Cisco Switching/Routing :: Configuring EtherChannel Between 3750-X Cross-stack And 6509E Switch?

Mar 3, 2013

configuring EtherChannel between 3750-X cross-stack and 6509E switch. I use two ports on 3750s, and two ports on 6509. I just need it as a trunk. For some elusive reason one port on 3750 keeps being err-disabled, and one on 6509 notconnected.
 
Here is what I did so far.
 
3750
!
interface GigabitEthernet1/0/22
description ***VSS-RNOC-link***
switchport trunk encapsulation dot1q
switchport trunk allowed vlan 2

[code]....
 
Problem with :

GigabitEthernet1/0/22 is down, line protocol is down (err-disabled)
GigabitEthernet2/1/29 is down, line protocol is down (notconnect)
 
I tried shutting them down, then no shutting them again. Didn't work.

View 11 Replies


ADVERTISEMENT

Cisco Switching/Routing :: 3750 - EtherChannel Cross-Stack With EMC VNX

May 22, 2013

We are configuring a new EMC VNX, and plan to use Ether channel with our 3750x stack.  We would like to configure it for both additional bandwidth and for redundancy.  What is the best configuration to use?  Should we trunk the channel or use switch port mode access, and use channel-group on or protocol LACP (which state active or passive)?

View 1 Replies View Related

Cisco Switching/Routing :: Cross Stack EtherChannel From 3750 To 2960

Mar 25, 2013

We have a pair of WS-C3750X-24T-S in a stack and four WS-C2960S-48TS-L in a stack of their own. There is not really anything too fancy configured (no special VLAN configuration/trunks or etc.) but the 3750 do have two ports configured as L3 for routing. We are not trying to use those ports for EtherChannel. These devices are running IOS 12.2(55)SE3 Essentially we are attempting to make an EtherChannel group using port 48 on all four of the 2960's in their stack (four ports). On the 3750 we will configure an EtherChannel group using port 23 and 24 on both switches (four ports). We then connect them up to form a four member EtherChannel.The ports on both ends are configured as mode ON and they are all 1Gb ports. I elected mode on because I understand at least one of the EtherChannel protocols will not work cross stack. What I would like to ask is whether the above configuration is possible or are we hitting some sort of limitation of EtherChannel cross stack, etc..? I cannot find anything to suggest this configration is invalid, but thought I would ask to see if I missed something in the EtherChannel articles.

View 3 Replies View Related

Cisco Switching/Routing :: Cross-Stack 10-Gigabit EtherChannel On 3750E / 3750-X

Jan 28, 2012

According to the following Cisco webpage, cross-stack 10-Gigabit EtherChannel is possible on the 3750 with up to two 10-Gigabit modules, using LACP: url...However, the webpage doesn't confirm if this functionality is restricted to a particular 3750 model, such as 3750E, or if it applies to all models. It also doesn't specify any particular IOS feature set. I've tried Cisco Software Advisor but it doesn't list this feature on either the 3750E or 3750-X. This is possible on the 2960-S switches (i.e. cross-stack 10gig EtherChannel)?

View 23 Replies View Related

Cisco Switching/Routing :: EtherChannel Cross-Stack Between 3750g And 4507R?

Oct 23, 2012

I am running out of ports on a 4507R and would like to use a 3750G-24TS stack that I already have to expand capacity. Is it possible to configure EtherChannel between the 4507R and the 3750G stack and if so what is the best way to do it? without LACP, with active-active mode LACP or passive-active mode LACP...
 
This is what I have in mind:On the 4507R side I would like to use interface GigabitEthernet3/5 and interface GigabitEthernet4/5 where modules 3 and 4 on the 4507R are "6 1000BaseX (GBIC) (WS-X4306-GB)". On the 3750G side I would like to use ports 28 on both switches in the stack which are equipped with Cisco GLC-T= 1000BASE-T SFP transceiver module for Category 5 copper wire with RJ-45 connector. [URL] Cross-Stack EtherChannel Without PAgP or LACP should look like this:
 
3750switchstackA(config)#interface gigabitethernet 1/0/28
3750switchstackA(config-if)#channel-group 1 mode on
3750switchstackA(config-if)#switchport trunk encapsulation dot1q
3750switchstackA(config-if)#switchport mode trunk
3750switchstackA(config)#interface gigabitethernet 2/0/28
3750switchstackA(config-if)#channel-group 1 mode on

[code]....

is that what I should be doing? is there any benefit to the active-active mode LACP or passive-active mode LACP and which are applicable to the case above?

