Cisco Switching/Routing :: Etherchannel Does Not Go Up / Up From 3750 Stack To 6k5 Vss
May 19, 2012
We have two 6k5 configured as vss and it is working fine. For each floor we have a 3750 stack. In each 3750 stack we have 4 switches. From the first 3750 we have a fiber link to the first 6k5 and from the fourth switch we have another fiber link to the other 6k5 switch, for each floor/3750 stack, both configured as etherchannel. We installled each 3750 stack/floor in different maintenance windows; in all these installations we have problems configuring the etherchannel. After we configure the etherchannel on 3750 stack and in the vss, the etherchannel does not go up/up. We see the etherchannel up/down; after a lot off work, try and error, configuring shut/ no shut, adding and excluding links from the etherchannel; in any aleatory moment the etherchannel goes up/up and works fine. Is there any bug related with these IOS versions, or is there any right procedure to configure etherchannel from vss to 3750 stack?
3750 stack config (IOS
Cisco IOS Software, C3750 Software (C3750-IPBASEK9-M), Version 12.2(50)SE1, RELEASE SOFTWARE (fc2))
interface GigabitEthernet1/0/1switchport trunk encapsulation dot1qswitchport trunk allowed vlan 100,101,371,372switchport mode trunkchannel-group 1 mode on!interface GigabitEthernet4/0/1switchport trunk encapsulation dot1qswitchport trunk allowed vlan 100,101,371,372switchport mode trunkchannel-group 1 mode on!interface Port-channel1switchport trunk encapsulation dot1qswitchport trunk allowed vlan 100,101,371,372switchport mode trunk
[code]....
View 7 Replies
ADVERTISEMENT
May 22, 2013
We are configuring a new EMC VNX, and plan to use Ether channel with our 3750x stack. We would like to configure it for both additional bandwidth and for redundancy. What is the best configuration to use? Should we trunk the channel or use switch port mode access, and use channel-group on or protocol LACP (which state active or passive)?
View 1 Replies
View Related
Mar 26, 2012
I am wanting to etherchannel from a 3750 stack to core Layer 3 switches (also 3750) with a cable going to each core switch, I have put both core switches and the stack under a 28bit subnet mask, but I dont seem to be load balancing across both links.
View 5 Replies
View Related
Mar 25, 2013
We have a pair of WS-C3750X-24T-S in a stack and four WS-C2960S-48TS-L in a stack of their own. There is not really anything too fancy configured (no special VLAN configuration/trunks or etc.) but the 3750 do have two ports configured as L3 for routing. We are not trying to use those ports for EtherChannel. These devices are running IOS 12.2(55)SE3 Essentially we are attempting to make an EtherChannel group using port 48 on all four of the 2960's in their stack (four ports). On the 3750 we will configure an EtherChannel group using port 23 and 24 on both switches (four ports). We then connect them up to form a four member EtherChannel.The ports on both ends are configured as mode ON and they are all 1Gb ports. I elected mode on because I understand at least one of the EtherChannel protocols will not work cross stack. What I would like to ask is whether the above configuration is possible or are we hitting some sort of limitation of EtherChannel cross stack, etc..? I cannot find anything to suggest this configration is invalid, but thought I would ask to see if I missed something in the EtherChannel articles.
View 3 Replies
View Related
Dec 20, 2012
I have stack of 2 switches 3750?I config etherchannel between them.
here is result
2 Po2(SD) LACP Fa1/0/15(I) Fa2/0/15(I)
Both ports are up up but standalone Int port channel 2 is down down.Need to know if this is default behaviour when we config etherchannel between stack switches?
View 2 Replies
View Related
Jan 28, 2012
According to the following Cisco webpage, cross-stack 10-Gigabit EtherChannel is possible on the 3750 with up to two 10-Gigabit modules, using LACP: url...However, the webpage doesn't confirm if this functionality is restricted to a particular 3750 model, such as 3750E, or if it applies to all models. It also doesn't specify any particular IOS feature set. I've tried Cisco Software Advisor but it doesn't list this feature on either the 3750E or 3750-X. This is possible on the 2960-S switches (i.e. cross-stack 10gig EtherChannel)?
View 23 Replies
View Related
Mar 3, 2013
configuring EtherChannel between 3750-X cross-stack and 6509E switch. I use two ports on 3750s, and two ports on 6509. I just need it as a trunk. For some elusive reason one port on 3750 keeps being err-disabled, and one on 6509 notconnected.
