Feb 5, 2012Is it possible to create a stack with 5 WS2960-S series switches OR are you limited to only creating a stack of 4 switches.
View 1 RepliesIs it possible to create a stack with 5 WS2960-S series switches OR are you limited to only creating a stack of 4 switches.
View 1 RepliesI'm thinking about using a 3750 stacking around 4 or 5 switches intead of using one 4500 series switch.
1-My first argument was concerning the budget (one 4500 instead of four or five 3750 in stack mode) ---- Here i think 4 or 5 stacked 3750 is cheap than one 4500
2- My second argument was about harware redundancing that i don't have with one 4500 and that i have with stack mode ----Here i have more hardware redundancing with 3750
3- The bug that we notice today in 2960 and 3750 and not in 4500
4- Simple to manage a 4500 compare to 3750 stack design
5- I was looking also for the one with best backplane ----Here i didn't have any infos concerning the best backplane between 4 or 5 stack 3750 and a 4500.
6- I'm also looking for power redundancing.
I have an 2960S all configured, with vlans, ports configurations and others.Now, I bought other 2960S and two stack modules to create a stack with these 2 switches.We call:
-Switch1 (I have configured and in production)
-Switch2 (New switch, no configured)
Can I connect these two switches in stack without lost the configuration of my Switch1 and no turn-off this switch? Does not stop the users access?
I have Cisco Catalyst Stack structure that consist of;
3750E-48TD-S (MASTER) (UNIVERSAL Image)
3750G-48TS-S (IPBASE Image)
3750G-48TS-S (IPBASE Image)
3750G-48TS-S (IPBASE Image)
I want to upgrade their IOSs to k9 images.
I can not dowload Universal Image file from Cisco website because of the expired service contract. I have IPBASE IOS files for all switches,
Can it be a problem to upgrade master switch IOS from Universal to IPBASE image?
I would like to know how to stack 2 switch cisco 3550 that IOS C3550-ipservicesk9-mz.122-44.SE6
View 3 Replies View RelatedLooking for feedback from other organizations that have large 3750 stacks. I've got one stack of (8) 3750's composed of (6) 3750G's and (2) plain 3750's. This particular stack is usually unresponsive to SNMP queries and often fails to write config when we make changes. After a couple tries it will finally go. Part of my probably here is likely the plain 3750's that always boot faster and come up as the master. I should manually set the master to one of the G's. What I'm wondering is who else has 7-9 3750's stacked and are they performing well for SNMP, telnet, etc? I've got another newer stack of 7 3750E's that I need to add one more switch to. Need to decide if I want extended downtime to break the stack up or just add the 3750X to make member 8 and hope it performs well. I have 50+ 3750 stacks working great on our campus.
View 1 Replies View RelatedI am trying to do ios upgrade on 5 stacked 3750 switches. All the switches have different model number, so i am wondering which image file i should download. As far as i understand all the stacked switches should have the same IOS, i may be wrong. The switches have the following model numbers and SW images;
Switch Ports Model SW Version SW Image
------ ----- ----- ---------- ----------
1 28 WS-C3750G-24PS 12.2(35)SE5 C3750-IPSERVICESK9-M
* 2 28 WS-C3750G-24PS 12.2(35)SE5 C3750-IPSERVICESK9-M
3 52 WS-C3750G-48PS 12.2(35)SE5 C3750-IPSERVICESK9-M
4 30 WS-C3750E-24PD 12.2(35)SE5 C3750E-UNIVERSAL-M
5 30 WS-C3750E-24PD 12.2(35)SE5 C3750E-UNIVERSAL-M
which image file i should use as they all have different model numbers and Cisco provides different image files for each model.
We have several stacks of 3750 switches where this problem is occurring. All of the switches are running IOS version 12.2(50)SE3. (Yes, I know it's old.)
