I'm trying to upgrade the IOS ver on a 3750G stack (2 switches), but the img on the switch is too old.The stack is running IOS c3750-i9-mz.121-19.EA1d.bin, and when I tried to upgrade to a newer version, I tried to go to IOS ver c3750-advipservicesk9-mz.122-35.SE5.bin since I need to enable ssh on the switch, but the switch did not reload.
Here's a prtscreen of the switch ver:
Cisco Internetwork Operating System Software
IOS (tm) C3750 Software (C3750-I9-M), Version 12.1(19)EA1d, RELEASE SOFTWARE (fc1)
Copyright (c) 1986-2004 by cisco Systems, Inc.
Compiled Mon 05-Apr-04 22:40 by antonino
Image text-base: 0x00003000, data-base: 0x007CBC3C
[code]...
what IOS ver can I upgrade to that is not already deferred?
View 1 Replies
ADVERTISEMENT
May 26, 2011
I have a 3750G and bought a new 3750X. It possible to stack these two together?
View 5 Replies
View Related
Jan 29, 2013
I have a 3750G switch that can't detect another switch or be detected through its stack ports. I tried the recommended test; looping a cable between the ports and rebooting. I get the following message as the switch boots: SM: Detected stack cables at PORT1 PORT2. However, if I connnect another switch, it won't detect it and can't form a stack.
View 4 Replies
View Related
Jun 17, 2012
have one 3750G stack with 4 switches and this stack is presenting the follow log message:
%PLATFORM_UCAST-4-PREFIX: One or more, more specific prefixes could not be programmed into TCAM and are being covered by a less specific prefix, and the packets may be software forwarded.
In this stack we are using the layer 3 with OSPF routing, and the current sdm prefer is default:
switch-01-3750#sh sdm prefer
The current template is "desktop default" template.
The selected template optimizes the resources in
the switch to support this level of features for
8 routed interfaces and 1024 VLANs.(code)
View 2 Replies
View Related
Jul 17, 2012
Any one try to form a stack with mixed 3750-X and 3750G? Is there any prerequisites in hardware and software?
View 5 Replies
View Related
Nov 19, 2012
I am currently having performance issues running a 3 x stack 3750G (different models) as a core for a network of roughly 12 x distribution switches. [code] As above, I have a 12 port Fibre switch and 2 x 3750G-48 port switches. [code] I tried to change the SDM to route but hit another issue where the 3750g-48 does not support SDM route so I had to revert back to desktop VLAN.Could the SDM Template be the reason for slow performance? If so which SDM Template should i use as this is the Core L3 switch.
View 5 Replies
View Related
Apr 14, 2012
if we can stack the 3750G switch with a 3750X switch ?
View 7 Replies
View Related
Jun 13, 2012
Our customer has a stack of 6 3750G switches. They want to add another switch to the stack. I tried to quote another G, but I got a warning that the G series is EOS January 30,2013. Can I add a 3750X to the stack? I know that no matter what switch I get, I will have to upgrade the IOS in the stack, as the stack is running 12.2(25)SEE2.
View 2 Replies
View Related
Jul 15, 2012
I have a cisco WS-C3750G-24TS with IOS flash :/ c3750-mz.122-ipservicesk9-25.SEB4.bin "
I purchased a new Cisco WS-C3750X-24 with the IOS flash :/ c3750e-universalk9-mz.150-1.SE/c3750e-universalk9-mz.150-1.SE.bin. ( NEW )
When i configured a stack between the two 3750, the new switch restarted due the version mismatch (different IOS´s);
We have two versions:
WS-C3750G-24TS-ipservicesk9 flash :/ c3750-mz.122-25.SEB4.bin "
VS
WS-C3750X-24 flash :/ c3750e-universalk9-mz.150-1.SE/c3750e-universalk9-mz.150-1.SE.bin.
Is that possible to configure a stack between then?
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Tenho um cisco WS-C3750G-24TS com o IOS flash:/c3750-ipservicesk9-mz.1
22-25.SEB4.bin"
Adquiri um novo cisco WS-C3750X-24 com o IOS flash:/c3750e-universalk9-mz.150-1.SE/c3750e-universalk9-mz.150-1.SE.bin.
[code]...
View 4 Replies
View Related
Mar 21, 2012
I got Two Distribution Switches of Cisco 3750G. Each Distribution have two 3750G switches stacked. I also have one Cisco 3750V2 Access Switch connected to both Distribution. When I am checking for redundancy, I can only get redundancy test pass for one link not atall for other. If I have a link up with Distribution 1 only then its fine; but disappointment with Distribution 2 link. I can see that the switch priorities of Dist 2 is not correct ie. Master's priority is 10 and Member's is 15.
