Apr 23, 2007Any one who knows where I can find a documentation where it says the maximum switches per stack for the Catalyst 2960 family?
View 2 RepliesAny one who knows where I can find a documentation where it says the maximum switches per stack for the Catalyst 2960 family?
View 2 RepliesHow would I go about stacking 4 Cisco Catalyst 2960-48PST-L switches? The one switch needs to accept a fiber connection from a distribution switch. Do I have to buy flexstack module and cables? If so where does the module go on the switch? If this switch cannot do this set up, any other switch I should look at.
View 6 Replies View RelatedI have an existing stack of 4 x 2960-S switches connected by stack cables.I would like to add another 2960-S switch to the stack but am unable to as the 2960-S will only allow 4 x 2960-S switches per stack.how I would add the 5th 2960-S switch to the existing stack of 4 x 2960-S switches.
View 12 Replies View RelatedOn first floor, I have two stack switches and each stack has got 4 switches. they all are working fine.Now the client would like to add one more stack on the 2nd floor. But the second floor switches are different when compared to the 1st floor switches.
can you have differnt IOS among different stacks. I knew in a stack we need all the switches should have same IOS version. But in between two stacks to communicate do we need same IOS or they can be on differnet IOS?
1st floor switches have 15.0 version and 2nd floor new switches has 12.2.58. Is this ok ?
1st floor switches are 3500 series ( Note: only one one Vlan 20 we are using on the both stack switches and we would like add same Vlan 20 on to the new stack)
2nd floor switches aew 2 catalyst 2960 switches.
Note: on the second floor switches one is 24 port switch and the other one is 48 port switch. so can i make them as a stack?
We have already done cabling from 1st floor to second floor. So no problem with that at all.
I have two Cisco 48 port Catalyst 2960-S series SI. Instead of buying the pricy stack modules can I only use the SFP+cable to connect them as stack? which type of SFP+cable should I buy? do I need any license to use those SFP ports?
View 9 Replies View RelatedI have a customer with Cisco 7940 and 7960 IP phones that they do not plan to replace. They do want a new LAN and are looking at the Catalyst WS-C2960S-48FPD-L and WS-C2960S-24PD-L as access layer devices.
these switches support the Cisco pre-standard PoE required by the 7940 and 7960 IP phones.
I configure 3750 stack switch as core and 2960 stack switches as access layer switches.I connected my laptop to one of my core stack in VLAN 10 and I am pinging to one of my server in VLAN 1. What will be the minimum latency at the time of inter VALN routing
View 2 Replies View RelatedI have a question for Cisco Cat.2960-s Flex Stack switches which are installing on our sties. Two of 2960-s Stack switches as access switch and two of Cisco ME 3600X Series as distribution layer switches are to be installed in our sites. In case of two stack switches, One is will be a Master and the other one will be a member logically, as you know. So, if the master fails, the other one automatically becomes the stack master following a well-documented election process.
Now, it is my question. How long takes to be a stack master from a member switch ? I cant find it on white paper of Cat.2960-s flex stack .
And also, I heard that sometimes a member switches don't election process when the master fails as a result, all stack members become
a panic. Is that really right ? In addition, I heard that the stack switches have many troubleshooting points than stand alone switches.
I really wanna know if the stack switches are good solution for resilience of huge network site. I'm waiting an answer from those who have experience of maintenance or installation.
On a low-end switch like a 2960 the maximum VLANs is 255, as shown in the output of VTP status:
Maximum VLANs supported locally : 255
Number of existing VLANs : 245
When the VTP mode is changed to transparent, VLANs from the extended range can be added without increasing the number of existing VLANs - e.g. if I create VLANs 3000 - 4000 the number of existing VLANs is still listed as 245.
If MST is used to cut down on the number of spanning-tree instances - and assuming propagation of VLAN configuration via VTP is not required - is there any downside to using transparent-mode VTP to increase the number of available VLANs? It does feel like I'm cheating the maximum listed in the datasheet.
I am relocating UPS units and will need to buy longer power cables to extend from our 4506 and 4510 to the new location.I think I am looking at 15 to 20 feet but I am going to confirm. Is it okay to use longer cables?
View 9 Replies View RelatedThis is probably a dumb question, but I have read the 2960 stack administration guide and it does not explain how to configure the stack IP address. It says several times that the stack can be managed from the stack IP address, and that the stack IP address is a system-level configuration item. But it never explains how to configure the stack IP address.
View 3 Replies View RelatedWe have a 2960 stack of 4 WS-C2960S-24PS-L switches.Sometimes, at random, the stack crashes and reboots. I have downloaded the crashinfo file and can see the following error.
View 7 Replies View Relatedif I read the Datasheet of Catalyst 3750X-Series-Switches it is possible to connect a new X-Switch to an existing and old Catalyst 3750-Series Stack.What kind of requirements are needed? Only same IOS-Version in the hole Stack and if possible same Feature-Set? .... like in a normal NOT mixed Stack?
