We have Communication Media Module (WS-SVC-CMM) mounted on 6513 switch. It went down twice and we brought it up by applying "power enable module".

View 4 Replies


ADVERTISEMENT

Cisco Switching/Routing :: 6513 Switch Giving Module 11 In Power Down State

Apr 7, 2012

After a power problem at our data centre we find Module 11 of our Cisco 6513 Core Switch in PWR Down state.Show Module 11 returns: Status: PWRDownShow Power Status Module 11 returns: OperStatus Off (Module Reset due to an exception or user request).The command:
Power enable Module 11 was issued and returned the following:  %PM_SCP-SP-1-LCP_FW_ERR: System resetting module 11 to recover from error: Linecard received system exception. Errcode = 2509000001.%OIR-SP-3-PWRCYCLE: Card in module 11 is being powercycled Öff (Module reset due to exception or user request%C6KPWR-SP-4-DISABLED: Power to module in slot 11 set off (Module Reset due to exception or user request),We have restarted the switch twice. The module is currently not passing traffic causing downtime to services.

View 6 Replies View Related

Cisco Switching/Routing :: Replacing A Dual Supervisor Module In A 6513 Switch?

Jun 18, 2012

I have a supervisor blade, (VS-S720-10G-3C), in a 6513 that is faulty and needs replaced. Do I need to replace the IOS on the new supervisor blade to make sure it is the same as the IOS image that is on the Active supervisor module, or will it synchronize automatically?
 
In the synchronization process, the active supervisor engine checks  the  standby supervisor engine run-time image to make sure that it  matches  its own run-time image. The active supervisor engine checks  three  conditions:
 
#
•If it needs to copy its boot image to the standby supervisor engine
#
•If the standby supervisor engine bootstring needs to be changed
#
•If the standby supervisor engine needs to be reset
 
 I was reading the above documentation that mentioned the active supervisor should copy the image if it detects a newly installed standby supervisor blade with a different image, is this correct or was it referring to synchronizing the configuration file?

View 3 Replies View Related

Cisco Switching/Routing :: Catalyst 6513 NAM Module

Aug 24, 2012

i have a cisco Netowtk Analysis module installed on a 6513 core  switch which is NAM-1, the version on the NAM is 5.1 and we need to  upgrade to the latest version which is 5.1(2)

View 1 Replies View Related

Cisco Switching/Routing :: 6513 Moving LACP Ports To Another Module

Mar 20, 2012

I have a Cisco 6513 switches connected to HP VC Flex 10 Module.  The (2) 10Gb ports on a Cisco Switch connected to VC Flex-10 in LACP mode.
 
I need to move those (2) 10Gb ports on Cisco Switch 10Gb Module to a different 10Gb module on a same Switch without bringing the ports down since it is a live environment.
 
What I would do is to configure a same port channel ID on a new 10Gb module and then move port one by one. unplug one port and connect to the new port on a module. While I will be unplugging the first port the other active port will keep sending traffic and as soon as I plug in on another port, both ports will be active.

View 1 Replies View Related

Cisco Switching/Routing :: Catalyst 6513 - FWSM Module Configuration

Dec 20, 2007

My company has acquired a Catalyst 6513 with a FWSM module installed on it. I have been reading lot of documentation on [URL], but still have some problems configuring the FWSM:
 
The 6513 has 10 SVIs configured, each of them with an IP address. These 10 SVIs are binded to 10 VLANs which I need to secure. These SVIs are used for routing all the Inter-VLAN traffic inside the switch. The documentation says it is recommended to use just one SVIs for connecting the switch to the FWSM, although you can use more than one using the command "firewall multiple-vlan-interfaces". I don't want to use this command because it seems a pretty more difficult configuration, since you have to use policy routing after using this command (or that is, at least, what documentation says).
 
When I try to "send" to the FWSM more than one VLAN that are configured as SVIs on the switch I get this error message:
 
"No more than one svi is allowed, command rejected."

