Jun 10, 2011Zero downtime 3750 stack upgrade?
View 1 RepliesZero downtime 3750 stack upgrade?
View 1 RepliesZero downtime 3750 stack upgrade
View 3 Replies View RelatedIs it possible to upgrade a c3750-stack one member at a time to avoid downtime? I need to keep L3-functionality up.
If I have one etherchannel from access-switch (2 channel-ports in 3750, in different stack-members), my 3750-stack as a distribution layer switch, and another etherchannel (also spread over multiple stack members) to core, can I upgrade the entire stack without traffic interruption?
I am trying to do ios upgrade on 5 stacked 3750 switches. All the switches have different model number, so i am wondering which image file i should download. As far as i understand all the stacked switches should have the same IOS, i may be wrong. The switches have the following model numbers and SW images;
Switch Ports Model SW Version SW Image
------ ----- ----- ---------- ----------
1 28 WS-C3750G-24PS 12.2(35)SE5 C3750-IPSERVICESK9-M
* 2 28 WS-C3750G-24PS 12.2(35)SE5 C3750-IPSERVICESK9-M
3 52 WS-C3750G-48PS 12.2(35)SE5 C3750-IPSERVICESK9-M
4 30 WS-C3750E-24PD 12.2(35)SE5 C3750E-UNIVERSAL-M
5 30 WS-C3750E-24PD 12.2(35)SE5 C3750E-UNIVERSAL-M
which image file i should use as they all have different model numbers and Cisco provides different image files for each model.
I want to upgrade the IOS version of 3750 48PS switches. these stacks are located on different building some of the them having 2 members and some have 3 members in a stack.step by step to upgrade the IOS of these switches.
View 1 Replies View RelatedI have Cisco Catalyst Stack structure that consist of;
3750E-48TD-S (MASTER) (UNIVERSAL Image)
3750G-48TS-S (IPBASE Image)
3750G-48TS-S (IPBASE Image)
3750G-48TS-S (IPBASE Image)
I want to upgrade their IOSs to k9 images.
I can not dowload Universal Image file from Cisco website because of the expired service contract. I have IPBASE IOS files for all switches,
Can it be a problem to upgrade master switch IOS from Universal to IPBASE image?
I want to run rolling-stack upgrades on several stacks containing Catalyst 3750X-switches. I have done as follows: Configured the redundant uplinks as active and stand-by.Started to upgrade by using archive download-sw /rolling-stack-upgrade /overwrite /reload The upgrade starts as expected BUT switch number 2 in the stack is reloaded BEFORE switch 1 is finnished, the result is of course downtime for the stack. The documentation says something about the command "boot time", but what is this command doing? The default seems to be 7 minutes, it this parameter the time the upgrade-process waits before booting the next switch in the stack? I would expect that switch number 2 is reloaded when switch 1 is up again after reload, and not after an absolute number of minutes, is the rolling-stack-upgrade not working this way ?
View 4 Replies View RelatedI wanted to know if there is a way of upgrading the IOS on a stack of 6 - 8 3750's with minimal impact at reload. Is there a way to reload one member at a time?
View 3 Replies View RelatedI have a stack of 4 Cisco Switch 3750 (1 x WS-C3750G-24T, 2 x WS-C3750-48P and 1 x WS-C3750V2-48PS) and I want to do an firmware upgrade of this stack. Actually, all the 4 switches are at the firmware version 12.2(50) SE1 "IPBase" and I want to upgrade them to 12.2(55)SE5 IPBase. According to the release notes, all the switches in my stack are supported.
To upgrade the firmware, I use the command "archive download-sw /imageonly /overwrite tftp://IP_Address/c3750-ipbaselmk9-tar.122-55.SE5.tar" The firmware gets uploaded correctly but then I get the error message "There is insufficient space in flash: to install the required image. Clean up some old images, and try again."
When I do a "show flash", I see that the switch has 5650944 bytes free of 15998976 bytes.
How can i upgrade my switches? Is there an error in my command which I use? Do I need to add an other option?
The problem is, the switches are located in a branch office and there is no direct access to them. Everything must be done remotely.
I have two 3750s stacked and one 3750 standalone all in one data closet. The both have the same versions. I want to combine them to make one stack. How do I force the standalone to be the master? sw 1 priority XX(Higher then the existing stack)? Both the stack and the standalone have management addresses. Would it be ok to delete the stack ip address? That way, the standalone(master's address will be the only management address)?How should I connect the standalone 3750 to the stack? At present, the 3750 stack is connected via a cascade cable going from the stack 1 port of the top switch to the stack 2 port of the bottom switch.
View 19 Replies View RelatedI have a stack of 4 3750 Switches.
