Trying to find some documentation as to whether there are any other steps for inserting this new module in our N7K. We have 2 blades in already and 2 Sups in 5 & 6. I'm assuming its like the 6500s, where we just slide it in and the OS configures the global parms for it and the default VLAN.

View 2 Replies


ADVERTISEMENT

Cisco Switching/Routing :: 6506 Benefits Of Adding Nexus Switch To Datacenter

Sep 7, 2012

We have  two catalyst 6506 switches  with 10 gb u plinks  and around 120 edge switches cat 3750-x switches. Still the module on the  core wheere servers are connected  is 1000mbps port.Now if we induct a nexus switch to the datacenter what kinds of benefits we can reap In a virtulised environment as well as real  environment?following are the some of the queries.Can we reduce the number of edge switches? ( by virtual environment), Inter operabaility between cat ios and nexus ios, how this will affect the environement,What will be the over all benefits ?, What are the cons of this induction ?

View 22 Replies View Related

Cisco Switching/Routing :: 2811 - Adding Network Module

Dec 14, 2011

i have question about router 2811, for now, all HWIC in 2811 is full,

Slot 0 : VIC2-2E/M
Slot 1 : VIC2-2E/M
Slot 2 :  WIC-1T=
Slot 3 :  HWIC-1FE
   
But we need add more 2 module VIC3-2E/M. can we use Network Module ? example : add one NM-HD-2V + two VIC3-2E/M ?
 
Can we do that? and whether it is the same as we use the VIC2-2E / M on HWIC slots

View 2 Replies View Related

Cisco Switching/Routing :: Nexus 5596 N55-M160L3-V2 Module

Oct 31, 2012

Can Nexus 5596 support more than 1 N55-M160L3-V2 layer 3 module?

View 4 Replies View Related

Cisco Switching/Routing :: Nexus 7010 Module Failure?

Apr 11, 2012

I'm currently getting a Nexus hardware failure at present.
 
switch %MODULE-2-MOD_DIAG_FAIL: Module 8 reported failure due to DEVICE POST/DIAG FAILURE in device 48

View 1 Replies View Related

Cisco Switching/Routing :: SFP-GE-T Module Support On Nexus 5548?

Jan 7, 2013

I am trying to install SFP-GE-T module on Nexus 5548UP Switch, but is giving the ‘SFP validation Failed’ error. The details of the switch is given below

Model : N5K-C5548UP-FA

The interface is configured with speed 1000 before inserting the module, still we are getting the same error. PFA logs for more details We have 8 Nos of SFP-GE-T modules , all are giving same error. We tried to insert the module on onboard as well as expansion module.

The same module is working fine on Cisco 3750X-24T-L Switch As per the Hardware installation guide , SFP-GE-T transciever is supported on N5K platform. Please extend your support in configuring SFP-GE-T module on N5K platform? We tried with SFP-GE-S module on the same switch , and the same is found working fine.

View 2 Replies View Related

Cisco Switching/Routing :: Nexus 5k Adding And Removing Vlans In Port-channel (vpc)

Dec 4, 2012

I am a bit confused by the output of 'show run' and 'show run switch-profile' that pertains to a port-channel interface configured in a switch-profile. My main gaol is to find out how can I add/remove the allowed vlans the port-channel (configured as trunk) carries. The setup is like this. I have 2 N5k in vPC domain and Etherner1/11 on both switches is configured as trunk vPC that connects to a core switch. When I issue ‘show run’ for the port-channel and physical interface I get the following output. [code] From above it seems the switch-profile configuration is missing the 'switchport trunk allowed vlan' in the port-channel interface. If want I to remove vlan 30 from the allowed vlan, should I go under the switch-profile mode and remove vlan 30 from the allowed list even though the switch-profile configuration seems to be missing this.

View 2 Replies View Related

Cisco Switching/Routing :: Nexus 7k - Can't Update Epld On 10gb Module

Oct 19, 2011

I am having trouble updating the epld image on the 10gb Module of Nexus 7k. we have two nexus and two 10gb module. Tried the other one and it worked fine. its jsut the first one that has problems with the epld image. i have tried on both the nexus on two different slots and still the same error.
 