If I delete the IP address of those SVIs, then I can to "send" those SVIs to the switch with no problem at all. But I need the SVIs to have IP address configured, since they are needed for routing Inter-V LAN traffic.
 
So, the question is: how can I route all the inter-VLAN traffic using just one SVI on the switch? Should I use the FWSM for inter-VLAN traffic routing?

View 15 Replies View Related

Cisco Switching/Routing :: Catalyst 6513 - Error / Module Failed SCP Download

Dec 8, 2012

I have a Cisco catalyst 6513 with sup720-3bxl and WS-X6724-SFP modules , the switch was working fine until yesterday ,but after a maintenance the modue WS-X6724-SFP failed to bring online , the error code is (Module  Failed SCP dnld) does it mean the module has hardware problem or i need to replace it ?

-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
ios version
s72033-adventerprisek9_wan-vz.122-33.SXH7.bin
-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
show module
Mod Ports Card Type
Model           

[code]....

View 3 Replies View Related

Cisco Switching/Routing :: 6513 Power Showing Wrong Wattage?

Oct 26, 2011

I just upgraded my power supply's from 2500Watts to 4000watts, however the show power still shows 2500watts.how do i make the 6513 recongize the change? I do have 250volts at 30 amps connected to each power supply.
 
system power redundancy mode = redundant
system power total =     2331.00 Watts (55.50 Amps @ 42V)
system power used =      1741.74 Watts (41.47 Amps @ 42V)
system power available =  589.26 Watts (14.03 Amps @ 42V)

[code]...

View 1 Replies View Related

Cisco Switching/Routing :: 6513 - Mod 9 Recycling Power - 10 Gig 6704 Card

Feb 26, 2012

I have 2 6513's between floors that have a port channel between them using 2 10 gig interfaces on 6704 cardsThis weekend I lost the port channel for about 4 mins and then it came back up. Unfort at the time I had logging turned off so was unable to get any info as to why. But I turned on debugging that eve and this morn it happened again.
 
Looks like Mod 9 is being power recycled, 6704 is about a year old and had been running for a month or so without issue.The only thing I have upgraded in the last few weeks was I put in a pair of 6000w supplies..But I am not having any other issuesother than mod 9. In hind sight a better design would be to spread this port channel across 10 gig cards. I'll work on that next.
 
2w2d: %OIR-SP-3-PWRCYCLE: Card in module 9, is being power-cycled 'Off (Module Reset due to exception or user request)'2w2d: %C6KPWR-SP-4-DISABLED: power to module in slot 9 set Off (Module Reset due to exception or user request)*Mar 1 00:00:02.331: DaughterBoard (Centralized Forwarding Card)

[Code].....

View 3 Replies View Related

Cisco Switching/Routing :: 8700W Enhanced AC Power Supply With 6513 Chassis

Mar 6, 2013

I understand that 8700W enhanced AC power supply is Compatible with 6-, 9-, and 13- slot chassis
 
Based on 8700W Enhanced PS datasheet, it can be installed into existing Cisco Catalyst 6500 Series Switch chassis: both E- and non-E series Cisco Catalyst 6500 Series Switch chassis.

Can we use 8700W enhanced AC power supply with 6513 externally / internally (within one of the chassis slots like 6513-E ?

View 1 Replies View Related

Cisco Switching/Routing :: PoE Error On 6500 / Inline Power Module

Feb 12, 2012

Cisco IP phones attached to a Moduke in one of my Cat6500 access Switches suddenly went down. Upon closer  inspection of the Switch Sys log, I observed the following Sys log error messages:   [Module 9 is experiencing the following error: Inline Power Module - PS Voltage bad. ]A sh Mod output indicates the PoE daughter card and Main Module are "ok" - see attached output. It appears issue is related to the the actual Power Supply module and not the blade module and installed PoE Daughter card. I am inclined to open a TAC case for a PS replacement, but wanted to see if this can be resolved without a hardware replacement. At this time all 48 IP phones attached to this module are out of Service.

