the existing stack is connected and its state
 
SW#sh switch detail
Switch/Stack Mac Address : 0011.2222.3333
H/W   Current

[Code]..... 
 
I will need to break one of the stack rings between SW1 and SW2 in order to connect the new switches. Does it really matter which ring I break to connect the additional switches? Does one ring act as primary? If so, I'd rather not break that ring so this process is transparent as possible. Also, is there any benefit to disabling the stack port vs just disconnecting the cable?

View 2 Replies View Related

Cisco Switching/Routing :: Create Stack With 2960S Already Configured

Mar 5, 2013

I have an 2960S all configured, with vlans, ports configurations and others.Now, I bought other 2960S and two stack modules to create a stack with these 2 switches.We call:

-Switch1 (I have configured and in production)
-Switch2 (New switch, no configured)
 
Can I connect these two switches in stack without lost the configuration of my Switch1 and no turn-off this switch? Does not stop the users access?

View 1 Replies View Related

Cisco Switching/Routing :: 2960s Stack Port Shutdown

May 6, 2013

I have a single 2960s without stack module. The stack port has a status of down, however I'd like to disable it so that it does not generate a false alarm in my NMS. The documentation states that there should be a command "switch 1 stack port 1 disable" but the switch (running 15.0(2)SE2) doesn't seem to  be available. Is this a dcumentation bug or is the command not there at all?

View 2 Replies View Related

Cisco Switching/Routing :: Catalyst 2960S Stack Required

Dec 1, 2010

I have a new problem with Catalyst 2960S. We have four switch in a stack and now I get the message:
 
“%PLATFORM_RPC-3-MSG_THROTTLED: RPC Msg Dropped by throttle mechanism: type 37, class 14, max_msg 32, total throttled 73968 (hostname1-2)”
 
Traceback= 13A686C 160862C 160E0B4 15E2088 184FD48 18467B8
 
sh switch de
Switch/Stack Mac Address : 68bd.abc9.0000
H/W   Current
[Code]....

View 36 Replies View Related

Cisco Switching/Routing :: Failure On 2960s Stack IOS Upgrade

Nov 5, 2011

applied an iOS update to a stack via tftp.  I used the archive Download-sw tftp:// method.  I rebooted the stack after complete and it never came back up. I discovered the master switch upgraded but not the member.  The member was sitting there with all amber lights on and frozen after the iOS load.  The master wouldn't finish boot until I removed the member from the stack.  I had a version mismatch and they would not communicate.

View 2 Replies View Related

Cisco Switching/Routing :: To Use Flexstack To Stack Two 2960S 48 Port Switches

Oct 11, 2012

I would like to use flexstack to stack two Cisco 2960S 48 Port switches (2960S-48TD-L) for redundancy. Each switch will have a single 10G uplink into our Nexus 7K. One switch in the stack will terminate to linecard 6 (N7K-F248XP-25) and the other switch will terminate to linecard 7 (N7K-F248XP-25). My question is how many flexstack cables are needed? Do I need only one cable or do I need two to connect the two 2960s ?

View 2 Replies View Related

Cisco Switching/Routing :: 2960S How To Upgrade Stack / Then Reboot Members One By One

May 15, 2013

I have 2 Catalyst 2960S-switches configured in a stack. The uplink is configured as a cross-stack etherchannel. Now I want to upgrade the stack with a minimum of downtime for the connected hosts. The hosts are connected to the stack via cross-stack etherchannels. So my question is: How can I upgrade the stack and reboot the members with a minimum of downtime? If I use the archive download-sw command with the /reload-option, the stack is reloaded and the result will be downtime for the hosts while th stack is reloading. Is it possible to upgrade the stack and then reboot the members one by one in a controlled manner?

View 8 Replies View Related

Cisco Switching/Routing :: Adding 2960s To Existing Stack Of Two POE Switches

Feb 27, 2013

I have to add a 2960s PoE switch to an existing stack of two 2960s PoE switches. If The new switch has no configuration on it and the existing stack is broken by pulling te stack cables and then new cables are added and everything re-cabled correctly will the new switch assume the configuration from the stack without any issues?

