Is it possible to mix 1 and 10 Gigabit links on a 1/10Giga Network Module of the Cat3750X? I mean porte GE1/1/1 and GE1/1/2 used with SFP and port TE1/1/2 used with SFP+; that makes TE1/1/1 not available as GE1/1/3 and 1/1/4
I have upgraded my Catalyst 3750X-switches to software-version 15.0(2)SE2, but I cannot upgrade the 10G servicemodule to the same version. I use the archive download-sw command to load the c3kx-sm10g-tar.150-2.SE2.tar. The file is loaded to the switch, but when the process starts to transfer the file to the module it fails with the following messages:
Error 2: Unable to transfer image to FRU Modul on switch 1Error: Failed to update FRU Module image
The modules is now running with in-compatible versions as shown below:
Switch# H/W Status (CPU/FPGA) CPU Link Version ----------------------------------------------------------------- 1 OK 77C/71C ver-mismatch 03.00.41 2 OK 73C/73C ver-mismatch 03.00.41
if I read the Datasheet of Catalyst 3750X-Series-Switches it is possible to connect a new X-Switch to an existing and old Catalyst 3750-Series Stack.What kind of requirements are needed? Only same IOS-Version in the hole Stack and if possible same Feature-Set? .... like in a normal NOT mixed Stack?
i have a cisco Netowtk Analysis module installed on a 6513 core switch which is NAM-1, the version on the NAM is 5.1 and we need to upgrade to the latest version which is 5.1(2)
I work at a hospital and we have 3750X-48P switches in stacks in various locations throughout the hospital. We have noticed that when an EKG machine is plugged into one of the ports on some of these switches and the EKG machines are set manually to 100/Full, the ports are no longer usable until the switch is restarted. The switch is configured for auto. If the EKG machine is set to auto, it will work and not cause problems. The link on the interface will show up/up and there will be output packets increasing. However, there will be no inputs on the link and the port is unusable. Unfortunately, even when the device is removed, the port becomes unusable for any device. Is there any way to fix this problem without rebooting the switch?
Assume I had Catalyst 3560X/3750X with 24 ports. The partnumber is WS-C3560X-24P-LI would like to how is the numbering defined if the switches have a C3KX-NM-10G installed with 4 SFP-GE-L.
Switch: WS-C3750X-48P (Stack with 2 Members) IOS: 12.2(58)SE2 Lic: IPBASEK9 uptime: rebooted this night
[code]....
Since i added another Member to the Stack, i'm facing the following problem:When i login with my tacacs user account, i will not be asked for the password.The same thing is for the tacacs account of my colleague, after entering the username he is logged in.It seems for me, that the passwords are cached only for this Switch.
our network is spread over 15 floors and each floor we have 5-6 switches. we are planning to purchase cat3750-x 24 ps poe with C3KX-NM-10G network modules. Each floor has two up links to the core switch with single mode fiber and other being the multimode.Suppose if we are purchasing 75 switches do we have to purchase 75 C3KX-NM-10 G modules.? or can we limit our purchase with 15 C3KX-NM-10G sothat two uplinks from each floor can be made? since network modules are optional cost factor is invovled. Or any issue with stacking ? the SFPs will be LR and LRM MODULES.looking for an answer ? whether the new usb type console cable comes bundled with cat350x or shall we have to order separately?
convergence time in case of stack master will be switched over to other switch.In my understating, when the stack master will be switched over to other switch based on election algorithm, convergence time will be less than 10 second.
I tried to calculate concersion time during fail over testing but convergence time was 21 second. I think it is too long...
Expected reasons
・I configured Rapid Spanning tree protocol between L3 and L3. (But RSTP's convergence time is 2~3 second..)
i want to know if 1port of the 16 10Gbase-t Module (WS-X6716-10T-3C) for the Catalyst 6500E Series, can be connected to a 1Gbase Port of a 2900 ISR Routers, are they gonig to work at 1Gbps or, simply, they are not compatible?
If it is true, can i create a 4ports etherchannel between them? of course using the 16 1Gbase-T switch module on the Router.
When quoting a Catalyst 3750X with PoE (WS-C3750X-48P-E) the Dynamic Configurator Tool allows to include as the secondary power supply option the Catalyst 3K-X 350W AC Secondary Power Supply (C3KX-PWR-350WAC/2), but the default included primary power supply is the Catalyst 3K-X 715W AC Power Supply (C3KX-PWR-715WAC). My questions are the following:
1. Will this combination of power supply work?
2. Will the C3KX-PWR-350WAC/2 be able to power up the switch if the primary power supply of 715W fails?
3. Will the PoE will be lost if the primary power supply fails and only the secondary power supply of 350W keeps working?