View 4 Replies View RelatedI have a new problem with Catalyst 2960S. We have four switch in a stack and now I get the message:
“%PLATFORM_RPC-3-MSG_THROTTLED: RPC Msg Dropped by throttle mechanism: type 37, class 14, max_msg 32, total throttled 73968 (hostname1-2)”
Traceback= 13A686C 160862C 160E0B4 15E2088 184FD48 18467B8
sh switch de
Switch/Stack Mac Address : 68bd.abc9.0000
H/W Current
[Code]....
I have stack of 2960 S switches.I can console only from Master not from memember switches is this default behaviour?
View 1 Replies View RelatedWe have a pair of WS-C3750X-24T-S in a stack and four WS-C2960S-48TS-L in a stack of their own. There is not really anything too fancy configured (no special VLAN configuration/trunks or etc.) but the 3750 do have two ports configured as L3 for routing. We are not trying to use those ports for EtherChannel. These devices are running IOS 12.2(55)SE3 Essentially we are attempting to make an EtherChannel group using port 48 on all four of the 2960's in their stack (four ports). On the 3750 we will configure an EtherChannel group using port 23 and 24 on both switches (four ports). We then connect them up to form a four member EtherChannel.The ports on both ends are configured as mode ON and they are all 1Gb ports. I elected mode on because I understand at least one of the EtherChannel protocols will not work cross stack. What I would like to ask is whether the above configuration is possible or are we hitting some sort of limitation of EtherChannel cross stack, etc..? I cannot find anything to suggest this configration is invalid, but thought I would ask to see if I missed something in the EtherChannel articles.
View 3 Replies View RelatedI have Cisco Catalyst Stack structure that consist of;
3750E-48TD-S (MASTER) (UNIVERSAL Image)
3750G-48TS-S (IPBASE Image)
3750G-48TS-S (IPBASE Image)
3750G-48TS-S (IPBASE Image)
I want to upgrade their IOSs to k9 images.
I can not dowload Universal Image file from Cisco website because of the expired service contract. I have IPBASE IOS files for all switches,
Can it be a problem to upgrade master switch IOS from Universal to IPBASE image?
I want to run rolling-stack upgrades on several stacks containing Catalyst 3750X-switches. I have done as follows: Configured the redundant uplinks as active and stand-by.Started to upgrade by using archive download-sw /rolling-stack-upgrade /overwrite /reload The upgrade starts as expected BUT switch number 2 in the stack is reloaded BEFORE switch 1 is finnished, the result is of course downtime for the stack. The documentation says something about the command "boot time", but what is this command doing? The default seems to be 7 minutes, it this parameter the time the upgrade-process waits before booting the next switch in the stack? I would expect that switch number 2 is reloaded when switch 1 is up again after reload, and not after an absolute number of minutes, is the rolling-stack-upgrade not working this way ?
View 4 Replies View RelatedI have 8 switch stack consisting of six WS-C3550-48P and two WS-C3750G-16TD running software vesrion 12.2(25) SEB1. When I added new C3750v2-24PS (running image 12.2(50) SE5) in stack so I up-graded the image of existing 8 switches with latest veriosn 12.2(50) SE5. Once I have done with the upgrade then all ports of my stack switches went down after around five minuts. Is it image compatibility issue with existing switches or something else?
View 7 Replies View RelatedI know the Catalyst 3030 is EOL/EOS and I am probably SOL.
Cisco IOS Software, CBS30X0 Software (CBS30X0-LANBASE-M), Version 12.2(25)SEE2, RELEASE SOFTWARE (fc1)
Copyright (c) 1986-2006 by Cisco Systems, Inc.
Compiled Fri 28-Jul-06 11:05 by yenanh
Image text-base: 0x00003000, data-base: 0x00AB4EB8
[code]....
I would like to put the below into the "stack trace" tool, but all links appear to be dead.
%PLATFORM-1-CRASHED: Program Exception (0x0700)!
%PLATFORM-1-CRASHED: SRR0 = 0xFEA10EC0 SRR1 = 0x00029210 SRR2 = 0x0043CD70 SRR3 = 0x00021200
%PLATFORM-1-CRASHED: ESR = 0x08000000 DEAR = 0x00000000 TSR = 0x8C000000 DBSR = 0x00000000
%PLATFORM-1-CRASHED:
[code]....
below is the current config of link that is already up. I need to add another fiber redundant link between 6509 and 2960 stack. How to work on config Spanning side by not taking 6509 down after the change. 6509 is in distribution.
---------------X-ALPHA-IDF-1FORMS-2960S-0# (SIDE)
!interface GigabitEthernet1/0/52description X-ALPHA-F-6509-0 uplinkswitchport trunk native vlan 18switchport mode trunksrr-queue bandwidth share 1 50 30 19priority-queue out mls qos trust dscpmacro description cisco-routerauto qos trust spanning-tree portfast disablespanning-tree guard loopip dhcp snooping trust!