View 10 Replies View Related

Cisco Switching/Routing :: 2960S Replace Master Switch In Stack

Jun 4, 2012

I have a stack of 2960S (c2960s-universalk9-mz.122-55.SE2.bin) and the master has failed (used to have a priority of 14). The second switch has become master (priority 1) as can be seen below: [code]

If I connect a new blank 2960S (same IOS) through the stack ports, will the master sync its config to the new one without causing problems?As I understand the new blank switch will also have a priority of 1 and will by default be numbered as 1. So if the config is correctly synced and I later on want to make switch 1 the master, I need to set the priority: [code]

View 4 Replies View Related

Cisco Switching/Routing :: Creating Stack Of 2960s From Single Live Switch

Sep 23, 2012

I have a live 28port Catalyst 2960S switch. By live I mean that there is an essential piece of equipment plugged into this switch that can suffer little to no downtime. Over the course of time the number of devices patched into this location has increased to exceed the 24 ports available and we have had to resort to adding unmanaged switches to fill the need. We have acquired an additional 2960 & stacking modules that I would like to stack together, keeping the existing switch as the master. It is my understanding that the stacking modules are hot-swappable and that this member switch can be added without bringing the master switch down, thus creating zero down time for the financial server that is connected.
 
The steps I believe that need to be followed are as such: write mem to existing switch and backup to our TFTP serverinstall the stack module in the existing (while powered up) and new (while powered down)place the 2 redundant FlexStack link cables on both switchesthen simply power the member switch on After boot the member switch will get it's OS and configuration from the master and I can begin moving CAT5 cables from the unmanaged switches to the stack.

View 2 Replies View Related

Cisco Switching/Routing :: CAB-STACK-50CM Bent Stack Cable

Feb 27, 2013

Is there a stacking cable that is "bent"?Im using this cable:"CAB-STACK-50CM", "Cisco StackWise 50CM Stacking Cable".But it takes up to much room in the back of the switch, is there such a thing as "bent" stacking cable.

View 1 Replies View Related

Cisco Switching/Routing :: Configuring Stack-power On A 3750X Stack?

Oct 31, 2012

I have 3 switches in my 3750 X stack. I am getting the following error in the logs:  %PLATFORM_STACKPOWER-4-PRIO_CONFLICT: Switch 1's power stack has conflicting power priorities.  Not sure what I should do next. Below is my Stack-power configuration:
 
Power stack name: Powerstack-1    Stack mode: Power sharing    Stack topology: Ring    Switch 1:        Power budget: 735        Low port priority value: 20        High port priority value: 10        Switch priority value: 2        Port 1 status: Connected        Port 2 status: Connected        Neighbor on port 1: c464.1308.7900        Neighbor on port 2: e8b7.4827.e680
    Switch 3:        Power budget: 729        Low port priority value: 22        High port priority value: 13        Switch priority value: 4        Port 1 status: Connected        Port 2 status: Connected        Neighbor on port 1: 2894.0fd9.9f00        Neighbor on port 2: 2894.0fd8.e200
    Switch 2:        Power budget: 690        Low port priority value: 21        High port priority value: 12        Switch priority value: 3        Port 1 status: Connected        Port 2 status: Connected        Neighbor on port 1: 2894.0fd8.e200        Neighbor on port 2: c464.1308.7900
 
Each switch has its own 715W power supply in it and all check out OK.

View 3 Replies View Related

Cisco Switching/Routing :: 2960G Configuring Ether-channel On Stack-wise Stack

Sep 24, 2012

A site that i am responsible for has the following equipment installed: 

2 x 3750G Switches configured as a stack using Stackwise - Collapsed Core/Distribution Layer
5 x 2960G Switches as Access Layer switches
 
WAN connections into the Core/Distribution Layer are all Gigabit Ethernet over Fibre.This is a dedicated CCTV Network with 50 Cameras all streaming video into the Core (decoders connected to access switches)Each 2960G has 2 links to the Core/Distribution 3750G Switches, 1 to each switch - Gigabit.I'm running rapid-pvst on all switches, so spanning tree is blocking one of the ports and effectively halving the 2 gig bandwidth. Next year our customer is going to add in a further 50 - 60 cameras.After monitoring the current loading on the ports in use, we have suggested to the customer that the 2 connections to each should be Ether-channeled together. [code]
 
First interface takes commands no problem, keep getting the message that etherchannel cannot be configured across different switches in a stack when i try to put the second interface commands on.

