Suffered a big outage on the network, the fix was to reload the module 3 on the 6509 switch, we had these errors on the log %CONST_DIAG-SW1_SP-3-HM_PORT_TEST_FAIL: Switch 1 Module 3 TestUnusedPortLoopback Port(s)[24,46] failed. System operation continues.in the end, we reloaded the card and it was all ok. is there anything I can do to check the card / or any deeper logs? would that error cause the card to crash?
View 1 Replies
ADVERTISEMENT
Mar 9, 2013
We have a backup sup 720 which has a 2 gigabit ethernet though port channel, to another chassis. Suddenly UDLD detected an error and got into err disable, then this err disable didn't let the interface set to DOWN, and created a switch loop, then our Supervisor reloaded. I'd like to know what could have caused this reload. In my opinion could have a been the switch loop, but also I've been checking from the output interpreter the show tech and might have been a bug, the only one that could match in IOS version 12.2(33)SXH, is this one: url...
We're going to disable err-disable next time I guess and recover the link manually, apart from that what could have made the sup for crash and reload?
View 4 Replies
View Related
Jan 1, 2012
We had an power shutdown activity last week, due to which one of the core switch was turned off and ON .After the core switch was turned ON, we had found some of the ACLs missing which were bounded in VLANs. We had given write command before this power shutdown activity.We need to find the root cause for the same.
Switch Model-WS-CISCO-6509-E.
View 3 Replies
View Related
Dec 15, 2012
while i am configuring a port on switch .The switch reloads.After reload the show version says
System returned to ROM by bus error at PC 0x458F6C, address 0x0
show version from the effected switch is
Cisco IOS Software, C3750E Software (C3750E-UNIVERSALK9-M), Version 12.2(58)SE2, RELEASE SOFTWARE (fc1)
Technical Support: [URL]
[cODE].....
View 2 Replies
View Related
Sep 12, 2010
I have the following problem with
Situation:
- 2x 3750G-12S Distribution-Switches (DS) and several 3560/2960 Access-Switches (AS)
- redundant Fiber optic uplinks between AS and DS
- Cross-Stack Etherchannel config on all uplinks
- UDLD aggressive mode configured on all uplinks
Problem:
- when I reload the DS and the switch comes up again, I've lost the connection with several (not all) AS
- looking at the AS log I found the following error message: "%UDLD-4-UDLD_PORT_DISABLED: UDLD disabled interface Gi0/1, aggressive mode failure detected"
Cause:
- in the log of the AS I don't see intf Gi0/1 go down during the reload of the DS
- this means the DS didn't shuts down all its ports during the reload
- but this also means that UDLD on AS didn't know about DS reload, and therefore didn't resets counters
Workaroud/Solution
- I'm now configuring errdisable recovery on all AS
So I'm forced to configure errdisable recovery, even if I don't want.
View 3 Replies
View Related
May 3, 2013
I am not able to find the exact bug for Cisco 3750E stack - Debug Exception (Could be NULL pointer dereference) Exception (0x2000) error. Closest i can find is CSCsa72400 which only affects ver 12.2(20)SE4.All the stacks (3 switches) are running 12.2(50)SE3, It appears that the switch 1 crashed and reloaded. My hunch is its software but i cant find any related bugs. It could be hardware issue as well ?
View 4 Replies
View Related
Apr 5, 2012
I have just upgraded 2 3750 switches in a stack via the master and reloaded the master switch remotely, how can I reload the 2nd (member) switch?
View 16 Replies
View Related
Nov 7, 2011
I uploaded a new config file via TFTP to a 3560 switch. What are the order of commands to get it to boot from this new config file instead of the file listed in 'sh boot': [code]
View 7 Replies
View Related
Sep 10, 2012
I have a pair of 6509-E Switches running VS-720 Supervisors. We are planning to add Ace Module onto the 6509-E. Will IP Base Image suffice the requirement? Will Ace Module work with only IP Base Image?
View 1 Replies
View Related
Mar 4, 2012
I have a switch Cisco WS-C6509-E WS-X6716-10G-3C module ( module for 10 GB) , i have the IOS s72033-ipservicesk9-mz.122-18.SXF9.bin. I want to know if this IOS can support this module or not ? or , if i must do a upgrade , is that the IOS : "s72033-ipservicesk9_wan-mz.122-33.SXH8" work fine ?
View 7 Replies
View Related
Apr 22, 2012
I have one 4506E switch working in Lan setup as a core switch with WS-X45-SUP6L-E running ipbase IOS 12.2(54)SG1. Each time after reload the switch we found that the clock is getting reset ( time is getting changed ) where as day, date & year is unchanged.
