Cisco Switching/Routing :: 3750 Stack-wise Cable Long Enough To Connect Two Racks
May 8, 2012
We have two dedicated racks for our DMZ. We need to connect them to a firewall. We do all the cabling inside the rack, so each of them must have a top of rack.Problem is, switch in rack 2 will be connected to rack 1 and then to firewall, so if switch 1 fail, we lose both of them.
I would love to stack them like 3750 but I don't think there is stack-wise cable long enough to connect two racks (and I suppose this length isn't supported by technology).We have only one port left in the FW.
I have two 3750G switches stacked together however it's not in a full ring configuration:
Stack Ring Speed : 16G Stack Ring Configuration: Half Stack Ring Protocol : StackWise
And as shown below it's obvious which cable is not working:
show switch neighbors Switch # Port 1 Port 2 -------- ------ ------ 1 2 None 2 None 1
It's not flapping - it's like the cable isn't there at all. I'm going to try reseating the cable in there and perhaps an all out replacement if necessary. My question - is there any threat of a reboot of the switch stack or of partitioning of the switch stack by trying to get the 2nd cable working?
A site that i am responsible for has the following equipment installed:
2 x 3750G Switches configured as a stack using Stackwise - Collapsed Core/Distribution Layer 5 x 2960G Switches as Access Layer switches
WAN connections into the Core/Distribution Layer are all Gigabit Ethernet over Fibre.This is a dedicated CCTV Network with 50 Cameras all streaming video into the Core (decoders connected to access switches)Each 2960G has 2 links to the Core/Distribution 3750G Switches, 1 to each switch - Gigabit.I'm running rapid-pvst on all switches, so spanning tree is blocking one of the ports and effectively halving the 2 gig bandwidth. Next year our customer is going to add in a further 50 - 60 cameras.After monitoring the current loading on the ports in use, we have suggested to the customer that the 2 connections to each should be Ether-channeled together. [code]
First interface takes commands no problem, keep getting the message that etherchannel cannot be configured across different switches in a stack when i try to put the second interface commands on.
I have a stack of 3750G's where the connection between switch 1 port 1 and switch 2 port 2 are down
Stack Port Status Neighbors Switch# Port 1 Port 2 Port 1 Port 2 -------------------------------------------------------- 1 Down Ok None 3 2 Ok Down 3 None 3 Ok Ok 1 2
I have ruled out the stackwise cable as the problem but would like to know which switch has the problem
At a customer i've tried to add a new 3750 switch til a running stack.I used the following proccess:
1. connect stack cables to the new switch
2. bootup new switch.
Normally the new switch will become a member of the stack, but here, the switch says its the stack master. I can see that the stack port from the old switches connecting the new is up.The only way i could make it work was to provisioning the new switch as switch nr x, save, power off and then connect it and boot it up.The IOS i the same on all switches.
I have configured a portchannel with 3 ports - lacp active mode I want to pxe boot esx server with Hp Proliant DL 360 G7.
During Pxe Boot the physical Interfaces must be in (I) state - standalone.
The server receives via dhcp the ip but after getting the ip the link goes down for a short time and the switchport goes down and then in (w) state - waiting to be aggregated. Now the server tries to load via tftp the image but the server gets a timeout because the switchport is in state (w). It takes a long time til the switchport comes back in standalone mode (I).
Is it possible to modify the time how long the switchport is in the waiting to be aggregated state on 3750x ?
Would the right command be lacp rate-fast? But this command is not available on 3750x, only 6000 series.
I have a Cisco 2921 and a 3750 stack. I want to use both interfaces on the 2921 to connect to the 3750 stack switch 1 and 2. Is this possible using same ip subnet?
I have two 3750 layer3 switches and I need to connect them via stack cable.so if I connect them with the stack they will be act as an one switch, but for the configuration if I create a VLANs on the master switch (applied all the configuration on the master one) this configuration will be transfered to the slave one or I have to repeat the configuration that I did on the master.