View 1 Replies View Related

Cisco Switching/Routing :: 3750 / Stack Switch With Etherchannel Configuration

Dec 20, 2012

I have stack of 2 switches 3750?I config etherchannel between them.
 
here is result
 
2      Po2(SD)         LACP      Fa1/0/15(I) Fa2/0/15(I)
 
Both ports are up up but standalone Int port channel 2 is down down.Need to know if this is default behaviour when we config etherchannel between stack switches?

View 2 Replies View Related

Cisco Switching/Routing :: 3750 - Cross-stack Ether Channel 20Gb And STP

Feb 22, 2012

i want to realize a 20gb ring stp with 6  3750x stacked by 2. I want to install 2 3750x stacked configured in hsrp mode with other 2 3750 stacked. These 2 different stack are interconnected by a cross-stack ether channel 20Gb  fiber. On the other side of the room i want to create a new stack with 2 3750x with cross-stack ether channel 20gb connected with the previous 2 stacks. So, in total 3 different cross-stack ether channel 20Gb stacks interconnected creating a ring stp of 20 Gb.

View 4 Replies View Related

Cisco Switching/Routing :: Etherchannel Does Not Go Up / Up From 3750 Stack To 6k5 Vss

May 19, 2012

We have two 6k5 configured as vss and it is working fine. For each floor we have a 3750 stack. In each 3750 stack we have 4 switches. From the first 3750 we have a fiber link to the first 6k5 and from the fourth switch we have another fiber link to the other 6k5 switch, for each floor/3750 stack, both configured as etherchannel. We installled each 3750 stack/floor in different maintenance windows; in all these installations we have problems configuring the etherchannel. After we configure the etherchannel on 3750 stack and in the vss, the etherchannel does not go up/up. We see the etherchannel up/down; after a lot off work, try and error, configuring shut/ no shut, adding and excluding links from the etherchannel; in any aleatory moment the etherchannel goes up/up and works fine. Is there any bug related with these IOS versions, or is there any right procedure to configure etherchannel from vss to 3750 stack?

3750 stack config (IOS
Cisco IOS Software, C3750 Software (C3750-IPBASEK9-M), Version 12.2(50)SE1, RELEASE SOFTWARE (fc2))
interface GigabitEthernet1/0/1switchport trunk encapsulation dot1qswitchport trunk allowed vlan 100,101,371,372switchport mode trunkchannel-group 1 mode on!interface GigabitEthernet4/0/1switchport trunk encapsulation dot1qswitchport trunk allowed vlan 100,101,371,372switchport mode trunkchannel-group 1 mode on!interface Port-channel1switchport trunk encapsulation dot1qswitchport trunk allowed vlan 100,101,371,372switchport mode trunk

[code]....

View 7 Replies View Related

Cisco Switching/Routing :: 3750 - Etherchannel Across 2 L3 Switches To Stack

Mar 26, 2012

I am wanting to etherchannel from a 3750 stack to core Layer 3 switches (also 3750) with a cable going to each core switch, I have put both core switches and the stack under a 28bit subnet mask, but I dont seem to be load balancing across both links.

View 5 Replies View Related

Cisco Switching/Routing :: Etherchannel - Redundant 6500 To 3750 Datacenter Switch?

Mar 27, 2012

I have 2 6504's running HSRP as my core.  They are each etherchannel'd to my Datacenter switch (3750 Stack) -- see image below.The problem i a having is with the etherchannel status:

Core1 PO11 status w (waiting)
Core2 PO11 status P(bundled)

DC11 PO48 status P -- but only to Core2 - the interfaces to Core1 are suspended. (See attached configuration documents)  None of the devices have any information in the logs.  I run this same configuration in my central location, but we are running Nexus 7000's.  With the 6500's, do I need to split the port channels on the 3750 to allow them to negotiate the etherchannel? If I split the portchannels, are there any concerns? Should I expect to see the etherchannel status as P (Bundled) or H (Hot-Standby)?

View 2 Replies View Related

Cisco Switching/Routing :: 3750 / Add A New Switch In Stack?

Jun 21, 2012

i want to remove an access layer 3750 48 POE master switch and replace with a  new 3750 switch in the stack. i want to copy the same configuration to new switch since the old switch is having POE issue and I got replacement of the malfunctioned switch. we have VTP domain is configured in the network...