View 8 Replies View Related

Cisco Switching/Routing :: 4900M Management Configuration Via Vrf

Mar 10, 2013

I am just going to deploy some new 4900Ms for a customer. Want to know if configuring management for 4900 (everything like NTP, AAA, SNMP , DNS ) is doable through management interface in management VRF and there are no caveats to be aware of.

View 1 Replies View Related

Cisco Switching/Routing :: How To Configure CVR-X2-SFP On 4900M Switches

Apr 4, 2013

I have an issue with couple of Cisco 4900M switches. We just got them and tried to use the TwinGig Converter on the 4 ports 10G module.
 
The problem is that the switches sees the new module in slot 2 and when we are inserting the TwinGig Converters we are getting the error message and when we are trying  to type the command this command it does not work."hw-module module <slot> port-group <group> select gigabitethernet",When we go to config T, the only thing we can type is "hw-module module <slot> and if we do a ? the only thing is available is logging and power and we can't type
 
Port-Group or anything else. Is this a hidden command or we have to something else?

View 1 Replies View Related

Cisco Switching/Routing :: 4900M / CPU Receive Q (L3 Glean / 6)

Jul 30, 2012

on a Cisco 4900M running IOS Software, Catalyst 4500 L3 Switch Software (cat4500e-ENTSERVICESK9-M), Version 15.0(2)SG1, RELEASE SOFTWARE (fc4) I'm getting a lot of packets on CPU Q "L3 Glean, 6".What is that queue and what could be the root cause?

Packets Received by Packet Queue
  
Queue                  Total           5 sec avg 1 min avg 5 min avg 1 hour avg
---------------------- --------------- --------- --------- --------- ----------
Host Learning                     1563         0         0         0          0
L2 Control                     1138188         3         0         0          0
Ttl Expired                          2         0         0         0          0
L3 Glean, 6                    4889394      4067      4381      3367        779

[code]....

View 1 Replies View Related

Cisco Switching/Routing :: 4900M - 1GB Port Connectivity?

Aug 10, 2012

Is it possible to use 1GB (SFP / Copper) on the built-in 8 x X2-10GB ports without any Network Module of 1/10GB. If so how.

View 2 Replies View Related

Cisco Switching/Routing :: X2 Module 4900M Upgrade SAN To Use 10g

Jan 4, 2012

I have a client whom has a 4900M switch as their SAN switch. They are getting ready to upgrade their SAN to use 10G.I had quoted them a price for an X2 module, but I am unclear based on pictures I have seen of the part number
 
X2-10GB-SR
 
whether or not the X2 module plugs into the X2 slot on the switch, AND then also has to have a transceiver put in it to receive the SC ends of the Fiber jumper, or whether the SC ends of the fiber jumper plug into the X2 module directly.

View 5 Replies View Related

Cisco Switching/Routing :: 4900M - Upgrade IOS Version

May 7, 2012

I have this 4900M running version 12.2(54)SG1.  I the log I get this 3 lines:

May  8 08:32:15: %C4K_SWITCHINGENGINEMAN-4-TCAMINTERRUPT: (Suppressed 429 times)flCam0  aPErr interrupt. errAddr: 0xC48 dPErr: 1 mPErr: 0 valid: 1
May  8 08:32:24: %C4K_L3HWFORWARDING-4-FLTCAMPARITYERROR: (Suppressed 866 times)FL Tcam Perr with no FwdEntry Hw index: 3144 Hw entry:  Sw entry:
May  8 08:32:45: %C4K_SWITCHINGENGINEMAN-4-TCAMINTERRUPT: (Suppressed 432 times)flCam0  aPErr interrupt. errAddr: 0xC48 dPErr: 1 mPErr: 0 valid: 1
 
They seems to be coming on regular basis, repeating every minute. I've tried Google and the most relevant info I can find is this {URL}. But it says "Upgrade software to IOS version 12.2(52)SG or later OR 12.2(50)SG4 or later. ".  I'm already running 12.2(54), so why does this 3 line repeatedly show up in the log every minute.

View 2 Replies View Related

Cisco Switching/Routing :: 4900M - Basic Configuration And Administration

Jan 1, 2013

First time user of cisco hardware and we just purchased the 4900m catalyst switch.  My question is very general.  I am simply hoping to network 3 servers together and I do not wish to do any fancy or advanced configuration.  Can I simply use the web management interface for network administration and setup?  I just downloaded the Catalyst 4500 Series Switch Cisco IOS software configuration guide and they talk about Cisco View network management system, is this my answer or is this what most people use for basic configuration and administration?