1. WS-C3750G-12S
2. WS-C3750G-12S
3. WS-C3750X-48P
4. WS-C3750X-48P
The stack cable connected to Switch 1 Port 1 and Switch 4 Port 2 will not come back online. The logs show that there was a Stack line change. I have replaced the 1 meter Stack cable from Switch 1 to Switch 4 three times and it still does not come back online. This is the part that is interesting.. I have disconnected Port 1 Switch 4 and connected it to Port 2 Switch 4 and then Switch 4 came back online. This made me think Port 2 on Switch 4 was working correctly. Then I disconnected Port 2 Switch 1 and connected it to Port 1 Switch 1 and then Switch 1 came back online.
i have two cisco 3750 in stack firts, master switch have all swports busy second have only 5 how can i see cpu utilizations of the second switch, and its reasonable to move somme devices from first switch to second for deacreases of cpu and memory utilisatio ns of the master? the stack tehnologies use both cpu as one? or its only for simple management ?
View 9 Replies View Relatedhave a cable i think is bad, is it possiable to switch the cable out without causing any downtime to the switch or connected devices?
HQ-1st-Flr-Stack#show switch stack-ports summary
Switch#/ Stack Neighbor Cable Link Link Sync # In
Port# Port Length OK Active OK Changes Loopback
Status To LinkOK
[Code].....
I just need a little refreshing on upgrading a stack of 3750's. This stack only has 2 switches: [code]
1.) If I remember correctly I simply tftp the IOS to the flash of each switch and then reload the master only?
2.) Can I safely assume these are the 2 flash locations:
i want to remove an access layer 3750 48 POE master switch and replace with a new 3750 switch in the stack. i want to copy the same configuration to new switch since the old switch is having POE issue and I got replacement of the malfunctioned switch. we have VTP domain is configured in the network...
View 3 Replies View RelatedI have been given 2 3750 switches and need to put a config onto it wuld is for 2 3750's in a stack, how should I put this on the 2 switches? Is it bested to install it onto 1 switch first then physically attach the 2nd after?
View 3 Replies View RelatedOne of the stack member has failed and we need to replace the same with the new one.
[code],....
I'm setting up a web cache using the wccp protocol on a Catalyst 3750 stack.
Probably missing something real simple here but when I from the global configuration mode are trying to enter the ip wccp command it just says "invalid input" from wccp. There is no such command.. should be supported on my device from IOS 12.2(37)
We have two 6k5 configured as vss and it is working fine. For each floor we have a 3750 stack. In each 3750 stack we have 4 switches. From the first 3750 we have a fiber link to the first 6k5 and from the fourth switch we have another fiber link to the other 6k5 switch, for each floor/3750 stack, both configured as etherchannel. We installled each 3750 stack/floor in different maintenance windows; in all these installations we have problems configuring the etherchannel. After we configure the etherchannel on 3750 stack and in the vss, the etherchannel does not go up/up. We see the etherchannel up/down; after a lot off work, try and error, configuring shut/ no shut, adding and excluding links from the etherchannel; in any aleatory moment the etherchannel goes up/up and works fine. Is there any bug related with these IOS versions, or is there any right procedure to configure etherchannel from vss to 3750 stack?
3750 stack config (IOS
Cisco IOS Software, C3750 Software (C3750-IPBASEK9-M), Version 12.2(50)SE1, RELEASE SOFTWARE (fc2))
interface GigabitEthernet1/0/1switchport trunk encapsulation dot1qswitchport trunk allowed vlan 100,101,371,372switchport mode trunkchannel-group 1 mode on!interface GigabitEthernet4/0/1switchport trunk encapsulation dot1qswitchport trunk allowed vlan 100,101,371,372switchport mode trunkchannel-group 1 mode on!interface Port-channel1switchport trunk encapsulation dot1qswitchport trunk allowed vlan 100,101,371,372switchport mode trunk
[code]....
I currently have 5 3750s connected via Stackwise. This stack is connected back to my core (6509s) via fiber (1Gig to Core1 & 1Gig to Core2). I want to move the 5th 3750 to another closet due to an addition of a new patch panel. Due to max length of 10 ft. for stackwise, my plan is to connect this 5th switch back to the stack using trunked fiber ports, with them being an etherchannel (2Gig). Also plan to use single fiber port form 2 different switches in the stack to provide some redundancy for the 5th switch. Should I be alert of any issues with this connection design? Do I need to properly remove the 5th switch from the stack using, no sw 5 provison sw-model or can I just disconnect stackwise and connect back with fiber?
View 2 Replies View RelatedI had 2 3750 stacked and one of them decided to die (power supply) cisco replaced it and now i want to re-add that switch to stack. I have already upgraded my replacement switch to the same IOS version.I was reading that i can do it without powering down operational 3750 so the action plan so far is:
-power down NEW member
-connect stacking cable
-power up
as you can see my switch 2 is now a master and it still holds config of all Gi ports for switch 1. If i connect my NEW switch without any config (vlan.dat and startup-config) will my existing switch 2 copy all ports config to new switch ?