View 2 Replies View Related

Cisco Switching/Routing :: 6513 - Switch To SP Mode After Reboot

Mar 20, 2013

Need your expert input in sorting out the below problem.I have a cisco 6513 switch which is going into SP mode after a reboot whci i have done during BCP activity in my organization.Below are the log for your reference.
 
Code...

View 1 Replies View Related

Cisco Switching/Routing :: 6513 Switch Boot To ROMmon

May 9, 2012

i have a Cisco 6513 it is used one, i have tryed to boot it but it did not work, it alwayes go to rommon mode and i am not able to know what is the issue,
 
when it boot i get the below outpot from the switch.
 
System Bootstrap, Version 8.1(3)
Copyright (c) 1994-2004 by cisco Systems, Inc.
Testing lower main memory - data equals address

[Code].....

View 3 Replies View Related

Cisco Switching/Routing :: 2960 / 6513 - Multicast Between VRF On Same Switch

Sep 3, 2012

I am working on Multicast scenario, There is one 6513E switch one 2960 switch. Two VRF's are configured in core switch (6513) IPTV-SRV and Villa-VRF IPTV-SRV vrf has IPTV server and Villa-VRF has IPTV i.e. client.
 
V LAN 30 is mapped to IPTV-SRV vrf with subnet address 192.168.30.0/24
V LAN 12 is mapped to Villa-VRF with sub net address 192.168.12.0/24
 
I did the following configuration for VRF but its not working . i am not an expert in multicast design but seems i did most of the configs.
 
ip vrf IPTV-SRV
rd 30:1
mdt default 232.1.1.1
route-target export 30:1
route-target import 10:1
[code]...

View 3 Replies View Related

Cisco Switching/Routing :: Error In Logging Observed On 6513 Switch

Jul 15, 2012

I have been getting the logs in my cisco 6513 switch [code] On further investigating in the module 9 which has a DFC card also , we found the source of this error whether it is a source of any upcoming potential impact or can be simply ignored

View 3 Replies View Related

Cisco Switching/Routing :: Configuring Span Port On 6513 Switch

Mar 2, 2012

I have two servers, connected on two(Different) 6513 directly connected switches. Both these servers are in the same Vlan.
 
I have to monitor communication these two servers. I have a system connected on one of the 6513 switch, where network tool wireshark is installed.
 
How to configure span port.
 
switch 6513-1# show run int Gi10/43  --------------------Server 1 is connected
 
switch 6513-2# show run int Gi9/45 ------------------------Server 2 is connected
 
switch 6513-2# show run int Gi9/46 ------------------------System on which network tool wireshark is installed.

View 9 Replies View Related

Cisco Switching/Routing :: SFP 10G-LR Module Data Sheet Shows Two Values For Transmit Power

Jun 2, 2013

I am using 10Gig link to connect distribution and access switches. Since we are terminating the cables at multiple locations, we are also doing the link budgeting. The CISCO SFP 10G-LR module data sheet shows two values for the transmit power one of which is maximum power .5dBm and another is minimum power -8.2 dBm. Which value should I choose for the link budgeting.

View 1 Replies View Related

Cisco Switching/Routing :: 6513-E / 6513 And WS-X6748-GE-TX Compatibility

Oct 29, 2012

we have a chassis 6513-E and a module WS-X6748-GE-TX, I'd like to know if could I put this module in any slot, since the documentation from Cisco says that any slot from a chassis 6500-E Series can support this module. And then in the documentation of WS-X6748-GE-TX says that this module is not compatible in the slots 1-8 of the 6513 chassis, only from 9th to 13th slots, in those slots from the 6513-E we already have 4x WS-X6748-GE-TX, and we'd like to know if could we put the module in the rest of the slots. The 6513, and 6513-E is kind of confusing.

View 4 Replies View Related

Cisco Switching/Routing :: Added X6704 Card To 6513 Switch / Not Working Correctly

Mar 7, 2012

I just added a X6704 card to our 6513 switch, and it is not working correctly. We are running 12.2(33)SXI5. [code]

View 5 Replies View Related

Cisco Switching/Routing :: Limit For Creation Of Port Chanel In Core Switch 6509 And 6513

Feb 20, 2012

How much is the limit for the creation of PortChanel in a Core Switch 6509 and 6513?Is there a limitation byu hardware?