View 2 Replies
View Related
Apr 1, 2013
I have a cisco 6509 (ws-c6509-e) IOS 12.2.(18)SXF6 with the following modules and submodules: [code] I would like to add another module, I have WS-6816-GBIC or WS-6516-GBIC which one will work with my 6509 ? The 6509 has four module slots empty: 4-7-8-9, Can I add the card in one of these slots ?
View 10 Replies
View Related
Oct 21, 2012
How I can shutdown a module when I am running vsl.I can use the following command #hw-module module 2 shutdown.As I have modules in both switch 1 and switch 2 how can I ensure I only shut down module 2 in switch 1.
View 1 Replies
View Related
Mar 17, 2012
We have a VSS environment with two Cisco 6509-Es. IOS image:s72033-ipservicesk9_wan-mz.122-33.SXI5 when I switch on or reload the Core switches(VSS), I find a Minor Error in the "Show module switch all" command.I also did a "show diagnostic result switch 1 module 5"Switch 1 Module 5: Supervisor Engine 720 10GE (Active) SerialNo : SAL1521E035
Overall Diagnostic Result for Switch 1 Module 5 : MINOR ERROR
Diagnostic level at card bootup: complete
Test results: (. = Pass, F = Fail, U = Untested)
45) TestVslLocalLoopback:
Port 1 2 3 4 5
-------------------
U U U . F
This issue temporarily relieves when reseating the X2 module, but reappears after reloading the switch.
View 5 Replies
View Related
Sep 15, 2012
I had a strange issue with one of my customer..Cisco WS-C3750X-48P Access switch was not reachable and after reload it started working.I would like to know the root cause of the issue. There were no logs and no errors in interfaces.Even Cpu utilization was not high. We have enabled arp inspection and dhcp snooping in the switch..Hope this will not make any issue..Also we have dot1x enabled on port..
View 5 Replies
View Related
Jan 7, 2013
We have a requirement to build a datacenter within a datacenter for a new project. The existing Core network is 2 x Cisco 6509 in VSS configuration. We would like to connect the new datacenter to the existing Core switch from the new low-end Core switch. This datacenter would have a SAN network and blader chassis.
Listing the Cisco Switches requirements and expansion module requirements ?
- What expansion module is required at existing 6509 ? Can we have one 10Gibit modules on each switches and crate a port-channel connection from new datacenter core switch ?
- Which model of Switch you recommend for the new Datacenter Core which is only going to have one SAN Enclosure and two blade chassis? Will it be a good option to use 3750E ? If yes do we need any additional modules there ?
- Which aggregation switch should we use for the blade enclosure ?
- Should we have a Cisco Embedded Switch module on the chassis to create trunk with aggregation switch ?
- How the SAN director switch is connecting to the LAN ? should we have any particular module at new Core switch ?
View 0 Replies
View Related
Jun 8, 2011
I m planning to implement VSS in core but want some inputs on IOS as i have FWSM as a service module Core :- Ii am running 12.2(33)SXH2a on my Core 6509 and i checkd cisco sites and Fwsm release notes but it states only I-Train of IOS while mine is H-Train so can I directly upgrade to I-Train or I was thinking of SXH8b IOS.
View 2 Replies
View Related
Oct 4, 2012
We are facing a strange issue, our ACE 20 got failed due to power issue , after RMA once we are installing ACE 20 to 6509 , the status LED is showing ORANGE . The sh module shows it as " Others " ... The IOS is same as it was previously in 6509 .
View 2 Replies
View Related
Dec 7, 2011
We have two 6509 switches with one WS-X6704-10GE module in each of them. There is an optical cable between the two switches plugged in WS-X6704-10GE module on both sides. When you shut down the port on one side the other port still stays as up and you need phisycally to unplug the cable to have it down. The same behaviour is seen no matter on which of the two switches you shut down the port, the opposite one always stays as up and only removal of the cable makes it go down.
The ports are configured quite simply:
interface TenGigabitEthernet1/1
switchport
switchport trunk encapsulation dot1q
switchport trunk allowed vlan 1-10
no ip address
udld port
The IOS version is 12.2(18)SXF8
View 2 Replies
View Related
Sep 18, 2012
We have a design of two 6509 running in a VSS with dual supervisor each having fthree 10/100/1000mb etherner modules. We have diagnosed a wierd problem that none of the switchports in module 1 and 2 on either switches are having layer2/layer 3 connectivity.
