Cisco Switching/Routing :: Port Numbering On A Catalyst 3560 / 3750X
Apr 10, 2012
Assume I had Catalyst 3560X/3750X with 24 ports. The partnumber is WS-C3560X-24P-LI would like to how is the numbering defined if the switches have a C3KX-NM-10G installed with 4 SFP-GE-L.
View 1 Replies
ADVERTISEMENT
Oct 21, 2012
I've just installed 2 of these in my workplace on a PLC network.I'm now looking to set one of the ports up as my diagnostic port and would like to be able to mirror any of the other ports to this port.I believe it is called SPAN on Cisco switches.The only reference I can find to it is configuring via Telnet which I haven't got a clue about.On my old Wiedmuller switches it was just a few clicks away.
View 3 Replies
View Related
Nov 5, 2012
Im trying to access the switch to reset the password to factory defaults (please see switch output Astrix has removed customer identifying information for security purposes.) Each time I reboot the switch and try and access the password recover mode this same output below starts and im still not able to access the recovery area of the switch
cisco WS-C3560G-48PS (PowerPC405) processor (revision F0) with 122880K/8184K bytes of memory.
Processor board ID FOC1133Y28Q
[Code].....
View 3 Replies
View Related
Jan 30, 2013
How the port numbering would be on Sup 7-E and Sup 7L-E? I mean, on Sup-6E and Sup-6LE, if I used a twin-gig converter, I used ports gi3/3,gi3/4,gi3/5 and Gi3/6 [If the sup is in 3rd Slot]. I know there are now 4 ports on the Sup 7 which can either be used as Gig ports or TenGig ports. So, how will the port numbering change ?
View 1 Replies
View Related
Apr 2, 2013
blank configuration for WS-C4500X-16SFP+ (Catalyst 4500-X 16 TenGig Fixed ports switch).
I would like to know how the port numbering is done (i.e. TenGig1/0/X or TenGig1/X or just Eth1/0/X ? )
View 1 Replies
View Related
Aug 15, 2012
Concerning the WS-X4640-CSFP-E module, I was surprised to realize when I got it that the ports are numbered 1-80 rather than 1-40. Then I saw it is actually an 80 port blade when you use half-SFP's. But we have full SFP's, so how does it do the numbering? If I use all full-SFP modules, do the even-numbered ports just go unconfigured?
View 1 Replies
View Related
Jul 18, 2012
I have 2 x 3750 stacked, the port number of the master switch is gigabitEthernet2/0/1, slave as gigabigEtherent1/0/1.
Can I change the port numbering so that the master switch gets GigabitEthernet1/0/x?
View 4 Replies
View Related
Feb 8, 2012
I'm looking at implementing a new DMZ and wanted Netflow capability for security monitoring.The architectural principles I have to adhere to dictate that the switches within the DMZ are layer 2 however to get Netflow I need a minimum of a 3560/3750X, Network Services module, IP Base IOS with ip routing and CEF enabled.To do this and still keep the switch functioning as a layer 2 device the intention was not to configure SVI's or any static/dynamic routing protocols.Will Netflow still work in that scenario?
View 4 Replies
View Related
Jan 27, 2013
I try to updgrade a stack of two 3750X-48PS to the IOS 15.0-2
Same commande has the twelves others stack I have upgrade lately
archive download-sw /overwrite tftp://x.x.x.x/c3750e-universalk9-tar.150-2.SE.tar
or
archive download-sw /overwrite usbflash0:/3750/c3750e-universalk9-tar.150-2.SE.tar (much faster!)
At the end I have this message :
extracting c3750e-universalk9-mz.150-2.SE/info (511 bytes)
extracting c3750e-universalk9-mz.150-2.SE/c3750e-universalk9-mz.150-2.SE.bin (19842267 bytes)
[Code].....
View 3 Replies
View Related
Mar 25, 2013
I have upgraded my Catalyst 3750X-switches to software-version 15.0(2)SE2, but I cannot upgrade the 10G servicemodule to the same version. I use the archive download-sw command to load the c3kx-sm10g-tar.150-2.SE2.tar. The file is loaded to the switch, but when the process starts to transfer the file to the module it fails with the following messages:
Error 2: Unable to transfer image to FRU Modul on switch 1Error: Failed to update FRU Module image
The modules is now running with in-compatible versions as shown below:
Switch# H/W Status (CPU/FPGA) CPU Link Version
-----------------------------------------------------------------
1 OK 77C/71C ver-mismatch 03.00.41
2 OK 73C/73C ver-mismatch 03.00.41
View 1 Replies
View Related
Nov 20, 2011
if I read the Datasheet of Catalyst 3750X-Series-Switches it is possible to connect a new X-Switch to an existing and old Catalyst 3750-Series Stack.What kind of requirements are needed? Only same IOS-Version in the hole Stack and if possible same Feature-Set? .... like in a normal NOT mixed Stack?