I have two Cisco 48 port Catalyst 2960-S series SI. Instead of buying the pricy stack modules can I only use the SFP+cable to connect them as stack? which type of SFP+cable should I buy? do I need any license to use those SFP ports?
Is there a stacking cable that is "bent"?Im using this cable:"CAB-STACK-50CM", "Cisco StackWise 50CM Stacking Cable".But it takes up to much room in the back of the switch, is there such a thing as "bent" stacking cable.
I am trying to implement in the lab. I have 2 switches 3550 and 3750. my questions are:
1. why i can't see vlans in the running config on switch 3750 even after i created 3 vlans?
2. the 3750 is power over ethernet switch and i am trying to connect 3550 and 3750 thru cross over cable trunk link and the ports doesn't show up no light nothing. is it the right way of cabling.
I have two 3750s stacked and one 3750 standalone all in one data closet. The both have the same versions. I want to combine them to make one stack. How do I force the standalone to be the master? sw 1 priority XX(Higher then the existing stack)? Both the stack and the standalone have management addresses. Would it be ok to delete the stack ip address? That way, the standalone(master's address will be the only management address)?How should I connect the standalone 3750 to the stack? At present, the 3750 stack is connected via a cascade cable going from the stack 1 port of the top switch to the stack 2 port of the bottom switch.
The stack cable connected to Switch 1 Port 1 and Switch 4 Port 2 will not come back online. The logs show that there was a Stack line change. I have replaced the 1 meter Stack cable from Switch 1 to Switch 4 three times and it still does not come back online. This is the part that is interesting.. I have disconnected Port 1 Switch 4 and connected it to Port 2 Switch 4 and then Switch 4 came back online. This made me think Port 2 on Switch 4 was working correctly. Then I disconnected Port 2 Switch 1 and connected it to Port 1 Switch 1 and then Switch 1 came back online.
i have two cisco 3750 in stack firts, master switch have all swports busy second have only 5 how can i see cpu utilizations of the second switch, and its reasonable to move somme devices from first switch to second for deacreases of cpu and memory utilisatio ns of the master? the stack tehnologies use both cpu as one? or its only for simple management ?
have a cable i think is bad, is it possiable to switch the cable out without causing any downtime to the switch or connected devices?
HQ-1st-Flr-Stack#show switch stack-ports summary Switch#/ Stack Neighbor Cable Link Link Sync # In Port# Port Length OK Active OK Changes Loopback Status To LinkOK
I just need a little refreshing on upgrading a stack of 3750's. This stack only has 2 switches: [code]
1.) If I remember correctly I simply tftp the IOS to the flash of each switch and then reload the master only? 2.) Can I safely assume these are the 2 flash locations:
i want to remove an access layer 3750 48 POE master switch and replace with a new 3750 switch in the stack. i want to copy the same configuration to new switch since the old switch is having POE issue and I got replacement of the malfunctioned switch. we have VTP domain is configured in the network...
I have been given 2 3750 switches and need to put a config onto it wuld is for 2 3750's in a stack, how should I put this on the 2 switches? Is it bested to install it onto 1 switch first then physically attach the 2nd after?
I'm setting up a web cache using the wccp protocol on a Catalyst 3750 stack.
Probably missing something real simple here but when I from the global configuration mode are trying to enter the ip wccp command it just says "invalid input" from wccp. There is no such command.. should be supported on my device from IOS 12.2(37)
We have two 6k5 configured as vss and it is working fine. For each floor we have a 3750 stack. In each 3750 stack we have 4 switches. From the first 3750 we have a fiber link to the first 6k5 and from the fourth switch we have another fiber link to the other 6k5 switch, for each floor/3750 stack, both configured as etherchannel. We installled each 3750 stack/floor in different maintenance windows; in all these installations we have problems configuring the etherchannel. After we configure the etherchannel on 3750 stack and in the vss, the etherchannel does not go up/up. We see the etherchannel up/down; after a lot off work, try and error, configuring shut/ no shut, adding and excluding links from the etherchannel; in any aleatory moment the etherchannel goes up/up and works fine. Is there any bug related with these IOS versions, or is there any right procedure to configure etherchannel from vss to 3750 stack?