4. If this secondary power supply of 350W is not suitable for PoE, why it is available as a secondary power supply option in the Dynamic Configurator Tool for a PoE switch?
I'm trying to work out if I need to order the "IP services" image for a couple of C3750-X. I need to run OSPF on these switches, but find the IOS image requirements on Cisco contradict.
At the top of the data sheet it says: • Open Shortest Path First (OSPF) in IP Base image
On the product info page it says: IP Base: Enterprise Access Layer 3 Switching, including OSPF (Open Shortest Path First) for routed access
But in lots of other places it says you need 'IP services' for OSPF.
As the IP services IOS is quite a bit more expensive I would like to avoid buying it. What image do I need to run OSPF?
Need to clarify if ip sla icmp echo operation is supported in catalyst 3kx switches (ip services)? on the configuration guide, commands are available, but on the feature navigator, i can't find the feature, only ip sla video operation. i don't have a device to test on here.
My company has acquired a Catalyst 6513 with a FWSM module installed on it. I have been reading lot of documentation on [URL], but still have some problems configuring the FWSM:
The 6513 has 10 SVIs configured, each of them with an IP address. These 10 SVIs are binded to 10 VLANs which I need to secure. These SVIs are used for routing all the Inter-VLAN traffic inside the switch. The documentation says it is recommended to use just one SVIs for connecting the switch to the FWSM, although you can use more than one using the command "firewall multiple-vlan-interfaces". I don't want to use this command because it seems a pretty more difficult configuration, since you have to use policy routing after using this command (or that is, at least, what documentation says).
When I try to "send" to the FWSM more than one VLAN that are configured as SVIs on the switch I get this error message:
"No more than one svi is allowed, command rejected."
If I delete the IP address of those SVIs, then I can to "send" those SVIs to the switch with no problem at all. But I need the SVIs to have IP address configured, since they are needed for routing Inter-V LAN traffic.
So, the question is: how can I route all the inter-VLAN traffic using just one SVI on the switch? Should I use the FWSM for inter-VLAN traffic routing?
I want to configure accesslists on my Catalyst 3750X-switches to protect different VLANs/networks. Any best-practices about inbound versus outbound accesslists? In my head it is more readable and easier to understand the config when accesslists are assigned outbound on the VLAN to protect instead of assigning them inbound on all possible source-VLANs. But of course, from a performance point-of-view it is better to use inbound access-lists to avoid un-necessary routing etc.
switch catalyst 4500 with ios cat4500e-universal.SPA.03.02.00.XO.150-2.XO.bin. I need to configure modules 3 and 4 of supervision, the problem is that I need the 4-port module 3 are active but only the first turn on both the module 3 and the first port on the module 4. [code]
I have a Cisco catalyst 6513 with sup720-3bxl and WS-X6724-SFP modules , the switch was working fine until yesterday ,but after a maintenance the modue WS-X6724-SFP failed to bring online , the error code is (Module Failed SCP dnld) does it mean the module has hardware problem or i need to replace it ?
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- ios version s72033-adventerprisek9_wan-vz.122-33.SXH7.bin ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- show module Mod Ports Card Type Model
We have a core switch with the following ios and supervisor engine. Can we add a16 port LR (x2)or LRM(X2) ON the core switch?if not what modifications has to be done?if an ios upgrade is necessary is it a costly affair?At present we have two 1gb up link modules in single and multimode fiber .
#sh moduleMod Ports Card Type Model Serial No.--- ----- -------------------------------------- ------------------ ----------- 1 16 SFM-capable 16 port 1000mb GBIC WS-X6516A-GBIC SAL0803T308 2 48 SFM-capable 48 port 10/100/1000mb RJ45 WS-X6548-GE-TX SAD07500600 5 5 Supervisor Engine 720 10GE (Active) VS-S720-10G SAL1439UMZK #sh versionCisco IOS Software, s72033_rp Software (s72033_rp-IPBASE-M), Version 12.2(33)SXI4a, RELEASE SOFTWARE (fc2)Technical Support: [URL] Copyright (c) 1986-2010 by Cisco Systems, Inc.Compiled Fri 16-Jul-10 19:51 by prod_rel_team ROM: System Bootstrap, Version 12.2(17r)SX7, RELEASE SOFTWARE (fc1) uptime is 1 year, 27 weeks, 4 days, 23 hours, 30 minutesUptime for this control processor is 1 year, 27 weeks, 4 days, 22 hours, 58 minutes(code)
Does the Network Module "C3KX-NM-1G" and "C3KX-NM-10G" for Cisco Catalyst Switch 3750X Comes with a transciever like GLC-SX-MM or SFP-10G-SR or do I need to order in seperately.