View 3 Replies View Related

Cisco Switching/Routing :: Stack Behaviour Of 3750 Switch

Nov 17, 2012

I configured 3750 A  switch with vlan 20 and its IP address 192.168.20.41Its default gateway was 192.168.20.3Then i configured 3750 B  switch with same default gateway and vlan 20 IP   192.168.20.43My question is now when we stack it becomes single switch and now vlan 20 ip address is 192.168.20.43 thats only IP i can see.So how does stack switch choose vlan 20 IP?Does it choose highest IP address between two switches if they have same vlan 20 as in my case?Also when i go to switch 3750 b by session command and do sh ip route  it does not show ip default gateway .Also it shows vlan 20 as admin down .

View 5 Replies View Related

Cisco Switching/Routing :: 3750-X - How To Shutdown Only Switch In Stack

Aug 11, 2011

I have a doubt. In my environment I have two Switch 3750-X in stack.

My question is: How to shutdown remotely only a switch in stack?

View 23 Replies View Related

Cisco Switching/Routing :: 3750 - Removing Switch From Stack Of Three

Oct 30, 2011

We have a stack of 3 cisco swithes 3750s WS-C3750G-24TS 12.2(25)SEB4 .We plan to recover a switch from the stack as it is not needed any more The switch we plan to recover is the existing Master.If we change the priority (switch 1 priority) and make another switch the master using command line will we have any loss of connectivity to the servers conecting to the stack ?

View 1 Replies View Related

Cisco Switching/Routing :: 3750 - Adding New Switch To Stack With Different IOS

Sep 12, 2012

We have a WS-C3750G-24PS switch running 12.2(50)SE , C3750-IPBASEK9-M in production & stand alone and we want to ask a new Cisco WS-C3750-24P running 12.2(55)SE3 , C3750-IPBASEK9-M into the stack with the 1st one.
 
Just want to know if it is possible and are there any problems with the IOS being different version.

View 8 Replies View Related

Cisco Switching/Routing :: 3750 Switch Stack-port Changes

Feb 7, 2011

I have a stack with a lot of stack-port changes, but on all the ports, how can I determine the faulty switch in the stack, cables are already verified. We did also a restart of the whole stack power off/on
 
running version
 
WS-C3750-48P       12.2(55)SE            C3750-IPBASEK9-M
 
This is the output after 6weeks
 
Switch#/  Stack   Neighbor   Cable    Link   Link   Sync      #         In  Port#     Port              Length    OK   Active   OK    Changes   Loopback          Status                                          To LinkOK          --------  ------  --------  --------  ----  ------  ----  ---------  --------  1/1     OK         4      1

[Code].....

View 7 Replies View Related

Cisco Switching/Routing :: 3750 Switch Stack Partition

Jan 6, 2013

In the current set up I have a LAN stack of 5 3750 switches configured as an access stack. As per the requirement I need to partition the current 5 switch stack into two individual stacks of 3 & 2 switches respectively. Kindly let me know the step by step process withh all the necessary commands, reloads and reconnections. I purpose to do it by changing the priority of current member switch to 15 so that its elected as Master in the new partitioned switch stack. But not sure what all steps required and in which order.

View 1 Replies View Related

Cisco Switching/Routing :: Switch 3750 Of Stack Rebooted With No Reason

Oct 2, 2012

One switch of our stack of 8 3750 have reboot with no reason. Nobody was in the room server when it appears et there was'nt any electrical problem at this moment.

View 4 Replies View Related

Cisco Switching/Routing :: 3750 - Switch Stack Reboots Every 24 Hours

Nov 12, 2011

I have four-switch Cat 3750 stack that has been working reliably for a couple years. Suddenly the other morning it reboots itself, and has been doing so every 24 hours since. take a look at the attached log? This should really be a Smartnet thing, but as it turns out the warranty we have on this is not Smartnet .

View 6 Replies View Related

Cisco Switching/Routing :: High Memory And CPU With 3750 Stack Switch?

Dec 26, 2012

We are having 3750 Stack switch as our edge switch. Here we are having some issues as low memory & itermediate High CPU utilization.For memory when we checked its shwoing maximum memory is allocated to DHCPD receive & ARP Input as follows
 
Processor Pool Total:   70829380 Used:   56809532 Free:   14019848
      I/O Pool Total:   12582912 Used:    8554920 Free:    4027992
Driver te Pool Total:    1048576 Used:         40 Free:    1048536

[code].....

i want to understand why this 2 proceses (DHCPD & ARP input) taking more memory?High CPU: We also facing intermediate high CPU utilization (above 95%). When CPU is high there were 2 processes consuming more CPU are 'Spanning Tree' (about 20%) & ARP Input (about 66%). we also checked the ARP entries, there were 1500 ARP entries & 2 incomplete ARP (out of 6000 ARP supported)

View 6 Replies View Related

Cisco Switching/Routing :: 3750 Connect Stack Cables To New Switch

Dec 11, 2011

At a customer i've tried to add a new 3750 switch til a running stack.I used the following proccess:
 
1. connect stack cables to the new switch

2. bootup new switch.
 