I currently have 5 3750s connected via Stackwise. This stack is connected back to my core (6509s) via fiber (1Gig to Core1 & 1Gig to Core2). I want to move the 5th 3750 to another closet due to an addition of a new patch panel. Due to max length of 10 ft. for stackwise, my plan is to connect this 5th switch back to the stack using trunked fiber ports, with them being an etherchannel (2Gig). Also plan to use single fiber port form 2 different switches in the stack to provide some redundancy for the 5th switch. Should I be alert of any issues with this connection design? Do I need to properly remove the 5th switch from the stack using, no sw 5 provison sw-model or can I just disconnect stackwise and connect back with fiber?
I had 2 3750 stacked and one of them decided to die (power supply) cisco replaced it and now i want to re-add that switch to stack. I have already upgraded my replacement switch to the same IOS version.I was reading that i can do it without powering down operational 3750 so the action plan so far is:
-power down NEW member -connect stacking cable -power up
as you can see my switch 2 is now a master and it still holds config of all Gi ports for switch 1. If i connect my NEW switch without any config (vlan.dat and startup-config) will my existing switch 2 copy all ports config to new switch ?
We had an "Event" on our process network at the mill yesterday. I connected a new WS-C3560V2-48TS-S to our network and we lost communications with all of the other switches.
The core is a stack of 3 WS-C3750 switches, one is a -24TS-1U and the other two are -12S-S. These connect to 10 WS-C3560G-24TS and 5 Rockwell Stratix 8000 (IE3000) over fiber. I am planning on replaceing two 24 port switches with the new 48 port. I had the switch configured and running at my work bench. It was connected to the network with one sfp module and ran all weekend with no issues. Yesterday afternoon I took it to the network cabinet and installed it. I powered it up and connected two sfp modules to the fiber patch panel and made the connection at the core stack.
Everything looked OK. I had communication link lights working on everything. Within minutes, we lost communication with every switch connected to the core stack. I shut down the new 48 port switch and the network slowly came back up.
The new 48 port is configured with Flex Links for the fiber redundancy protocol and was connected to each of the 3750G-12S-S stack members.
I though it might have been a power issue but the stack is UPS protected and shows it has been up for over 10 weeks. I'm not even sure "Crash" is the best decription for what happened. The new switch has a high enough IP address that it would not take over as a IGMP Querier.
I've a situation where I need to add a new 3750x to a existing stack of 3750. [code] When I tried to stack them together, I get a version mismatch error. Is this because of the difference in SW Image? What are my options next ? My ultimate goal is to make the new switch stack correctly with the exisitng switches.
I configured 3750 A switch with vlan 20 and its IP address 192.168.20.41Its default gateway was 192.168.20.3Then i configured 3750 B switch with same default gateway and vlan 20 IP 192.168.20.43My question is now when we stack it becomes single switch and now vlan 20 ip address is 192.168.20.43 thats only IP i can see.So how does stack switch choose vlan 20 IP?Does it choose highest IP address between two switches if they have same vlan 20 as in my case?Also when i go to switch 3750 b by session command and do sh ip route it does not show ip default gateway .Also it shows vlan 20 as admin down .
I am replacing our 2 3750s which are in a stack and are running in VTP server mode for the domain with 2 new 3750Gs. There are 4 trunks to other switches which bare in client mode and 2 trunks to 2 ASAs which are in active/standby mode (one in each switch). Anyway what will happen to the VTP clients when I replace the stack as the revision number will be 1 on the server? The clients will ignore any VTP updates from the server ?