I get the following error:
 
Chain connectivity is broken while upgrading the FPGA. (Error Number : 36)

View 2 Replies View Related

Cisco Switching/Routing :: Connect IBM BladeCentre Switches With Nexus 2k Module?

Dec 18, 2012

We are looking forward to implement IBM BladeCentre Swiches connectivity with Nexus 2k module.I would like to brief you about my network over as follows:
 
Coreswitch :  6513  ( Layer 3 switch + Spanning Tree root)
 Nexus 5010  : Layer 2 switch 
 Nexus 2k  10G ports based module.
 
Currentl Solution : we want to connect the IBM Blade Switches (4) as demonstrated in the attached diagram which will be connected to Nexus 2k module as Ether-channel Access port.
 
Initially we been proposed by our vendor with this design and Now vendor is recommending us to connect the Blade switch etiher to Nexus 5k switch or directly to 6513 core-switches instead of Nexus 2k modules as they say Nexus 2k modules are only to connect the Edge devices .
 
We do not have ports available on Nexus 5010 to connect the cables from IBM Blade Centre Switches. Otherthan that, incase if we go ahead and connect the IBM Blade switches as access ether-channel access port with Nexus 2k module what are consequences we have to face realted Spanning tree or any other.

View 3 Replies View Related

Cisco Switching/Routing :: Nexus 7000 Module Powered-dn Status

Jun 4, 2013

One of our Nexus 7000 modules failed and generated the status below. Could this possibly be a hardware issue? 
  
# show module 
Mod  Ports  Module-Type                         Model              Status
---  -----  ----------------------------------- ------------------ ---------- 
1    0      10 Gbps Ethernet XL Module                             powered-dn
Mod  Power-Status  Reason
---  ------------  ---------------------------
1    powered-dn     Unable to power up card (Power_OK not set)

View 4 Replies View Related

Cisco Switching/Routing :: Nexus 7000 10Gig Card Not Seeing Transceiver Module?

Nov 13, 2011

I'm unable to get the N7K-M108X2-12L 10 Gbps Ethernet XL Module within our Nexus 7009 chassis to recognise the individual X2-10GB-SR transceiver modules. I have the same issue on another 7009 chassis.If I perform a 'show interface'. I get the following output saying SFP not inserted.
 
-Ethernet3/5 is down (SFP not inserted)
-Dedicated Interface
-Belongs to Po51
-Hardware: 10000 Ethernet, address: 7081.0599.d458 (bia 7081.0599.d458)
 
I also get the same result if I issue the following command.  Are their any additional features I need to enable? or would this be a license issue?
Have already tried different X2-10GB-SR modules, reloading the card, re seating the card. [code]

View 6 Replies View Related

Cisco Switching/Routing :: Nexus 7K 6.1 Code And F2 Series Module - How To Enable Priority

Jul 7, 2012

I have a 7K running 6.1 code, on F series line cards. I  need to set it to prioritise DSCP EF marked traffic, that's all at this stage, but am  unclear on the configuration steps required. The packets will already be  marked, I just need to ensure they end up in a priority queue.

View 2 Replies View Related

Cisco Switching/Routing :: Nexus 55548UP - 1GE SFP Module Not Recognized In Fabric Extender

Oct 17, 2012

we installed copper and fiber sfp modules in the 2232PP and none would link up. we pulled the sfp modules out and entered the speed 1000 command and re-inserted the module with no success. the same sfp modules works fine in every other cisco device. we must be missing something. running latest nx-os software.
 
COH-Nexus-02# sh int Eth101/1/1 status
--------------------------------------------------------------------------------
Port          Name               Status    Vlan      Duplex  Speed   Type
--------------------------------------------------------------------------------

[Code].....

View 4 Replies View Related

Cisco Switching/Routing :: Can 10Gbase SFP+ Module Support 1GB Traffic On Nexus 5596T

Mar 20, 2013

Can 10Gbase SFP+ module support 1GB traffic on a Nexus 5596T.
 
The module for 10Gb is Cisco SFP-10G-SR. My scenario is connecting the 10GB SFP+ module to an access switch 1GB fiber uplink, will this work?