We had an "Event" on our process network at the mill yesterday. I connected a new WS-C3560V2-48TS-S to our network and we lost communications with all of the other switches.
The core is a stack of 3 WS-C3750 switches, one is a -24TS-1U and the other two are -12S-S. These connect to 10 WS-C3560G-24TS and 5 Rockwell Stratix 8000 (IE3000) over fiber. I am planning on replaceing two 24 port switches with the new 48 port. I had the switch configured and running at my work bench. It was connected to the network with one sfp module and ran all weekend with no issues. Yesterday afternoon I took it to the network cabinet and installed it. I powered it up and connected two sfp modules to the fiber patch panel and made the connection at the core stack.
Everything looked OK. I had communication link lights working on everything. Within minutes, we lost communication with every switch connected to the core stack. I shut down the new 48 port switch and the network slowly came back up.
The new 48 port is configured with Flex Links for the fiber redundancy protocol and was connected to each of the 3750G-12S-S stack members.
I though it might have been a power issue but the stack is UPS protected and shows it has been up for over 10 weeks. I'm not even sure "Crash" is the best decription for what happened. The new switch has a high enough IP address that it would not take over as a IGMP Querier.
I have 4 switches of 3750. I need toupgrade all the switches, but I can't to disconnect the stack cable.How I can to upgrade the version without to disconnect the stack cable?
View 2 Replies View RelatedI'm trying to upgrade the IOS ver on a 3750G stack (2 switches), but the img on the switch is too old.The stack is running IOS c3750-i9-mz.121-19.EA1d.bin, and when I tried to upgrade to a newer version, I tried to go to IOS ver c3750-advipservicesk9-mz.122-35.SE5.bin since I need to enable ssh on the switch, but the switch did not reload.
Here's a prtscreen of the switch ver:
Cisco Internetwork Operating System Software
IOS (tm) C3750 Software (C3750-I9-M), Version 12.1(19)EA1d, RELEASE SOFTWARE (fc1)
Copyright (c) 1986-2004 by cisco Systems, Inc.
Compiled Mon 05-Apr-04 22:40 by antonino
Image text-base: 0x00003000, data-base: 0x007CBC3C
[code]...
what IOS ver can I upgrade to that is not already deferred?
Any one try to form a stack with mixed 3750-X and 3750G? Is there any prerequisites in hardware and software?
View 5 Replies View RelatedI've a situation where I need to add a new 3750x to a existing stack of 3750. [code] When I tried to stack them together, I get a version mismatch error. Is this because of the difference in SW Image? What are my options next ? My ultimate goal is to make the new switch stack correctly with the exisitng switches.
View 11 Replies View RelatedI configured 3750 A switch with vlan 20 and its IP address 192.168.20.41Its default gateway was 192.168.20.3Then i configured 3750 B switch with same default gateway and vlan 20 IP 192.168.20.43My question is now when we stack it becomes single switch and now vlan 20 ip address is 192.168.20.43 thats only IP i can see.So how does stack switch choose vlan 20 IP?Does it choose highest IP address between two switches if they have same vlan 20 as in my case?Also when i go to switch 3750 b by session command and do sh ip route it does not show ip default gateway .Also it shows vlan 20 as admin down .
View 5 Replies View RelatedI am replacing our 2 3750s which are in a stack and are running in VTP server mode for the domain with 2 new 3750Gs. There are 4 trunks to other switches which bare in client mode and 2 trunks to 2 ASAs which are in active/standby mode (one in each switch). Anyway what will happen to the VTP clients when I replace the stack as the revision number will be 1 on the server? The clients will ignore any VTP updates from the server ?
View 6 Replies View RelatedI have a doubt. In my environment I have two Switch 3750-X in stack.
My question is: How to shutdown remotely only a switch in stack?
attached diagram and following is the basic configuration on L3 and L2 switch. Is this configuration sufficient for simple routing?
L3SWITCH:
switch 1 priority 15
switch 2 priority 10
[Code].....
I am getting a version mismatch when adding the following 3750X to the 3750 stack:
WS-C3750X-48 12.2(55)SE3 C3750E-UNIVERSALK9-M
2 0 WS-C3750-24TS 12.2(25)SEA C3750-I9K91-M
Can I upgrade the 3750's to be able to correct this? Which version does this require?
What will be the recommended connectivity of stack power cable in 6 number of 3750x switches ?
Is it similar to the stack cable ?
We have a stack of 3 cisco swithes 3750s WS-C3750G-24TS 12.2(25)SEB4 .We plan to recover a switch from the stack as it is not needed any more The switch we plan to recover is the existing Master.If we change the priority (switch 1 priority) and make another switch the master using command line will we have any loss of connectivity to the servers conecting to the stack ?
View 1 Replies View Related