My question is that due to misconfigured priorities on Distribution 2 stack switches I am failing with redundancy if ONLY Dist 2 is up and Dist 1 is down.
View 4 Replies
View Related
Nov 3, 2011
I am about rip and replace my current 3750G stack with a 3750X stack. I have trunked over vlan and vtp info and implemented a config so it should be ready to go other then moving cables onto it. However one thing I want to correct with our current setup is that the root bridge on our vlans including vlan 1 is on a separate set of switches that we control, however I would like this new stack to be the root bridge for all of our vlans. It will be the central set of switches that all other switches trunk into. I have pre-set higher spanning-tree priorities for each vlan on the new stack so I expect as I move lines into it that the tree will be re-calculated with it as the root bridge. I've ensured that there are no root guards on any of the other switches trunks and priorities are all at default levels for each vlan. Should I enforce root guard on the trunk interfaces of the new master stack? Most of the trunks are port-channels to the other switches - do I need to set root guard on the Port channel interface or on the individual ports that make up the Port channel? On both? Any other recommendations in regards to implementing spanning-tree with the new stack? I know using port channels eliminates a lot of potential for loops but not every trunk is and I'd still like to have spanning-tree on.
View 1 Replies
View Related
Apr 22, 2012
Can we stack a 3750G-12S-S switch with a 3750-E-24TD-S switch?
View 4 Replies
View Related
Oct 23, 2012
I am running out of ports on a 4507R and would like to use a 3750G-24TS stack that I already have to expand capacity. Is it possible to configure EtherChannel between the 4507R and the 3750G stack and if so what is the best way to do it? without LACP, with active-active mode LACP or passive-active mode LACP...
This is what I have in mind:On the 4507R side I would like to use interface GigabitEthernet3/5 and interface GigabitEthernet4/5 where modules 3 and 4 on the 4507R are "6 1000BaseX (GBIC) (WS-X4306-GB)". On the 3750G side I would like to use ports 28 on both switches in the stack which are equipped with Cisco GLC-T= 1000BASE-T SFP transceiver module for Category 5 copper wire with RJ-45 connector. [URL] Cross-Stack EtherChannel Without PAgP or LACP should look like this:
3750switchstackA(config)#interface gigabitethernet 1/0/28
3750switchstackA(config-if)#channel-group 1 mode on
3750switchstackA(config-if)#switchport trunk encapsulation dot1q
3750switchstackA(config-if)#switchport mode trunk
3750switchstackA(config)#interface gigabitethernet 2/0/28
3750switchstackA(config-if)#channel-group 1 mode on
[code]....
is that what I should be doing? is there any benefit to the active-active mode LACP or passive-active mode LACP and which are applicable to the case above?
View 1 Replies
View Related
Aug 7, 2012
I have a stack of 3750G's where the connection between switch 1 port 1 and switch 2 port 2 are down
Stack Port Status Neighbors
Switch# Port 1 Port 2 Port 1 Port 2
--------------------------------------------------------
1 Down Ok None 3
2 Ok Down 3 None
3 Ok Ok 1 2
I have ruled out the stackwise cable as the problem but would like to know which switch has the problem
View 1 Replies
View Related
Feb 29, 2012
I currently have Cisco 3750G which is currently live and active and fully populated and only have remote access.
I have an additional same switch which I would like to stack. My initial plans were to have 2 GIbit etherchannels, but I came across the option to Stacks both switch with each other.
When I do a show switch on the live switch its set as a Member: [code]
I would like to add the new switch to the stack without losing the config for the switch which is live. I understand that the highest priority of the switches becomes the Master but as the live switch is Priority 1, would chancing this affect the switches config, or would it lose connection at all?
Also when I plug in the new switch and it reboot how do I ensure it becomes the slave without rebooting the live switch?The cables on the switch do they have to go to port1 on the live switch and port 1 on the new switch or can they be port 1 and port 2?
View 19 Replies
View Related
Jul 3, 2012
I've got a mixed stack as follows:
Switch 1 - 3750X-24P
Switch 2 - 3750G-24TS
Switch 3 - 3750G-24T
Running 12.2(53)SE2, IP base. Now I tried upgrading the firmware on the entire stack to 12.2(55)SE4 and ran into this error:(Command: archive download-sw /imageonly /overwrite /allow-feature-upgrade tftp://10.20.20.13/c3750e-universalk9-tar.122-55.SE4.tar)
Error: The image in the archive which would to used to upgade system number 2 does not support that system type.I haven't as yet removed the "3750G-24TS" switch from the stack and re-tried as yet, however, is the expectation that without the 24TS, the upgrade should work?