View 6 Replies View Related

Cisco Switching/Routing :: Connect ASA 5550 To Nexus 7K F2 Module Using Twinax Cable?

Mar 24, 2012

can we connect ASA 5550 to Nexus 7K F2 module using twinax cable?

View 4 Replies View Related

Cisco Switching/Routing :: Nexus 7000 Voice Traffic Across Trunk Terminated On F1 Module

Oct 31, 2012

 I want to prioritize egress voice traffic across a trunk terminated on an F1 module,  N7K-F132XP-15. I am unsure about the setup; according to the "show interface capabilities" F1 interfaces support 8 egress queues, while the Nexus QoS documentation provides configuration referencing 4 queues. In addition, I am not clear about the relevance of network-qos on F1 queueing setup.

View 1 Replies View Related

Cisco Switching/Routing :: 3750 - Adding New Switch To Stack With Different IOS

Sep 12, 2012

We have a WS-C3750G-24PS switch running 12.2(50)SE , C3750-IPBASEK9-M in production & stand alone and we want to ask a new Cisco WS-C3750-24P running 12.2(55)SE3 , C3750-IPBASEK9-M into the stack with the 1st one.
 
Just want to know if it is possible and are there any problems with the IOS being different version.

View 8 Replies View Related

Cisco Switching/Routing :: Can't (write Mem) After Adding 3rd 3750E Switch

Mar 10, 2008

After I added the 3rd 3750E to my stack on Sunday I can no longer save my configs with  'copy run start' or 'write mem':
 
#copy running-config startup-config
Destination filename [startup-config]?
Building configuration... 
nv_done: unable to open "flash:/config.text.new"
nv_done: unable to open "flash:/private-config.text.new"
nv_done: unable to open "flash:/multiple-fs.new"[OK]

[code]....
 
my flash seems to have plenty of space:

57409536 bytes total (24203776 bytes free)

View 4 Replies View Related

Cisco Switching/Routing :: Adding A New Switch In Existing Two 3750 Stack

Mar 25, 2012

in our network we were using three 3750-48-s switches with stacking one of the switch due to some hardware failure power problem,
 
now i want to add a new switch 3750-48-s in the existing Stack two switches , the old two switches ios version is = 12.2(25r)SEC the new Catalyst 3750 io verion is =   12.2(35)SE5
 
how to add this switch in the existing two stack switches , with documentation

View 1 Replies View Related

Cisco Switching/Routing :: Adding 3750 Switch To Existing Stack?

Nov 23, 2011

I am looking to add a new 3750 Switcch to an existing stack shown below
 
Switch   Ports Model             SW Version             SW Image
------   ----- -----             ----------             ----------
*   1   26     WS-C3750-24P       12.2(35)SE5             C3750-IPBASE-M
     2   26     WS-C3750-24P       12.2(35)SE5             C3750-IPBASE-M
     3   26     WS-C3750-24P       12.2(35)SE5             C3750-IPBASE-M

[code]....
 
I have looked on notes to add a switch to an existing stack and haven’t identified answers on how the IOS will be affected on the new switch – will it downgrade to the current stack version or will the current stack upgrade to its version. At this moment in time I would prefer if the new switch IOS downgraded to the current stack IOS version.The new switch is a 3750V2 – will this affect how it joins the stack?The new switch has the image of IPBASEK9-M – again will this affect how it joins the stack?

View 5 Replies View Related

Cisco Switching/Routing :: Adding New Switch To Existing C3750x Stack?

Dec 6, 2012

I am having an issue with adding a c3750x switch to an existing switch stack Currently there is 2 x WS-C3750X-48P and I am trying to add another WS-C3750X-48P to this switch I have cabled the switch to the stack using the stack cables and added the command to provision the switch on the exisitng stack.  However when I turn the switch on it just goes on its own stack.
 