We're seeing inconsistency in how the stack reports members when issuing the following commands:
sow switch
show version
show inventory
Not all members are showing up in the output of the "show version" and "show inventory" commands. For example:
HUNTI-WV-WDAC03#sh switch
H/W Current
Switch# Role Mac Address Priority Version State
----------------------------------------------------------
1 Member 108c.cff2.ea00 15 0 Ready
2 Member 8cb6.4f0a.a600 1 0 Ready
*3 Master 8cb6.4f0a.9c00 1 0 Ready
(all three switches in stack are displayed)(code)
I am wanting to etherchannel from a 3750 stack to core Layer 3 switches (also 3750) with a cable going to each core switch, I have put both core switches and the stack under a 28bit subnet mask, but I dont seem to be load balancing across both links.
View 5 Replies View RelatedI have 3 3750 staking switch with the following configuration:
H/W Current
Switch# Role Mac Address Priority Version State
----------------------------------------------------------
1 Member 442b.0350.9400 1 1 Ready
2 Member 442b.0357.8780 2 1 Ready
3 Master 442b.036f.a800 3 1 Ready
The new switch is installed to be wired to the master switch. the swtich 3 (* 3 Master Ready 442b.036f.a800)my question is: if you disconnect the wiring from the master stack to connect to the new switch, it is possible that the new switch change the current configuration of stacking.
-Can I just add the new switch with clean configuration without changing the current configuration ?
-How is assigned the stack number? i need the new switch be with the GI4 / x?. I can I manually by assigning ports?
-If I want to the new 3750 member witch lower prioridad, can I change priority before adding to stack?
I would like to use flexstack to stack two Cisco 2960S 48 Port switches (2960S-48TD-L) for redundancy. Each switch will have a single 10G uplink into our Nexus 7K. One switch in the stack will terminate to linecard 6 (N7K-F248XP-25) and the other switch will terminate to linecard 7 (N7K-F248XP-25). My question is how many flexstack cables are needed? Do I need only one cable or do I need two to connect the two 2960s ?
View 2 Replies View RelatedOur environment consits of 4 cisco SGE2010 switches (stacked). I have implemented STP BPDUGUARD and Portfast on all client ports (suspected a loop). And our uplink to the Server DMZ recieves almost all of it's BPDU packets back(is that normal?) The issues lies where we have random ports dropping out - across all stacks for seconds at a time. We get errors/warning such as,Pinging between the DMZ network appears to be fine. Pinging from the client/switch network show packets being dropped quite frequently.All devices are on VLAN1 (I've have researched this and this could be the cause of the issue)
View 12 Replies View RelatedAny one who knows where I can find a documentation where it says the maximum switches per stack for the Catalyst 2960 family?
View 2 Replies View RelatedI have to add a 2960s PoE switch to an existing stack of two 2960s PoE switches. If The new switch has no configuration on it and the existing stack is broken by pulling te stack cables and then new cables are added and everything re-cabled correctly will the new switch assume the configuration from the stack without any issues?
View 10 Replies View RelatedI have been given 2 x 3750 switches that were a stack, I need to keep the configs on both but how do I make them individual switches again and remove the stack info?
View 3 Replies View RelatedLets say i have 2 3750 switches stacked via backend stack cables. Now if a packet needs to go from 1 switch in the stack to second switch in the stack, will it travel via stack cable or do we need to connect both switches via uplink ports (ethernet or sfp). I tried reading datasheet but it no wheres mention the actual frame path between switches in stack.
View 3 Replies View RelatedWhat are the options avilable to add a cat3560 g switch to a stack of 3750x switches.?is there a connector avilable ?or is it possible to trunk via fiber ? cat 3560 has 4 sfps and 224 10/100/1000 ports with poe. cat 3750 stack has a 10 gb up link . What are the possible options?
View 6 Replies View RelatedI have an issue with a Cisco 3750 switch stack which is connected to two seperate upstream Cisco 3750's which are administered by an ISP. The ISP is experiencing MAC address flapping from one of my VLAN SVI's i am using to route traffic upstream
[code]...
As you can see I utilise a VLAN SVI to route traffic to the upstream 1.1.1.2 (illustration only) IP. As per the diagram of the topology attached, the ISP is receiving a MAC address flapping error confirming the SVI MAC address from my switch stack is being learnt on the trunk port connecting switch 1 and switch 2, and also the port (Gi1/0/48) directly connected to my switch stack. As these are all Layer 2 links essentially being passed upstream and then connected between the two ISP switches, we have a 3 way triangular loop formed.