Switch: WS-C3750X-48P (Stack with 2 Members) IOS: 12.2(58)SE2 Lic: IPBASEK9
[Code]....
Since i added another Member to the Stack, i'm facing the following problem: When i login with my tacacs user account, i will not be asked for the password. The same thing is for the tacacs account of my colleague, after entering the username he is logged in. It seems for me, that the passwords are cached only for this Switch.
can i use any downlink port of the C4500-X switch as uplink without the need of the network module?i need to connect that switch to C6500E backbone without getting the network module, is that OK or i must get the network module?
For the c3kx-nm-1g network module it looks like it will take the standard sfp's for fiber but I need copper rj45 connections, is there a copper sfp for this?
I am implementing a guest wireless network to work alongside my internal network. The guest network will use the existing switching network and will be separated by VLANs. I have the ASA set so that traffic can get to it and out to the Internet. I can set up a workstation on the same VLAN as my guest network and can route inside my network (strictly doing this for testing purposes). Where I am having problems is with the Catalyst 4506 switches and the ip routing. I had two separate "ip route" statements defined on my switches.
ip route 10.200.2.0 255.255.255.0 10.200.2.254 ip route 0.0.0.0 0.0.0.0 10.100.100.254
I have discovered that the traffic is always following the default route despite the fact that my IP address on my test workstation falls in the 10.200.2.x network. I was looking at documentation and found that it is possible to set up policy-based routing on the core switches. Can you have two "ip route" statements defined like this to segreate traffic or do I have to use PBR for routing (or a combination) in this case? If I define PBR then how does that impact my existing routing? I need to make sure that I can still route the existing traffic while I'm configuring this change.
I know that the C3KX-NM-10GT network module has two (copper) ports that support speeds of 1Gps or 10Gps. Could this module work with one port at 1Gb and the second port at 10gb simultaneosly? It's possible to work each port of the module with different speed (one port working on 1Gb mode and the other working on 10Gb mode)?
Wondering if this switch is capable of being a backbone switch for a network of about 1000+ users and if the switch can handle a sustained 30Meg of data going across it?
My management has tasked me to give them a high level overview of the different switching we can choose for our new building.
This is what I know so far.4 Closets, each closet has 450 ports,One MDF room that is will contain one UCS Chassis and a Nimble iSCSI SAN.
I am working on the spreadsheet and it looks like this (Not totally filled):
2960s3560x3750x45064510Approx cost (Each, 48PORT, POE+, 10G uplink, Dual PS, IP BASE) 6K7K8K45K75KMax Capacity192432432192384Backplane speed206464520520ProLeast ExpensiveStackable to 9Stackable to 9ProDual PSDual PSDual PSDual PSDual PSProLayer 3 opt Layer 3 optDual SupsDual SupsConExpensiveExpensiveConNo Dual PSConLayer 2 OnlyCannot stack more than 4 For the MDF I would like to use 2 Nexus 5548's with FEX's, and the layer 3 daughter board. For the IDF's I was thinking of two 4010's.
i cant find any difference in these two devices when i am trying to compare throughput.I need upgrade our new POP and there will be around 4900 MAC adresses in VLAN 150 and 130 MAC adresses in vlan 200.Uplink is 1 gig routed internet connection and there is 14 downlinks to separate villages.i found a few differences for eg stack interface on 3750x but i dont need it.
I have a stack of 2 x 3750X switches these are running 12.2(55)SE5. I needed to add some static IP routes and found that the ‘ip routing’ command is not supported. I came across a document that stated “On switches running the LAN base feature, static routing on VLANs is supported only with Cisco IOS Release 12.2(58)SE and later.” So I have upgraded to 12.2(58)SE2, but ‘ip routing’ is still not a valid command.
The release notes state:“On the Cisco Catalyst 3560-X and 3750-X Series, it adds support for 16 static IPv4 routes in the LAN Base image.”
I have read other posts that talk about running the ‘sdm prefer routing’ command which I have done, but I am still unable to add any routes or run the ‘ip routing’ command.