View 5 Replies
View Related
Nov 8, 2012
I have a couple of 3750G-24T-E switches running IOS 12.2 I would like to upgrade to IOS 15.x. Is this possible? Where do I find some information on the required licenses and costs? I must admit that the cisco search function did come up with a few pages but i was not able to extract the required information. I have not used the new software activation features yet.
View 1 Replies
View Related
Apr 23, 2013
I am looking few information on IOS up-gradation for the switch WS-C3750G-48TS-S . I loaded new Image on the flash and current flash and sh boot as below
Switch#sh flash
Directory of flash:/
2 -rwx 8859636 Mar 1 1993 00:08:14 +00:00 c3750-ipservicesk9-mz.122-37.SE.bin
3 -rwx 556 Mar 1 1993 00:02:38 +00:00 vlan.dat
4 drwx 64 Jan 9 2012 03:17:56 +00:00 crashinfo_ext
5 -rwx 5768 Apr 24 2013 04:25:28 +00:00 private-config.text
[code]...
1) I would like to set boot sytem parameter for the new IOS and secondary old IOS as well is below command works??? if IOS not coming up with new one 12.2.58 is it boots with old 12.2-35 ?
boot system flash:c3750-ipservicesk9-mz.122-58.SE2.bin;flash:c3750-ipbase-mz.122-35.SE5
2) If I set only boot system flash:c3750-ipservicesk9-mz.122-58 , if new image corrput swicth will check valid image and boot up with old image ?
3) If switch went to room1 switch mode and still I have valild running IOS c3750-ipservicesk9-mz.122-37.SE.bin at flash memory, how to restore with old image
View 2 Replies
View Related
Jun 17, 2012
Switch 2 has an interface configured in RSU Standby.Switch 3 has an interface configured in RSU active. The upgrading sequence is : Switch 2, Switch 1, Switch3.The aim of the test is to prove that there is no loss of IP connectivity throught the RSU process.During the RSU process, there are ping between all the computers.
IOS starting version : 15.0-1.SE3
IOS upgrading version (with OVERWRITE) : 15.0-1.SE3 (same version)
1rst step : Switch 2 reboot and come back master but isolated from original stack (switch 1 and 3)
2nd step : Switch 1 reboot, and come back with switch 2 into the upgrading stack.
Issue : at this step :
- Switch 1 put its interface (IP 192.168.5.254) up :
- Switch 3 has not reboot and still has its interface (IP 192.168.5.254) up
=> we have some OSPF adjencies and mac flapping issues : switch 1 and 3 are trying to mount there OSPF adjencies on the same IP. We loss our IP connectivity since step 3 is not over.
3rd step : Switch 3 reboot and come back up in the upgrading stack. The IP connectivity is back, and the RSU process is done.Is that a normal behaviour ?How can we avoid to loose IP connectivity during RSU process ?
View 2 Replies
View Related
Jan 24, 2013
IOS upgrade tried on the stack of 2XWS-C3750X-24T-S , Upgrade was tried to support WCCP on the platform. Current version is Cisco IOS Software, C3750E Software (C3750E-UNIVERSALK9-M), Version 12.2(58)SE1, Not able find any IP Plus ios in the site ? Only available are IP base and Universal K9 , Tried upgrading to c3750e-universalk9-tar.122-58.SE2.tar by using stack upgrade method as per document [URL]
Upgrade fails with error :
%Error opening flash:update/info (No such file or directory)
ERROR: Image is not a valid IOS image archive.
Why current ios is not supporting WCCP , I hope it is there in the featureset. ( tried "sdm prefer routing" but no success) Does c3750e-universalk9-tar.122-58.SE2.tar will give me wccp support ? What is the issue with my upgrade and how do I do a successfull upgrade ?
View 3 Replies
View Related
Jun 10, 2011
Zero downtime 3750 stack upgrade?
View 1 Replies
View Related
Apr 18, 2012
I was just curious about something with upgrading a 2960s stack.
To copy the image to the switches in the stack I use: Switch# archive download-sw tftp://x.x.x.x/filename
Does this also set the image as the boot image or do I still need to issue the boot system flash command?
can I just issue this command on the master switch and reload and the new config will be pushed to the rest of the switches?
View 5 Replies
View Related
Feb 3, 2009
Zero downtime 3750 stack upgrade
View 3 Replies
View Related
Nov 13, 2012
I am trying to do ios upgrade on 5 stacked 3750 switches. All the switches have different model number, so i am wondering which image file i should download. As far as i understand all the stacked switches should have the same IOS, i may be wrong. The switches have the following model numbers and SW images;
Switch Ports Model SW Version SW Image
------ ----- ----- ---------- ----------
1 28 WS-C3750G-24PS 12.2(35)SE5 C3750-IPSERVICESK9-M
* 2 28 WS-C3750G-24PS 12.2(35)SE5 C3750-IPSERVICESK9-M
3 52 WS-C3750G-48PS 12.2(35)SE5 C3750-IPSERVICESK9-M
4 30 WS-C3750E-24PD 12.2(35)SE5 C3750E-UNIVERSAL-M
5 30 WS-C3750E-24PD 12.2(35)SE5 C3750E-UNIVERSAL-M
which image file i should use as they all have different model numbers and Cisco provides different image files for each model.