If I was to remove the port channel configuration from the two ports associated with the VLAN SVI, am i right in suggesting this would still form a layer 2 loop? The two ports would still be a member of the SVI VLAN, and it is the VLAN MAC address which is being learnt by the two ISP switches on different interfaces.
we are using cisco 6509 series switches as core switches. and Cisco 4510,4507 series switches as edge switches. all the vlans are created at core switches and propogating to edge switches through VTP. we are using OSPF as routing protocol at core switch for internal routing. till now we are using 4510,4507 switches as layer 2 switches. Since, 4510 & 4507 switches are hign end swithces i want use them as layer 3 switches instead of layer 2.if i change these switches from layer 2 to layer 3 does it make any impact on our network or better to keep them as layer 2 switches.if i change these switches to layer 3 is there any advantage i will have.
View 3 Replies View RelatedI have to use 9 Cisco 300 series switches to build a new network. I will use one of them (core switch) in L3 for routing between Vlans (3 Vlans) and the others in L2. Is there a software to centralized all switches configuration, operation and monitoring?
View 1 Replies View RelatedI have a couple of WS-C3750X-48T-L and a couple of WS-C3750X-12S-S, I want to stack all four of them together into a single stack. WS- C3750X-12S-S are running c3750e-universalk9-mz.122-58.SE2 whereas WS-C3750X-48T-L are running c3750e-universalk9-mz.122-55.SE3.I have got a couple of queries as under:What are the options to achieve putting all these 4 switches into a single stack? Can the LAN Base switches upgraded to IP Base?
View 3 Replies View RelatedI have a router on which I would like to create a port channel that spans two different Nexus 2248TP switches, and then create a couple subinterfaces on the router's po interface. I've done this successfully on my primary router, but the config doesn't seem to work on the backup router. The primary is running IOS 15, while the backup is running 12.4.25d advanced IP. I do see the trunk come up from the switch side, and my router subinterfaces and po interface show up, however I'm not able to get anywhere from the router. It's not even able to reach other hosts on the same network. As soon as I remove the port channel config and use the physical interface and assign the same address used on the port channel interface, everything works as expected and I have connectivity.
interface Port-channel21
no ip address
hold-queue 150 in
!
interface Port-channel21.248
encapsulation dot1Q 248 native
ip address 100.100.100.1 255.255.255.0
[URL]
I am connecting power cable (series power cables) on 3750 stacks. i have connected them the same way the stack cables are connected i.e. fo rexample on a stack with 3 3750s:
1- fitst slot on fist switch connected the second slot last switch in the stack.
2- second slot/ port on the first switch to the first on second and seoncd on teh second switch to first on the third switch.
this how they are alway been stacked.Now, I need to connect power cables and I have followed the same method for stacks up to 4 switches. it seems that if a stack has more tham 4 switches, then the cabling will be dofferent!?I was wondering what will be on the cabling scheme for stacks more than 4 switches.
OSPF normally only comes with IPservices image and not IP Base image. The 3560-C series data sheet says that it only suport IP Base image, yet it mentions that support for OSPF in included. Are there any restictions in the OSPF support?.
View 7 Replies View RelatedMy task is to upgrade a couple of 6500 series switches, 6513 with SUP720/MSFC3 (WS-SUP720) and Policy Feature Card 3 (WS-F6K-PFC3B) installed. How to upgrade those switches if in SSO redundancy mode with two SUPs installed?
I understand that it is good to connect to the MSFC3 via console and upgrade this first, is this correct?
I also have to upgrade some 6509 but I only can test it on one 6509-E, how to get everything up to date. [code]
I have a design for my infrastructure and i'm thinking to choose 4 or 5, or more, 2960 series in a stack mode instead of one 4500 series?