Here is what I did so far.
3750
!
interface GigabitEthernet1/0/22
description ***VSS-RNOC-link***
switchport trunk encapsulation dot1q
switchport trunk allowed vlan 2
[code]....
Problem with :
GigabitEthernet1/0/22 is down, line protocol is down (err-disabled)
GigabitEthernet2/1/29 is down, line protocol is down (notconnect)
I tried shutting them down, then no shutting them again. Didn't work.
View 11 Replies
View Related
Aug 6, 2012
We are trying to configure Etherchannel between four ports of cisco 3750 stack(2ports from one switch of stack and two ports from another switch of same stack). We are facing issues with this setup. The ports in WS-CBS3012 are going to err disable mode.
Is there any limitations associated with such a cross-stack etherchannel configuration. Any particular sequence of configuration involved.
Switch1 in stack
int gi 3/0/3
switchport mo trunk
switchport trunk allowed vlan 10-30
sw tr en dot1q
channel-group 1 mode on
spanning-tree guard root(code )
View 1 Replies
View Related
Jun 5, 2013
i was just asking if it is possible to create a L3 etherchannel between 2 single 3750 switches that act as our core, (running HSRP for the vlan and with a port-channel between the two) and a new switch stack of 3750s that will be routed to and managed by another party. Only i'd like to have the redundancy of 2 links connecting the new stack.If it is possible are there any best practices or preference in using PAgP or LACP or just going for ON.
View 7 Replies
View Related
Oct 23, 2012
I am running out of ports on a 4507R and would like to use a 3750G-24TS stack that I already have to expand capacity. Is it possible to configure EtherChannel between the 4507R and the 3750G stack and if so what is the best way to do it? without LACP, with active-active mode LACP or passive-active mode LACP...
This is what I have in mind:On the 4507R side I would like to use interface GigabitEthernet3/5 and interface GigabitEthernet4/5 where modules 3 and 4 on the 4507R are "6 1000BaseX (GBIC) (WS-X4306-GB)". On the 3750G side I would like to use ports 28 on both switches in the stack which are equipped with Cisco GLC-T= 1000BASE-T SFP transceiver module for Category 5 copper wire with RJ-45 connector. [URL] Cross-Stack EtherChannel Without PAgP or LACP should look like this:
3750switchstackA(config)#interface gigabitethernet 1/0/28
3750switchstackA(config-if)#channel-group 1 mode on
3750switchstackA(config-if)#switchport trunk encapsulation dot1q
3750switchstackA(config-if)#switchport mode trunk
3750switchstackA(config)#interface gigabitethernet 2/0/28
3750switchstackA(config-if)#channel-group 1 mode on
[code]....
is that what I should be doing? is there any benefit to the active-active mode LACP or passive-active mode LACP and which are applicable to the case above?
View 1 Replies
View Related
Feb 17, 2013
seeking for configuration assitance on etherchannel between catalyst 3750 and 6506
View 3 Replies
View Related
Jul 6, 2012
I was configuring link aggregation between a Cisco3750 and Cisco SG200 and the switched network went down just a few minutes after the port channel came on.I rebooted the SG200 and all hosts came back up for a minute before I lost them again. The etherchannel was between two trunking ports. I never set link aggregation on the SG200, could that be the reason? All machines are connected to the SG200. The 3750 is only being used as a layer 3 device for inter vlan traffic.
View 1 Replies
View Related
Jun 20, 2012
We have a new building where we added 3 network closets with 3750x stacks.We have 2 fiber gig ports connected to 2 microwave units and etherchanneled the to ports
We have the same setup at the corporate office except the connection is 2 fiber gig ports on a 6509. The 6509 is doing the routing
Now the problem is that we lost the connection to the management interface on only one of the three closets after a few days running. But some workstations at the corp office could reach it... others could not. The workstation were on the same VLAN. We solved the problem for a few days by shutting on of the fiber ports on the etherchannel. But is started happening again... now with PCs being installed at the new location.
The PC that was not working on the 3750x side could ping across to the 6509 but no further then that. It seems like an arp issue not routing because some devices are reachable and fully operational throughout the network.
Here is the configuration:
3750x:Cisco IOS Software, Version 12.2(55)SE1
Current configuration : 118 bytes!interface Port-channel1switchport trunk encapsulation dot1qswitchport mode trunkno snmp trap link-statusend
!interface GigabitEthernet1/1/1description 2gig to STB-6509switchport trunk
[Code]......