Normally the new switch will become a member of the stack, but here, the switch says its the stack master. I can see that the stack port from the old switches connecting the new is up.The only way i could make it work was to provisioning the new switch as switch nr x, save, power off and then connect it and boot it up.The IOS i the same on all switches.

View 2 Replies View Related

Cisco Switching/Routing :: Adding A New Switch In Existing Two 3750 Stack

Mar 25, 2012

in our network we were using three 3750-48-s switches with stacking one of the switch due to some hardware failure power problem,
 
now i want to add a new switch 3750-48-s in the existing Stack two switches , the old two switches ios version is = 12.2(25r)SEC the new Catalyst 3750 io verion is =   12.2(35)SE5
 
how to add this switch in the existing two stack switches , with documentation

View 1 Replies View Related

Cisco Switching/Routing :: How To Configure GLBP On 3750 Stack Switch

Nov 30, 2011

I have WS-C3750-48PS-S, i wanted to implement GLBP on this switch, Is it possible to configure GLBP on this switch?
 
IOS :                    c3750-ipservicesk9-mz.122-55.SE4.bin
Part number:     WS-C3750-48PS-S

[Code].....

View 4 Replies View Related

Cisco Switching/Routing :: Stack L3 With L2 3750 Without Upgrading L2 Switch IOS To IP Services

Nov 20, 2012

is there a document that explains the compatibility of 3750 series that can be stacked together? for example can we stack 3750-x with 3750-v2 without the power sharing? Can we stack a L3 3750 with L2 3750 without upgrading the L2 switch IOS to ip services?

View 8 Replies View Related

Cisco Switching/Routing :: Removing Provisioned Switch - Cat 3750 Stack

Oct 27, 2012

We have a live stack with 4 Cat 3750 switches of mixed varieties.  Switch 1 crashed the other day and didn't come back up.  A power reset brought the switch online again, and switch 2 is now running as the stack master.  We are going to replace switch 1 in a staged approach to minimise client downtime.  Switch 1 is a ws-c3750-48ts and we will be replacing it with a ws-c3750g-48ts.  I will be pre-provisioning and installing the new switch into the stack as switch 5 and configuing the ports to be the same as switch 1.  The cables will then be moved over from switch 1 to switch 5 so the changeover time should be minimal.  When all cutover, I'll power down switch 1, reconfigure the stack cables and remove switch 1 from the stack.
 
My question is to what occurs next.  If I perform a 'no switch 1 provision ws-c3750-48ts' will I be left with switch 2 through to 5 (ie no switch 1)?  I can live with this moving forward.  I know I can renumber switch 5 to be switch 1 if I want, but my understanding is that I have to reload the member switch which is something I'd like to avoid at this stage.  In my reading, I saw the statement - "Note: You cannot use the switch current-stack-member-number renumber new-stack-member-number global configuration command on a provisioned switch. If you do, the command is rejected."  I'm a bit confused by this statement, I'm assuming that it is saying that if I do as above but don't issue the 'no switch 1 provision' command, I cannot renumber switch 5 to switch 1 but as long as I use the 'no switch 1 provision' command first, I can renumber switch 5 to switch 1?  Will all of my switch 5 port configuration information and any associated references (eg port-channel configuration etc) be changed from gi5/0/x to gi1/0/x if I do renumber?

View 1 Replies View Related

Cisco Switching/Routing :: Adding 3750 Switch To Existing Stack?

Nov 23, 2011

I am looking to add a new 3750 Switcch to an existing stack shown below
 
Switch   Ports Model             SW Version             SW Image
------   ----- -----             ----------             ----------
*   1   26     WS-C3750-24P       12.2(35)SE5             C3750-IPBASE-M
     2   26     WS-C3750-24P       12.2(35)SE5             C3750-IPBASE-M
     3   26     WS-C3750-24P       12.2(35)SE5             C3750-IPBASE-M

[code]....
 