View 6 Replies View Relatedsome of the features of 6500 are enabled by default and woudn't appear in the "Show run". See the command below and how do I make sure whether these featues are enabled by default or not. Would it appear in the config if enabled?
ip verify unicast source reachable-via rx
ip verify unicast source reachable-via any
storm-control broadcast level 70
what are the difference between the commands below and can they be enabled together.
spanning-tree guard root
vs
spanning-tree loopguard default
vs
spanning-tree guard loop
I am in the process of upgrading our stack of 4 switches consist of WS-C3750G-48PS. Upon reading release notes found that there are two versions of release notes 1 day apart, the one 02 Sep 2012 saying that WS-C3750-48PS is not supported in this version. Then in release next day 03 Sep 2012 that note has been removed. Which one is correct. Is it supported with my model of switch or not.also unable to update boot path in the stack switches, "switch all" is not supported in the current IOS. Master switch has new boot path but unable to change in slaves.
View 1 Replies View RelatedI configure 3750 stack switch as core and 2960 stack switches as access layer switches.I connected my laptop to one of my core stack in VLAN 10 and I am pinging to one of my server in VLAN 1. What will be the minimum latency at the time of inter VALN routing
View 2 Replies View RelatedHow do you enable multicast traffic on 2900 series switches?
View 7 Replies View RelatedI've been fighting what seems to be an increased number of outqueue drops on our core stack and edge switches for the last 3 or 4 weeks.(The core consists of a stack of 5 3750s in 32-gig stack mode. The wkgrp switches are 3560s. all are at 12.2.52) The wkgrp switches are directly connected to users. We use Nortel IP phones with the phone inline with the user PC. auto-neg to 100/full. [code] However I have tried turning off QOS on a couple of workgroup switches (no mls qos, but left individual port configurations the same) but am still seeing drops.Since I have disabled qos on the switches in question (no mls qos) (not the core tho) I am presuming these commands have no affect on the switch operation and therefore cannot be related to the problem. With QOS turned off one would presume that it is general congestion - especially at the user edge where busy PC issues might contribute. So I wanted to see if I could see any instances of packets in the output queues building up.
I wrote some scripts and macros that essentially did a snapshot of 'show int' every 20 seconds or so, and looked for instances of 'Queue: x/' where x was greater than zero.What I found after several days of watching the core stack, and a few of the workgroup switches that are most often displaying the behavior, was that I NEVER saw ANY packets in output queues. I often saw packets in Input queues for VLAN1, once in a great while I would see packets on input queues for fa or Gi interfaces, but NEVER on output queues. [ code] Additionally, when I look (via snmp) at interface utilization on interfaces showing queue drops (both core and wkgroup), they are occurring at ridiculously low utilization levels (as low as 4 to 8%). I've tried to look for microbursts between the core and a wkgroup switch where the core interface was experiencing drops, but haven't seen any (using observer suite). [code] While the queue-drop counts aren't critically high at this point, they are happening more frequently than in the past and I would like to understand what is going on... In most cases, no error counters are incrementing for these interfaces. Is there some mechanism besides congestion that could cause output queue drops?
I have a question for Cisco Cat.2960-s Flex Stack switches which are installing on our sties. Two of 2960-s Stack switches as access switch and two of Cisco ME 3600X Series as distribution layer switches are to be installed in our sites. In case of two stack switches, One is will be a Master and the other one will be a member logically, as you know. So, if the master fails, the other one automatically becomes the stack master following a well-documented election process.
Now, it is my question. How long takes to be a stack master from a member switch ? I cant find it on white paper of Cat.2960-s flex stack .
And also, I heard that sometimes a member switches don't election process when the master fails as a result, all stack members become
a panic. Is that really right ? In addition, I heard that the stack switches have many troubleshooting points than stand alone switches.
I really wanna know if the stack switches are good solution for resilience of huge network site. I'm waiting an answer from those who have experience of maintenance or installation.
I need to apply DHCP snooping on 4500 series switches working as L2 in my Network. We have external DHCL Server in another location connected with 6500 series switch.
Running EIGRP Configured Voice & Data Vlan both
DHCP Server -------- 6509 switch<----------------------------------->6509 Switch -------- 4500 switch ----------------------------------------------------------Ip Phones.
(ving Redundant) (ving Redundant)
I need to know whether the configuration which I mentioned in scenario is enough for apply DHCP snooping in my network.