View 7 Replies View Related

Cisco WAN :: 2911 - Switch Module With POE Doesn't Give Any Power Out

Nov 7, 2011

We got a new Cisco 2911 router (CISCO2911/K9) with a switch module (SM ES2-16-P) on it. Everything works fine after the configuration except for the power. We got 4 WAP that we will connect to the switch module that needs power. So the switch module with POE doesn't give any power out.

[code]....

View 2 Replies View Related

Cisco Switching/Routing :: To Reload The Module 3 On The 6509 Switch

Jul 31, 2012

Suffered a big outage on the network, the fix was to reload the module 3 on the 6509 switch, we had these errors on the log %CONST_DIAG-SW1_SP-3-HM_PORT_TEST_FAIL: Switch 1 Module 3 TestUnusedPortLoopback Port(s)[24,46] failed. System operation continues.in the end, we reloaded the card and it was all ok. is there anything I can do to check the card / or any deeper logs? would that error cause the card to crash?

View 1 Replies View Related

Cisco Switching/Routing :: Switch Module Install For 2951?

Sep 3, 2012

Any doc for installing the a PoE switch module for a 2951? I find alot about the 2951 PoE Power supply but nothing for the switch module.

View 5 Replies View Related

Cisco Switching/Routing :: Setting Up Switch Module On 2951?

Sep 18, 2012

I'm trying to set up a 2951 with a 24 port switch module. I want the ports to act similiarly to the ports on an 881 router - where I assign the VLANs on the router and I set the VLANs to the switchport interfaces.I would like to be able to create the VLANs on the router portion of the 2951 and then, enter the switch module and configure the Ports to the VLANs but, how do I logically connect router to the switch? Is it an internal logical interface - meaning how are the VLANs getting from the router to the switch?

View 24 Replies View Related

Cisco Switching/Routing :: GLC T Sfp Module Showing Unspecified In Switch 2960

Mar 6, 2012

We have supplied Cisco Swtch 2960 with gig SFP modules. It is working fine. However, when I do a show inventory it show proper part no. for the switch chassis but for the GLC T module it shows as unspecified in the PID column.

View 1 Replies View Related

Cisco Switching/Routing :: Module Ws-x4548-rj45v+ And 4506 Switch

Oct 4, 2012

I have a problem with a newly bought ws-x4548-rj45v+ i've plugged in the module but when i do show modules all , it show as unsupport
 
Power consumed by backplane : 0 Watts
Mod Ports Card Type                              Model              Serial No.---+-----+--------------------------------------+------------------+-----------1     2  Supervisor IV 1000BaseX (GBIC)         WS-X4515           JAE1048GAXQ2    48  10/100/1000BaseT (RJ45)                WS-X4448-GB-RJ45   JAB064806WN3    48  10/100/1000BaseT (RJ45)                WS-X4448-GB-RJ45   JAB063005DB4     0  Unsupported module                     WS-X4548-RJ45V+    JAE1545056U
M MAC addresses                    Hw  Fw           Sw               Status--+--------------------------------+---+------------+----------------+---------1 0007.0e64.f880 to 0007.0e64.f881 5.2 12.2(20r)EW1 12.2(46)SG       Ok2 000b.5fa4.da20 to 000b.5fa4.da4f 1.0                               Ok3 0009.e844.d760 to 0009.e844.d78f 1.0                               Ok4 ccef.4815.9bf0 to ccef.4815.9c1f 2.0                               Unsupport

View 2 Replies View Related

Cisco Switching/Routing :: 4 And 8 Port Switch Module In 1941 Router

May 23, 2013

My questions is can a 4 port PoE switch module (EHWIC-4ESG-P) and a 8 port switch module (EHWIC-D-8ESG) be used at the same time in a Cisco 1941 router?

View 1 Replies View Related

Cisco Switching/Routing :: 2811 With 16 Port Switch Module Configuration?