I noticed the new switch had a later version of IOS so have downgraded this to the same version as the other switches but still no joy Here is the sh ver from the exisitng stack
 
uptime is 4 weeks, 4 days, 23 hours, 30 minutes
 System image file is "flash:/c3750e-universalk9-mz.122-53.SE2/c3750e-universalk9-mz.122-53.SE2.bin"
License Level: ipbaseLicense Type: PermanentNext reload license Level: ipbase
cisco WS-C3750X-48P (PowerPC405) processor (revision A0) with 262144K bytes of memory.Processor board ID FDO1448Z0FJLast reset from power-on21 Virtual Ethernet interfaces1 FastEthernet interface156 Gigabit Ethernet interfaces6 Ten Gigabit Ethernet interfacesThe password-recovery mechanism is enabled.

[code]....

View 3 Replies View Related

Cisco Switching/Routing :: Adding Switch To Existing Stack 3750

Oct 16, 2012

I am attempting to add and Catalyst 3750 - 12 port Gigabit switch to an existing stack of 3750 48 port switches (non-X fabric). I am not sure how to proceed. These are the two questions/thoughts I have. Any additional perspective I should have before proceeding.

What kind of configuration should I apply to the Gig switch before adding it to the stack?I am sure I will need to assign priority to the new switch, ideally, it will act as master.

View 1 Replies View Related

Cisco Switching/Routing :: Ws-c3750g-48ts / Adding Switch To Stack?

Jan 23, 2013

We have a cisco stack with 5 ws-c3750-24p 12.2)55)SE3 c3750-ipbasek9-m switches. Can i add a switch to the stack that is the following model: ws-c3750g-48ts 12.2(25)see3 c3750-ipbase-m

View 3 Replies View Related

Cisco Switching/Routing :: To Reload The Module 3 On The 6509 Switch

Jul 31, 2012

Suffered a big outage on the network, the fix was to reload the module 3 on the 6509 switch, we had these errors on the log %CONST_DIAG-SW1_SP-3-HM_PORT_TEST_FAIL: Switch 1 Module 3 TestUnusedPortLoopback Port(s)[24,46] failed. System operation continues.in the end, we reloaded the card and it was all ok. is there anything I can do to check the card / or any deeper logs? would that error cause the card to crash?

View 1 Replies View Related

Cisco Switching/Routing :: Switch Module Install For 2951?

Sep 3, 2012

Any doc for installing the a PoE switch module for a 2951? I find alot about the 2951 PoE Power supply but nothing for the switch module.

View 5 Replies View Related

Cisco Switching/Routing :: Module Power Down On 6513 Switch?

Apr 28, 2012

We have Communication Media Module (WS-SVC-CMM) mounted on 6513 switch. It went down twice and we brought it up by applying "power enable module".

View 4 Replies View Related

Cisco Switching/Routing :: Setting Up Switch Module On 2951?

Sep 18, 2012

I'm trying to set up a 2951 with a 24 port switch module. I want the ports to act similiarly to the ports on an 881 router - where I assign the VLANs on the router and I set the VLANs to the switchport interfaces.I would like to be able to create the VLANs on the router portion of the 2951 and then, enter the switch module and configure the Ports to the VLANs but, how do I logically connect router to the switch? Is it an internal logical interface - meaning how are the VLANs getting from the router to the switch?

View 24 Replies View Related

Cisco Switching/Routing :: 3750G - Adding Additional Switch And Making It Stack

Feb 29, 2012

I currently have Cisco 3750G which is currently live and active and fully populated and only have remote access.
 
I have an additional same switch which I would like to stack. My initial plans were to have 2 GIbit etherchannels, but I came across the option to Stacks both switch with each other.
 
When I do a show switch on the live switch its set as a Member: [code]

I would like to add the new switch to the stack without losing the config for the switch which is live. I understand that the highest priority of the switches becomes the Master but as the live switch is Priority 1, would chancing this affect the switches config, or would it lose connection at all?
 
Also when I plug in the new switch and it reboot how do I ensure it becomes the slave without rebooting the live switch?The cables on the switch do they have to go to port1 on the live switch and port 1 on the new switch or can they be port 1 and port 2?

View 19 Replies View Related

Cisco Switching/Routing :: GLC T Sfp Module Showing Unspecified In Switch 2960

Mar 6, 2012

We have supplied Cisco Swtch 2960 with gig SFP modules. It is working fine. However, when I do a show inventory it show proper part no. for the switch chassis but for the GLC T module it shows as unspecified in the PID column.