-----------------X-ALPHA-F-6509-0# (SIDE)
!interface GigabitEthernet3/10description 1st floor POC2 Forms IDFswitchportswitchport trunk encapsulation dot1qswitchport trunk native vlan 18switchport mode trunkno ip addressmls qos trust dscpspanning-tree guard loop!
The Catalyst 3750 switch reboots, and the " Reloading because of stack merge or communication failure" error message appears.
I saw this issue at "Cisco wiki" but the resolution in that page is just "Open a case with TAC". Because of the reasion is H/W Problem.
Is The resolution only one ? anything else? The 3750 does not use Stack.It is just stand alone. So i think it has other resolution as "disabling Stack" or another one. How about my opinion ? Is the Resolution only "Open a Case with TAC"
I'm having trouble setting up SSH on my new Switch.
no aaa new-model
aaa authentication login default local
ip domain-name king.local
[Code].....
I would like to be able to use Vlan 10 192.168.155.1 for SSH remote management.
I have Catalyst 2960 S (WS-C2960S-48FPS-L) Switch. I have plugged in SFP module but still interface is down and line protocol down. Is there any configuration to enable SFP module and make the interface up?
This port is connected to nexus 5 k.
i try to implement layer 2 qos in 2960. when i complete to configure the switch, i want to test the qos.PC1 conect to switch port 1,PC2 conect to switch port 2 . PC1 is source teminal. i use skydata.exe and FTP for the test.
when use the skydata ,the PC2 speed can reach 10mbps.when use the FTP , the PC2 only can reach 1.2mbps. why?
I can use Putty to SSH into my new switch (Directly connected to my laptop with ethernet cable), but I cant log into my switch.
Sent username "admin"
admin@192.168.251.1's password:
Access denied
It doesnt like my password, but I have only set 1 password (king) on this switch. I've configured 3 other switches with SSH and had no problem. Been trouble shooting for awhile and It'd be great if I could have a 2nd set of eyes take a peek, Also, my running config is attached.
Will catalyst2960 supports SSH, and how to configures with CLI.
View 2 Replies View RelatedI need to upgrade a Catalyst IOS, but I got a bit confused. The catalyst is currently running "c2960-lanbase-mz.122-35.SE5.bin", but I want to upgrade to "c2960-lanbasek9-mz.122-35.SE5.bin", in order to enable ssh. [code] What are the appropriate steps in order to upgrade to "c2960-lanbasek9-mz. 122- 35. SE5.bin". I have downloaded the tar file (c2960-lanbasek9-tar.122-35.SE5.tar)
1) Do I have to delete the old directory (drwx 192 Mar 1 1993 02:07:21 +02:00 c2960-lanbase-mz.122-35.SE5)?
2) Are these the correct steps to download and extract the IOS?
3) Where will the tar files be extracted? Will an new directory be made or do I have to make one manually?
I have packet loss with QoS configured and I was wondering is it somehow connected with the QoS configured on the switch.The traffic is passing through fa0/19 and gi0/1 interfaces.
mls qos map cos-dscp 0 8 16 24 32 46 48 56
mls qos srr-queue input bandwidth 90 10
mls qos srr-queue input threshold 1 8 16
mls qos srr-queue input threshold 2 34 66
[code]...
I have 4 Catalyst 2960 connected via Etherchannel to each other. If I plug in my notebook in one port, I see the traffic from the neighbor port. So my switch acts like a hub.. I had a look at my MAC table and saw it isn't full.
View 2 Replies View Related2960 switch stack (flex) Spanning tree re-calculate from stack port one?I need to identify with port in the stack is causing the re-calc I have four 48 port switches and show spanning detail only indicates stack port 1.
View 1 Replies View RelatedI have ciscl catlyst 2960 8port switch, (flash:c2960-lanbasek9-mz.122-50.SE4/c2960-lanbasek9-mz.122-50.SE4.bin).
and in need to configure bandwidth limit for one of the port as a 1Mbps.
In an attempt to restore a Cisco IOS I deleted the file C2960-lanbasek9-mz.122-53.SE2.bin my swich
Before deleting the same was as follows:Directory of flash :/
3-rwx 12824 Mar 28 1993 21:00:37 -03:00 vlan.dat4-rwx 3096 Mar 7 2012 08:43:37 -02:00 multiple-fs5-rwx 2289 Mar 7 2012 08:43:37 -02:00 private-config.text6-rwx 7482 Mar 7 2012 08:43:37 -02:00 config.text9 drwx 192 Mar 23 2012 16:18:54 -03:00 C2960-lanbasek9-mz.122-53.SE2
32514048 bytes total (20204544 bytes free)Switch-01 #
Right now this switch as follows:
switch: dir flash:Directory of flash:/
2 drwx 64 <date> crashinfo_ext 3 -rwx 4120 <date> multiple-fs 5 -rwx 12824 <date> vlan.dat 6 -rwx 4018 <date>
[Code].....