View 4 Replies
View Related
Apr 9, 2013
Is it possible to mix 1 and 10 Gigabit links on a 1/10Giga Network Module of the Cat3750X? I mean porte GE1/1/1 and GE1/1/2 used with SFP and port TE1/1/2 used with SFP+; that makes TE1/1/1 not available as GE1/1/3 and 1/1/4
View 7 Replies
View Related
Jan 31, 2012
I work at a hospital and we have 3750X-48P switches in stacks in various locations throughout the hospital. We have noticed that when an EKG machine is plugged into one of the ports on some of these switches and the EKG machines are set manually to 100/Full, the ports are no longer usable until the switch is restarted. The switch is configured for auto. If the EKG machine is set to auto, it will work and not cause problems. The link on the interface will show up/up and there will be output packets increasing. However, there will be no inputs on the link and the port is unusable. Unfortunately, even when the device is removed, the port becomes unusable for any device. Is there any way to fix this problem without rebooting the switch?
View 5 Replies
View Related
May 17, 2012
the following information before:
Switch: WS-C3750X-48P (Stack with 2 Members)
IOS: 12.2(58)SE2
Lic: IPBASEK9
uptime: rebooted this night
[code]....
Since i added another Member to the Stack, i'm facing the following problem:When i login with my tacacs user account, i will not be asked for the password.The same thing is for the tacacs account of my colleague, after entering the username he is logged in.It seems for me, that the passwords are cached only for this Switch.
View 3 Replies
View Related
Sep 5, 2012
our network is spread over 15 floors and each floor we have 5-6 switches. we are planning to purchase cat3750-x 24 ps poe with C3KX-NM-10G network modules. Each floor has two up links to the core switch with single mode fiber and other being the multimode.Suppose if we are purchasing 75 switches do we have to purchase 75 C3KX-NM-10 G modules.? or can we limit our purchase with 15 C3KX-NM-10G sothat two uplinks from each floor can be made? since network modules are optional cost factor is invovled. Or any issue with stacking ? the SFPs will be LR and LRM MODULES.looking for an answer ? whether the new usb type console cable comes bundled with cat350x or shall we have to order separately?
View 7 Replies
View Related
Nov 14, 2011
convergence time in case of stack master will be switched over to other switch.In my understating, when the stack master will be switched over to other switch based on election algorithm, convergence time will be less than 10 second.
I tried to calculate concersion time during fail over testing but convergence time was 21 second. I think it is too long...
Expected reasons
・I configured Rapid Spanning tree protocol between L3 and L3. (But RSTP's convergence time is 2~3 second..)
View 4 Replies
View Related
Oct 28, 2012
We have a IP-phone system connected to port 1 on a 3560 switch, the phone system tags traffic with dscp. The switch uplink is on port 24.
Is this configuration correct:
interface 1:
auto qos trust
interface 24:
priority-queue out
View 3 Replies
View Related
Jul 21, 2012
When quoting a Catalyst 3750X with PoE (WS-C3750X-48P-E) the Dynamic Configurator Tool allows to include as the secondary power supply option the Catalyst 3K-X 350W AC Secondary Power Supply (C3KX-PWR-350WAC/2), but the default included primary power supply is the Catalyst 3K-X 715W AC Power Supply (C3KX-PWR-715WAC). My questions are the following:
1. Will this combination of power supply work?
2. Will the C3KX-PWR-350WAC/2 be able to power up the switch if the primary power supply of 715W fails?
3. Will the PoE will be lost if the primary power supply fails and only the secondary power supply of 350W keeps working?
4. If this secondary power supply of 350W is not suitable for PoE, why it is available as a secondary power supply option in the Dynamic Configurator Tool for a PoE switch?
View 4 Replies
View Related
May 12, 2013
configuration of a Catalyst 3750X and Barracuda Web Filter using WCCP protocol.
We used various WCCP protocol settings, unable set to redirect traffic to the Web Filter.
This is the current configuration of 3750X:
ip routing
ip wccp 94 redirect-list 194 group-list 50
ip wccp 95 redirect-list 195 group-list 50
[Code]......
View 5 Replies
View Related
Apr 3, 2011
I'm trying to work out if I need to order the "IP services" image for a couple of C3750-X. I need to run OSPF on these switches, but find the IOS image requirements on Cisco contradict.