I have looked on notes to add a switch to an existing stack and haven’t identified answers on how the IOS will be affected on the new switch – will it downgrade to the current stack version or will the current stack upgrade to its version. At this moment in time I would prefer if the new switch IOS downgraded to the current stack IOS version.The new switch is a 3750V2 – will this affect how it joins the stack?The new switch has the image of IPBASEK9-M – again will this affect how it joins the stack?

View 5 Replies View Related

Cisco Switching/Routing :: 3750 - Can Take (4) Ports From Each Switch In Stack And LACP Together

Jun 5, 2012

I have a Cisco 3750G-48PS Running IOS 12.2(40) and was wondering how many physical ports are supported in an LACP Configuration.  Is it 4 or 8 ports in a single switch.
 
If I have a dual 3750 stacked together,  and I want to configure (8) port LACP, Can I take (4) ports from each switch in the stack and LACP together.

View 4 Replies View Related

Cisco Switching/Routing :: Proper Cabling For 2 3750-x Switch Stack

Mar 26, 2012

I have been looking at the Cisco Hardware docs and I can't find anything on the proper way to setup a 2 switch stack for Stackwise redundancy and Stackpower redundancy. Everything details 3 or more switches.

View 2 Replies View Related

Cisco Switching/Routing :: 3750 - Power Stack Switch Out Of Order

Jan 16, 2012

I have 4 switches in a 3750-X stack.Here is the output from the stack why are the switches out of order and I'm not able to bring up switch 1 port 1.

switch 4 port 2 shows not connect it is I've checked the cables.
 
Power stack name: Powerstack-4
    Stack mode: Power sharing
    Switch 1:
        Power budget: 695
        Low port priority value: 22
        High port priority value: 13
        Switch priority value: 4
        Port 1 status: Shut
        Port 2 status: Connected
        Neighbor on port 1: 0000.0000.0000
        Neighbor on port 2: c471.fe84.e100
 
    Switch 2:
        Power budget: 713
        Low port priority value: 21
        High port priority value: 12
        Switch priority value: 3
        Port 1 status: Connected
        Port 2 status: Connected
        Neighbor on port 1: c471.fe85.3000
        Neighbor on port 2: c471.fe80.2800
 
    Switch 4:
        Power budget: 697
        Low port priority value: 19
        High port priority value: 10
        Switch priority value: 1
        Port 1 status: Connected
        Port 2 status: Not connected
        Neighbor on port 1: c471.fe80.2800
        Neighbor on port 2: 0000.0000.0000
 
    Switch 3:
        Power budget: 710
        Low port priority value: 20
        High port priority value: 11
        Switch priority value: 2
        Port 1 status: Connected
        Port 2 status: Connected
        Neighbor on port 1: c471.fe84.e100
        Neighbor on port 2: c471.fe7f.eb00s

View 2 Replies View Related

Cisco Switching/Routing :: How To Change Master Switch In 3750 Stack

Oct 18, 2012

We have 2 3750 24 port fiber switches in a stack and we would like to change the member to become the master. Both are running the same IOS and they are alive on the network. I read that you can change the who becomes the master by setting the priority number higher on the member, which we did. However this requires a reboot of the member to take effect. Is there a way to force this without having to reboot? One other note, both switches in stack have a single gig connection that goes to the core (6500). One gig link is blocked due to spanning-tree and this is on the member that we want to become the master.

View 3 Replies View Related

Cisco Switching/Routing :: 3750 / Reload Member Switch In Stack?

Apr 5, 2012

I have just upgraded 2 3750 switches in a stack via the master and reloaded the master switch remotely, how can I reload the 2nd (member) switch?

View 16 Replies View Related

Cisco Switching/Routing :: Adding Switch To Existing Stack 3750

Oct 16, 2012

I am attempting to add and Catalyst 3750 - 12 port Gigabit switch to an existing stack of 3750 48 port switches (non-X fabric). I am not sure how to proceed. These are the two questions/thoughts I have. Any additional perspective I should have before proceeding.

What kind of configuration should I apply to the Gig switch before adding it to the stack?I am sure I will need to assign priority to the new switch, ideally, it will act as master.

View 1 Replies View Related

Cisco Switching/Routing :: VACL Implemented To All Switch 3750 Stack

Dec 8, 2011

I have used stack wise 3750 for a long time. Now,I have a new stack of 3750. Both of them are trunking together. If I have a VACL running in the old stack, do I need also implement in the new one.

View 1 Replies View Related







Copyrights 2005-15 www.BigResource.com, All rights reserved