View 18 Replies
View Related
Jul 9, 2012
I want to upgrade the IOS version of 3750 48PS switches. these stacks are located on different building some of the them having 2 members and some have 3 members in a stack.step by step to upgrade the IOS of these switches.
View 1 Replies
View Related
Sep 30, 2009
Is it possible to upgrade a c3750-stack one member at a time to avoid downtime? I need to keep L3-functionality up.
If I have one etherchannel from access-switch (2 channel-ports in 3750, in different stack-members), my 3750-stack as a distribution layer switch, and another etherchannel (also spread over multiple stack members) to core, can I upgrade the entire stack without traffic interruption?
View 5 Replies
View Related
Nov 5, 2011
applied an iOS update to a stack via tftp. I used the archive Download-sw tftp:// method. I rebooted the stack after complete and it never came back up. I discovered the master switch upgraded but not the member. The member was sitting there with all amber lights on and frozen after the iOS load. The master wouldn't finish boot until I removed the member from the stack. I had a version mismatch and they would not communicate.
View 2 Replies
View Related
Oct 8, 2012
I have Cisco Catalyst Stack structure that consist of;
3750E-48TD-S (MASTER) (UNIVERSAL Image)
3750G-48TS-S (IPBASE Image)
3750G-48TS-S (IPBASE Image)
3750G-48TS-S (IPBASE Image)
I want to upgrade their IOSs to k9 images.
I can not dowload Universal Image file from Cisco website because of the expired service contract. I have IPBASE IOS files for all switches,
Can it be a problem to upgrade master switch IOS from Universal to IPBASE image?
View 1 Replies
View Related
Apr 1, 2013
I want to run rolling-stack upgrades on several stacks containing Catalyst 3750X-switches. I have done as follows: Configured the redundant uplinks as active and stand-by.Started to upgrade by using archive download-sw /rolling-stack-upgrade /overwrite /reload The upgrade starts as expected BUT switch number 2 in the stack is reloaded BEFORE switch 1 is finnished, the result is of course downtime for the stack. The documentation says something about the command "boot time", but what is this command doing? The default seems to be 7 minutes, it this parameter the time the upgrade-process waits before booting the next switch in the stack? I would expect that switch number 2 is reloaded when switch 1 is up again after reload, and not after an absolute number of minutes, is the rolling-stack-upgrade not working this way ?
View 4 Replies
View Related
May 15, 2013
I have 2 Catalyst 2960S-switches configured in a stack. The uplink is configured as a cross-stack etherchannel. Now I want to upgrade the stack with a minimum of downtime for the connected hosts. The hosts are connected to the stack via cross-stack etherchannels. So my question is: How can I upgrade the stack and reboot the members with a minimum of downtime? If I use the archive download-sw command with the /reload-option, the stack is reloaded and the result will be downtime for the hosts while th stack is reloading. Is it possible to upgrade the stack and then reboot the members one by one in a controlled manner?
View 8 Replies
View Related
Mar 19, 2013
This feature doesn't work as advertised on the Release Notes and other documentation. After 12 hrs of lab work and a tlwo day support call to TAC, they finally came back to me that:
IOS Upgrade works well if you use the command force-reload, without force-reload, it won't work. --"of course with this command the complete stack will go down and the purpose of RSU will not serve"
Then they pointed me to a bug that I could not find in the bug tracker unless I searched by the bug ID number ?? CSCua78897
Unfortunately this bug has a closed status and is not slated to be fixed ?
View 2 Replies
View Related
Dec 20, 2012
7x stack WS-C3750E-48TD-E orignal code 12.2.35...i wanted to get it to 15.0.1 so as a test i disconnected top switch (not the master ) and installed via archive download-sw /allow upgrade 15.0.1.tar. and it worked away fine...
so i moved onto the stack, issued the same command, image loaded rebooted and stack hung..Consoled in and switch was unable to boot..looping on trying to load flash. [code]
View 8 Replies
View Related
May 8, 2013
Are there issues with the auto upgrade feature for 3750X stacks, either historically or currently?
Some people prefer to upgrade switch stacks manually by disconnectiong the stack cables and uprading code on each switch.
I've done the manual procedure in the past and have not tried the auto upgrade (I have the procedure for the auto upgrade).
View 18 Replies
View Related