At the top of the data sheet it says: • Open Shortest Path First (OSPF) in IP Base image
On the product info page it says: IP Base: Enterprise Access Layer 3 Switching, including OSPF (Open Shortest Path First) for routed access
But in lots of other places it says you need 'IP services' for OSPF.
As the IP services IOS is quite a bit more expensive I would like to avoid buying it. What image do I need to run OSPF?
View 6 Replies
View Related
Feb 13, 2012
Need to clarify if ip sla icmp echo operation is supported in catalyst 3kx switches (ip services)? on the configuration guide, commands are available, but on the feature navigator, i can't find the feature, only ip sla video operation. i don't have a device to test on here.
View 2 Replies
View Related
Oct 23, 2011
is it possible to shutdown a specific port on my 3750x and monitor this port at the same time .for example , im dealing with a mac authenticated network using port security , i want to shut down all the ports that are not used at the moment , however , if some one gets connected to the one of the shutdown ports i want to know the mac address of the user or atleast to know that i have someone who is just plugged in to the one of the shutdowned ports .
View 4 Replies
View Related
Feb 7, 2012
Does the Catalyst 3560 support GRE ?
I know that Catalyst 3750X support GRE ,but Catalyst 3750X cannot work in hardware it.
Does the Catalyst 3560 cannot work in hardware too?
View 4 Replies
View Related
Oct 28, 2012
I'm currently configuring per port policing on a 3560 and want to limit inbound traffic to 750mbit:
mls qos
access-list 1 permit any
class SET_IF
match access-group 1
policy-map SET_QOS
class SET_IF
[code].....
When I test the setup with iperf I always get different results when I change the nummber of parallel connections.Isn't there a way to limit the throughput regardless of the number of conns (INGRESS!) like with srr-queue bandwith limit?
View 2 Replies
View Related
Nov 29, 2012
We have observed increase of CPU utilization of 50% after upgrade from 15.0(1)SE3 to 15.0(2).The SDM template is "desktop default" template.The increase of CPU utilization in Switches with LAN Base after upgrade is about 10%.
How to find the cause for the 50% increase ?This is command is the output of 15.0(2). The calculated sum for 5min process-utilization is 21% plus 1% interrupt is 22 %. Where is the rest ?
switch#sh proc cpu sorted 5min | exc 0.00
CPU utilization for five seconds: 30%/1%; one minute: 29%; five minutes: 28%
PID Runtime(ms) Invoked uSecs 5Sec 1Min 5Min TTY Process
169 135084171 33273787 4059 9.92% 8.94% 8.73% 0 Hulc LED Process
83 80075989 13546109 5911 5.60% 5.39% 5.38% 0 RedEarth Tx Mana
[code].....
View 17 Replies
View Related
Aug 11, 2012
I'm having an issue with 2 of my 3560s which are not booting. The last thing I did on both switches before it hangs was:
>write erase
>reload
restarted as normal
[Code]....
I've tried powering-off the switch and pressing the Mode button and power on. I got to swtch: mode switch:reset
It restarted past the POST but just hang halfway at the same bootp-up process as shown on the attached. The SYST LED is Green color when it hangs.
View 9 Replies
View Related
Mar 17, 2013
I want to configure accesslists on my Catalyst 3750X-switches to protect different VLANs/networks. Any best-practices about inbound versus outbound accesslists? In my head it is more readable and easier to understand the config when accesslists are assigned outbound on the VLAN to protect instead of assigning them inbound on all possible source-VLANs. But of course, from a performance point-of-view it is better to use inbound access-lists to avoid un-necessary routing etc.
View 1 Replies
View Related
Feb 25, 2013
We have two catalyst 3560 switches running c3560-ipbasek9-mz.122-58.SE2.bin They are connected using etherchannel using gi 0/21 - 24 interfaces.
on 3560-1 switch, there isn't any ip-default gateway or ip route configured. It only have 1 interface vlan configured.
on 3560-2 switch, there is ip default gateway configured along with 1 interface vlan.
What i dont understand here is that, i can reach out to other subnets from 3560-1 switch in which the routing is not enabled?
View 4 Replies
View Related
Oct 21, 2012
I have a 2504 WLC connected to a Catalyst 3560 which has multiple vlans and is connected to a 2800 series router. I know the catalyst is L3 but I am needing nat functions to get outside to the internet. From my 2800 series router I am able to ping out to the internet, also I am able to ping the vlan interfaces on the catalyst switch. Problem is from the catalyst switch I can ping the inside and outside address of the 2800 but I cannot get any further then that. I cannot ping the 2800 router gateway. Not sure what I am doing wrong as far as routing.