View 19 Replies
View Related
Jun 4, 2013
I'm trying to configure and etherchannel between 2 switches. A 3750 and a 3750G, but the port channel is down: 3750. [code]
View 2 Replies
View Related
Apr 23, 2013
We've installed cisco devices accross our site in the last year or so and slowing getting on top of it now. How ever our old unmanaged kit seems to be out performing it. It's most like down to my misconfiguration which has lead me to here. Below is the details of hardware and configuration between devices. 3750 Core consisting of the following stacked. [code] I've got MRTG monitoring traffic and the throughput seems to max out 24m/s,
View 15 Replies
View Related
Aug 5, 2012
For etherchannel of 2 links on a 3750 switch, if 1 link ever gets saturated, will the other link be used as well if the excess traffic is part of the same flow?Or that excess traffic will simply be dropped?
View 4 Replies
View Related
Nov 23, 2011
As we know there are three layer in cisco Network Model:
-Core
-Distribution
-Access
So my question is in Core / Distribution layer should i use Etherchannel between switches or use Stacking if switches are stackble.For ex: suppose I have two cisco 3750 switches . so should i use etherchannel between them or use stacking in core layer?What are the advantages and disadv of both.
View 5 Replies
View Related
Mar 27, 2012
I have 2 6504's running HSRP as my core. They are each etherchannel'd to my Datacenter switch (3750 Stack) -- see image below.The problem i a having is with the etherchannel status:
Core1 PO11 status w (waiting)
Core2 PO11 status P(bundled)
DC11 PO48 status P -- but only to Core2 - the interfaces to Core1 are suspended. (See attached configuration documents) None of the devices have any information in the logs. I run this same configuration in my central location, but we are running Nexus 7000's. With the 6500's, do I need to split the port channels on the 3750 to allow them to negotiate the etherchannel? If I split the portchannels, are there any concerns? Should I expect to see the etherchannel status as P (Bundled) or H (Hot-Standby)?
View 2 Replies
View Related
Jan 27, 2012
I have a 3750 as core switch, adding 2 stacks of 2960S to connect. I want to establish etherchannel between the 3750 and each additonal 2960S stack, do the channel group numbers between the 3750 and the new 2960s have to match? 3750 has two channel-groups(1 and 2) already configured. Need to know, I would create 2 additional channel groups (number 3,4) for each of the etherchannels between the 3 2960S Stacks and 3750? OR channel-group # is local to the device.
View 5 Replies
View Related
Dec 6, 2011
I have two 3750s stacked and one 3750 standalone all in one data closet. The both have the same versions. I want to combine them to make one stack. How do I force the standalone to be the master? sw 1 priority XX(Higher then the existing stack)? Both the stack and the standalone have management addresses. Would it be ok to delete the stack ip address? That way, the standalone(master's address will be the only management address)?How should I connect the standalone 3750 to the stack? At present, the 3750 stack is connected via a cascade cable going from the stack 1 port of the top switch to the stack 2 port of the bottom switch.
View 19 Replies
View Related
May 19, 2013
I have a stack of 4 3750 Switches.
1. WS-C3750G-12S
2. WS-C3750G-12S
3. WS-C3750X-48P
4. WS-C3750X-48P
The stack cable connected to Switch 1 Port 1 and Switch 4 Port 2 will not come back online. The logs show that there was a Stack line change. I have replaced the 1 meter Stack cable from Switch 1 to Switch 4 three times and it still does not come back online. This is the part that is interesting.. I have disconnected Port 1 Switch 4 and connected it to Port 2 Switch 4 and then Switch 4 came back online. This made me think Port 2 on Switch 4 was working correctly. Then I disconnected Port 2 Switch 1 and connected it to Port 1 Switch 1 and then Switch 1 came back online.
View 1 Replies
View Related
Feb 20, 2013
i have two cisco 3750 in stack firts, master switch have all swports busy second have only 5 how can i see cpu utilizations of the second switch, and its reasonable to move somme devices from first switch to second for deacreases of cpu and memory utilisatio ns of the master? the stack tehnologies use both cpu as one? or its only for simple management ?
View 9 Replies
View Related
Mar 11, 2013
have a cable i think is bad, is it possiable to switch the cable out without causing any downtime to the switch or connected devices?