May 12, 2013

I have a laptop with a single physical NIC which I have used the advanced management tools to create two virtual NICs (say vlan 10 and vlan 20) and both are on the same subnet (say 192.168.4.x). One NIC is for normal TCP/IP traffic and one is for broadcast/multicast traffic (I have some custom software that requires this to be the case and works fine on an older laptops with built-in physical NIC and PCMCIA XIRCOM NIC). The dual NIC laptop communicates with a dual NIC server via a Cisco 2811 router (which has a 16 port switch module at the back) and has vlans set up so.
 
What I want is for the single NIC laptop (with two virtual NICs) to be able to also communicate with the server. Basically, one NIC is for normal traffic and one is for multicast/broadcast traffic. All three machines need to be able to talk to each other using the NIC for normal traffic and both laptops must be able to receive broadcasts from the server. What is the best way to configure the router to handle the trunking/tagging? Most configuration documentation I read has two complete subnets for the two virtual NICs. Note that all three machines use static IPs and are part of a workgroup so no DNS and domain servers etc.

View 9 Replies View Related

Cisco Switching/Routing :: Adding N7KM132XP-12 Module To Nexus 7K Switch

Jul 31, 2012

Trying to find some documentation as to whether there are any other steps for inserting this new module in our N7K. We have 2 blades in already and 2 Sups in 5 & 6. I'm assuming its like the 6500s, where we just slide it in and the OS configures the global parms for it and the default VLAN.

View 2 Replies View Related

Cisco Switching/Routing :: VSS Switch Got Hang After Inserting 6708 Module?

Jan 11, 2012

We having a VSS switch (9 slot chasis) with ios "s72033_rp-ADVENTERPRISEK9_WAN-M), Version 12.2(33)SXI4", slot 7-9 are currently free. We wanted to install WS-X6708-10G-3C module on slot 7. Once we installed the module it didnt come, after waiting for 15-20min again we removed and inserted, but module didnt come up and we could see following logs on the console:
 
Jan 12 08:57:40.146: %ISSU-SW2_CFC2-3-ERP_AGENT_SEND_MSG: client/entity send failed; error code is timeout
*Jan 12 08:57:40.330: %ISSU-SW2_SPSTBY-3-ERP_AGENT_SEND_MSG: client/entity send failed; error code is timeout
Jan 12 08:57:40.146: %ISSU_ERROR-SW2_CFC2-3-START_NEGO_FAILED: ISSU NTI Client(2040): failed to start negotiation (ISSU_RC_CLIENT_ENTITY_DOES_NOT_EXIST_IN_PEER)

[code]....

Afer some time VSS switch didnt response to console commands and all the users in access switches were not able to reach the gateway (VSS). Then the problem disappeared once we rebooted both the switches in VSS.why the VSS switch become non-responsive?

View 1 Replies View Related

Cisco Switching/Routing :: Switch To C6500E Backbone Without Getting Network Module

Apr 16, 2013

can i use any downlink port of the C4500-X switch as uplink without the need of the network module?i need to connect that switch to C6500E backbone without getting the network module, is that OK or i must get the network module?

View 1 Replies View Related

Cisco Switching/Routing :: How Switch Module Works In 2911 Router

Sep 4, 2012

how this switch module works in 2911 router? I have two 2911 routers in HSRP configuration for redundancy with crossover cable between switch modules. OSPF running on routers.If active router loses its power and then comes back again, it boots first, its internal link to switch module comes up and it starts to forward packets to switch module. The switch module starts to boot only after router is ready. So I have outage of about 3-4 minutes. For our real-time applications it is way too long.

any way to start booting of the switch module before router gets ready?I understand I can boot it manually, but it is only after router is ready. Only way to get around it I found is to disable internal link and use router interface to connect to the switch module.

View 1 Replies View Related

Cisco Switching/Routing :: 2960 Switch Hanging With SFP Module Slots

Sep 2, 2012

My Cisco 2960 Switch hanging problem (does not work or LED light), when i removed SFP  module slots its working fine.

View 1 Replies View Related