I've attached my 2800 and 3560 configs.
View 3 Replies
View Related
Oct 15, 2012
Cisco C2960S IOS:12.2(55)SE5
Cisco C3560X IOS: 12.2(55)SE3
The 3560 switch is serving as an access and distribution layer switch. End devices are connected to it and it also implements IP routing via SVI and L3 ports.Auto qos voice cisco-phone has been implemented on applicable access layer ports. SRND4 is being used.
2960:
mls qos map policed-dscp 0 10 18 24 46 to 8
mls qos map cos-dscp 0 8 16 24 32 46 48 56
mls qos srr-queue output cos-map queue 1 threshold 3 4 5
mls qos srr-queue output cos-map queue 2 threshold 1 2
mls qos srr-queue output cos-map queue 2 threshold 2 3
mls qos srr-queue output cos-map queue 2 threshold 3 6 7
[code].....
Question 1:Why is the auto qos generated policed-dscp map different on these two switches?The Cisco Smart Business Architecture LAN configuration files guide [URL] does not specifically use the 3560 in their examples, they use the 3750 but it's my assumption that the same techniques, configs apply with regard to my specific feature questions. When using a 3750 in the Access layer, the guide shows (page 15) the same auto qos generated policed-dscp map configuration that is on my 2960. The SBA LAN config guide shows that when using a 3750 as a Distribution layer switch (page 26), the policed-dscp map configuration is the same that I see on my 3560.In the configuration guide for the 3750 distro switch, there is no auto qos applied as there are no access ports, so the mls qos commands are manually input. Since my 3560 does have access ports, auto qos generated the mls qos commands, and the results are the same be it following the guide and manually entering (per distro switch guidelines) or using auto qos. This leads to question 2...
Question 2:Why is the mls qos map policed-dscp configuration different depending on use as an access vs. distribution switch?
Question 3: On the 3560, access ports that have "auto qos voice cisco-phone" applied are put into queue-set 2 (output). Queue-set 2 (output) uses default values (not configured). Is this correct and desirable? If so, why? The 2960 has all ports in queue-set 1, regardless of being an access device port or a trunk port connected to the 3560 (as per the SBA LAN config guide EgressQOS macro commands). The 3560 trunk ports are all also configured to use queue-set 1 (output), again as per the SBA LAN config guide EgressQOS marco commands.
View 1 Replies
View Related
Jun 4, 2012
It is possible to configure the IOS NetFlow 122-58.SE2 in a Catalyst 3560?
View 5 Replies
View Related
Dec 10, 2012
I have one specific trouble with Catalyst 3560CG switch and Stardom reserved industrial controller. Controller has 2 processors, one of them after(!) negotiation become main with IP 192.168.1.1, other one stays in reserve with IP 192.168.1.129. If main one shuts down, spare one becomes main with IP 192.168.1.1. This perfectly works with DLINK and MOXA level 2 switches, but fails with Catalyst 3560, because spare one cannot even connect to switch port. I don't know the exact reason of it, but i suspect, that it happens because of before negotiation both controllers have ip 192.168.1.1 (i know, that it is wrong and weird, but so it goes). First of them correctly connects to switch port, which goes up and passes pings. Second processor tries to connect to switch port, which goes several times up and very soon down, then processor lefts his tries to connect to anybody and become idle. The switch seems to some way check IPs of 1-st and 2-nd port packets, and shuts down 2-nd port. I have connected via hyperterminal and tried to disable some level 3 functions and checks of the switch, but this wasn't useful. how exactly(or at least approximately) should i configure a switch to make this bundle work?
View 1 Replies
View Related
Aug 12, 2012
I have 5 SVIs configured for VLAN Interfaces 121-125 for my vSphere environment.
All VMs can ping IPs on all the VLANs (VMs on VLAN 124 can ping VMs on VLAN121)
All VMs, except those on VLAN 124, can access the Internet or even ping my router IP.
If I change one of the VLAN 124 VMs to use a different VLAN, and update the addressing appropriately, it can access the Internet.
The problem is exhibited with Windows and Linux VMs. So, I believe something in my switch setup is the problem with VLAN 124 in particular.
If i do a show vlan brief, VLAN 124 is listed.
If I do a show ip int brief, VLAN 124 is listed as upup. I also tried to shut o shut the VLAN 124 interface.
Only one specific VLAN has connectivity problems?
My topology is Catalyst 3560 to home router to Internet.
Here is my IOS image: c3560-ipservicesk9-mz.122-55.SE6.bin
Here is my show run output:
3560_02#sh run
Building configuration...
[Code].....
View 4 Replies
View Related