View 3 Replies View Related

Cisco Switching/Routing :: How To Setup SPAN On 4900m Switch

Feb 12, 2013

I currently have IOS image cat4500e-entservices-mz.122-53.SG5.bin.  According to my research it appears SPAN is supported on this OS.  However, after looking at procedure notes using websites like here:

[url]... I cannot find and obviously not figure out how to use the SPAN  command.  My main objective is to simply setup a port mirror on one of my TenGigabitEthnet interfaces and from what I read SPAN is the best way to setup a tap interface on a cisco switch.

View 2 Replies View Related

Cisco Switching/Routing :: 4900M Management Configuration Required

Dec 8, 2011

I am just going to deploy some new 4900Ms for a customer. Want to know if configuring management for 4900 (everything like NTP, AAA, SNMP , DNS ) is doable through management interface in management VRF and there are no caveats to be aware of.

View 1 Replies View Related

Cisco Switching/Routing :: 4900M Etherchannel Load Balancing

Dec 18, 2012

We have to cisco WS-C4900M with Cisco IOS Software, Catalyst 4500 L3 Switch Software (cat4500e-IPBASE-M), Version 12.2(53)SG5, RELEASE SOFTWARE (fc1).We have four gigabit link connected between those two switches.We have create a LACP port channel with those four ports on both switches. Ether-channel is up and running and defined with a load-balancing method of src-dst-ip.But when we test the load-balancing, it's not using the src-dst-ip rule with the XOR: [code]

View 5 Replies View Related

Cisco Switching/Routing :: 4900M Connecting 10GB Interface To 1GB

May 12, 2012

I have 4900M with X2-10G-LX4I need to have a link from it to 3560X GLC-SX-MM using MM Fiber Patch Cord.any configuration required in 4900M to change the speed of X2-10GB-LX4 to 1GB ?

View 2 Replies View Related

Cisco Switching/Routing :: Upgrading 4900m IOS From IPBase To Enterprise?

Feb 10, 2013

My current version IOS is cat4500e-ipbase-mz.122-53.SG5.bin.  I just got a new version cat4500e-entservicesk9-mz.122-53.SG5.bin.I put the new version in bootflash: directory and tried various methods of starting the IOS up to run the new version but it always started in the original ipbase version.  My start-config shows:

boot-start-marker
boot system flash bootflash:cat4500e-entservices9l-mz.122-53.SG5.bin
boot-end-marker
 
and I even deleted the ipbase version in the bootflash: directoy so then my switch would not even boot up at all and hung in rommon. In rommon I tried

boot bootflash:cat4500e-entservicesk9-mz.122-53.SG5.bin
and the result I got back was
File has bad file magic number: 0x0
 
So I had to point the switch to my tftp server and boot back into a back up copy of ipbase.  how I can get my new IOS version to work?  I understand I might have to download it again but I just got it so I am skeptical it is a bad file. [URL] as a procedure guide and I do notice some of those commands/steps do not work on my 4900m switch.

View 3 Replies View Related

Cisco Switching/Routing :: 4900m Switch Enable HTTP

Jan 6, 2013

I have been trying to get the http server enabled so I can access Cisco Network Assistant.  I have my interfaces configured but for some reason the server in not running, port 80 is still closed. [code]

View 2 Replies View Related

Cisco Switching/Routing :: 4900M Basic Management Setup

Apr 13, 2010

I' ve three 4900M switches equipped with the WS-X4920-GB-RJ45 module and the WS-X4908-10GE module. Now I'm started to setup these switches in our lab environment for the first time. They behave a little bit strange in comparison with the C3750 series which I used before and which I will replace by these powerful machines.

I tried to setup these switches to be managed through the management port. I configured IP address, default route in the management vrf, set the source-interface for tftp,ssh,ftp and tacacs to use the management port. Ping using the manangement port was successful. After finishing theses steps I configured the TACACS and AAA settings accordingly the informations I found on CCO. I tested the settings with "test aaa group authentication" command- without success. On my Cisco ACS no request was received and the switch told me he could't reach the tacacs server. Other switches in the same IP subnet are working without failure, so firewall or server should not be the problem.

View 5 Replies View Related







Copyrights 2005-15 www.BigResource.com, All rights reserved