HQ-1st-Flr-Stack#show switch stack-ports summary
Switch#/ Stack Neighbor Cable Link Link Sync # In
Port# Port Length OK Active OK Changes Loopback
Status To LinkOK
[Code].....
View 15 Replies
View Related
Apr 29, 2012
I just need a little refreshing on upgrading a stack of 3750's. This stack only has 2 switches: [code]
1.) If I remember correctly I simply tftp the IOS to the flash of each switch and then reload the master only?
2.) Can I safely assume these are the 2 flash locations:
View 3 Replies
View Related
Jun 21, 2012
i want to remove an access layer 3750 48 POE master switch and replace with a new 3750 switch in the stack. i want to copy the same configuration to new switch since the old switch is having POE issue and I got replacement of the malfunctioned switch. we have VTP domain is configured in the network...
View 3 Replies
View Related
Mar 15, 2012
I have been given 2 3750 switches and need to put a config onto it wuld is for 2 3750's in a stack, how should I put this on the 2 switches? Is it bested to install it onto 1 switch first then physically attach the 2nd after?
View 3 Replies
View Related
Jul 10, 2012
One of the stack member has failed and we need to replace the same with the new one.
[code],....
View 7 Replies
View Related
Nov 21, 2011
I'm setting up a web cache using the wccp protocol on a Catalyst 3750 stack.
Probably missing something real simple here but when I from the global configuration mode are trying to enter the ip wccp command it just says "invalid input" from wccp. There is no such command.. should be supported on my device from IOS 12.2(37)
View 1 Replies
View Related
Mar 5, 2012
I currently have 5 3750s connected via Stackwise. This stack is connected back to my core (6509s) via fiber (1Gig to Core1 & 1Gig to Core2). I want to move the 5th 3750 to another closet due to an addition of a new patch panel. Due to max length of 10 ft. for stackwise, my plan is to connect this 5th switch back to the stack using trunked fiber ports, with them being an etherchannel (2Gig). Also plan to use single fiber port form 2 different switches in the stack to provide some redundancy for the 5th switch. Should I be alert of any issues with this connection design? Do I need to properly remove the 5th switch from the stack using, no sw 5 provison sw-model or can I just disconnect stackwise and connect back with fiber?
View 2 Replies
View Related
May 29, 2012
I had 2 3750 stacked and one of them decided to die (power supply) cisco replaced it and now i want to re-add that switch to stack. I have already upgraded my replacement switch to the same IOS version.I was reading that i can do it without powering down operational 3750 so the action plan so far is:
-power down NEW member
-connect stacking cable
-power up
as you can see my switch 2 is now a master and it still holds config of all Gi ports for switch 1. If i connect my NEW switch without any config (vlan.dat and startup-config) will my existing switch 2 copy all ports config to new switch ?
View 4 Replies
View Related
Oct 22, 2012
We had an "Event" on our process network at the mill yesterday. I connected a new WS-C3560V2-48TS-S to our network and we lost communications with all of the other switches.
The core is a stack of 3 WS-C3750 switches, one is a -24TS-1U and the other two are -12S-S. These connect to 10 WS-C3560G-24TS and 5 Rockwell Stratix 8000 (IE3000) over fiber. I am planning on replaceing two 24 port switches with the new 48 port. I had the switch configured and running at my work bench. It was connected to the network with one sfp module and ran all weekend with no issues. Yesterday afternoon I took it to the network cabinet and installed it. I powered it up and connected two sfp modules to the fiber patch panel and made the connection at the core stack.
Everything looked OK. I had communication link lights working on everything. Within minutes, we lost communication with every switch connected to the core stack. I shut down the new 48 port switch and the network slowly came back up.
The new 48 port is configured with Flex Links for the fiber redundancy protocol and was connected to each of the 3750G-12S-S stack members.
I though it might have been a power issue but the stack is UPS protected and shows it has been up for over 10 weeks. I'm not even sure "Crash" is the best decription for what happened. The new switch has a high enough IP address that it would not take over as a IGMP Querier.
View 1 Replies
View Related
Jul 17, 2012
Any one try to form a stack with mixed 3750-X and 3750G? Is there any prerequisites in hardware and software?
View 5 Replies
View Related
Aug 2, 2012
I've a situation where I need to add a new 3750x to a existing stack of 3750. [code] When I tried to stack them together, I get a version mismatch error. Is this because of the difference in SW Image? What are my options next ? My ultimate goal is to make the new switch stack correctly with the exisitng switches.
View 11 Replies
View Related