View 1 Replies View Related

Cisco Switching/Routing :: Module Ws-x4548-rj45v+ And 4506 Switch

Oct 4, 2012

I have a problem with a newly bought ws-x4548-rj45v+ i've plugged in the module but when i do show modules all , it show as unsupport
 
Power consumed by backplane : 0 Watts
Mod Ports Card Type                              Model              Serial No.---+-----+--------------------------------------+------------------+-----------1     2  Supervisor IV 1000BaseX (GBIC)         WS-X4515           JAE1048GAXQ2    48  10/100/1000BaseT (RJ45)                WS-X4448-GB-RJ45   JAB064806WN3    48  10/100/1000BaseT (RJ45)                WS-X4448-GB-RJ45   JAB063005DB4     0  Unsupported module                     WS-X4548-RJ45V+    JAE1545056U
M MAC addresses                    Hw  Fw           Sw               Status--+--------------------------------+---+------------+----------------+---------1 0007.0e64.f880 to 0007.0e64.f881 5.2 12.2(20r)EW1 12.2(46)SG       Ok2 000b.5fa4.da20 to 000b.5fa4.da4f 1.0                               Ok3 0009.e844.d760 to 0009.e844.d78f 1.0                               Ok4 ccef.4815.9bf0 to ccef.4815.9c1f 2.0                               Unsupport

View 2 Replies View Related

Cisco Switching/Routing :: 4 And 8 Port Switch Module In 1941 Router

May 23, 2013

My questions is can a 4 port PoE switch module (EHWIC-4ESG-P) and a 8 port switch module (EHWIC-D-8ESG) be used at the same time in a Cisco 1941 router?

View 1 Replies View Related

Cisco Switching/Routing :: 2811 With 16 Port Switch Module Configuration?

May 12, 2013

I have a laptop with a single physical NIC which I have used the advanced management tools to create two virtual NICs (say vlan 10 and vlan 20) and both are on the same subnet (say 192.168.4.x). One NIC is for normal TCP/IP traffic and one is for broadcast/multicast traffic (I have some custom software that requires this to be the case and works fine on an older laptops with built-in physical NIC and PCMCIA XIRCOM NIC). The dual NIC laptop communicates with a dual NIC server via a Cisco 2811 router (which has a 16 port switch module at the back) and has vlans set up so.
 
What I want is for the single NIC laptop (with two virtual NICs) to be able to also communicate with the server. Basically, one NIC is for normal traffic and one is for multicast/broadcast traffic. All three machines need to be able to talk to each other using the NIC for normal traffic and both laptops must be able to receive broadcasts from the server. What is the best way to configure the router to handle the trunking/tagging? Most configuration documentation I read has two complete subnets for the two virtual NICs. Note that all three machines use static IPs and are part of a workgroup so no DNS and domain servers etc.

View 9 Replies View Related

Cisco Switching/Routing :: VSS Switch Got Hang After Inserting 6708 Module?

Jan 11, 2012

We having a VSS switch (9 slot chasis) with ios "s72033_rp-ADVENTERPRISEK9_WAN-M), Version 12.2(33)SXI4", slot 7-9 are currently free. We wanted to install WS-X6708-10G-3C module on slot 7. Once we installed the module it didnt come, after waiting for 15-20min again we removed and inserted, but module didnt come up and we could see following logs on the console:
 
Jan 12 08:57:40.146: %ISSU-SW2_CFC2-3-ERP_AGENT_SEND_MSG: client/entity send failed; error code is timeout
*Jan 12 08:57:40.330: %ISSU-SW2_SPSTBY-3-ERP_AGENT_SEND_MSG: client/entity send failed; error code is timeout
Jan 12 08:57:40.146: %ISSU_ERROR-SW2_CFC2-3-START_NEGO_FAILED: ISSU NTI Client(2040): failed to start negotiation (ISSU_RC_CLIENT_ENTITY_DOES_NOT_EXIST_IN_PEER)

[code]....

Afer some time VSS switch didnt response to console commands and all the users in access switches were not able to reach the gateway (VSS). Then the problem disappeared once we rebooted both the switches in VSS.why the VSS switch become non-responsive?

View 1 Replies View Related