Tried everything from changing the cables to changing the end device but no luck with it.
Module results show pass and no errors in the logging.
View 2 Replies
View Related
Sep 3, 2012
Any doc for installing the a PoE switch module for a 2951? I find alot about the 2951 PoE Power supply but nothing for the switch module.
View 5 Replies
View Related
Apr 28, 2012
We have Communication Media Module (WS-SVC-CMM) mounted on 6513 switch. It went down twice and we brought it up by applying "power enable module".
View 4 Replies
View Related
Sep 18, 2012
I'm trying to set up a 2951 with a 24 port switch module. I want the ports to act similiarly to the ports on an 881 router - where I assign the VLANs on the router and I set the VLANs to the switchport interfaces.I would like to be able to create the VLANs on the router portion of the 2951 and then, enter the switch module and configure the Ports to the VLANs but, how do I logically connect router to the switch? Is it an internal logical interface - meaning how are the VLANs getting from the router to the switch?
View 24 Replies
View Related
Mar 6, 2012
We have supplied Cisco Swtch 2960 with gig SFP modules. It is working fine. However, when I do a show inventory it show proper part no. for the switch chassis but for the GLC T module it shows as unspecified in the PID column.
View 1 Replies
View Related
Oct 4, 2012
I have a problem with a newly bought ws-x4548-rj45v+ i've plugged in the module but when i do show modules all , it show as unsupport
Power consumed by backplane : 0 Watts
Mod Ports Card Type Model Serial No.---+-----+--------------------------------------+------------------+-----------1 2 Supervisor IV 1000BaseX (GBIC) WS-X4515 JAE1048GAXQ2 48 10/100/1000BaseT (RJ45) WS-X4448-GB-RJ45 JAB064806WN3 48 10/100/1000BaseT (RJ45) WS-X4448-GB-RJ45 JAB063005DB4 0 Unsupported module WS-X4548-RJ45V+ JAE1545056U
M MAC addresses Hw Fw Sw Status--+--------------------------------+---+------------+----------------+---------1 0007.0e64.f880 to 0007.0e64.f881 5.2 12.2(20r)EW1 12.2(46)SG Ok2 000b.5fa4.da20 to 000b.5fa4.da4f 1.0 Ok3 0009.e844.d760 to 0009.e844.d78f 1.0 Ok4 ccef.4815.9bf0 to ccef.4815.9c1f 2.0 Unsupport
View 2 Replies
View Related
May 23, 2013
My questions is can a 4 port PoE switch module (EHWIC-4ESG-P) and a 8 port switch module (EHWIC-D-8ESG) be used at the same time in a Cisco 1941 router?
View 1 Replies
View Related
May 12, 2013
I have a laptop with a single physical NIC which I have used the advanced management tools to create two virtual NICs (say vlan 10 and vlan 20) and both are on the same subnet (say 192.168.4.x). One NIC is for normal TCP/IP traffic and one is for broadcast/multicast traffic (I have some custom software that requires this to be the case and works fine on an older laptops with built-in physical NIC and PCMCIA XIRCOM NIC). The dual NIC laptop communicates with a dual NIC server via a Cisco 2811 router (which has a 16 port switch module at the back) and has vlans set up so.
What I want is for the single NIC laptop (with two virtual NICs) to be able to also communicate with the server. Basically, one NIC is for normal traffic and one is for multicast/broadcast traffic. All three machines need to be able to talk to each other using the NIC for normal traffic and both laptops must be able to receive broadcasts from the server. What is the best way to configure the router to handle the trunking/tagging? Most configuration documentation I read has two complete subnets for the two virtual NICs. Note that all three machines use static IPs and are part of a workgroup so no DNS and domain servers etc.
View 9 Replies
View Related
Jul 31, 2012
Trying to find some documentation as to whether there are any other steps for inserting this new module in our N7K. We have 2 blades in already and 2 Sups in 5 & 6. I'm assuming its like the 6500s, where we just slide it in and the OS configures the global parms for it and the default VLAN.
View 2 Replies
View Related
Jan 11, 2012
We having a VSS switch (9 slot chasis) with ios "s72033_rp-ADVENTERPRISEK9_WAN-M), Version 12.2(33)SXI4", slot 7-9 are currently free. We wanted to install WS-X6708-10G-3C module on slot 7. Once we installed the module it didnt come, after waiting for 15-20min again we removed and inserted, but module didnt come up and we could see following logs on the console:
Jan 12 08:57:40.146: %ISSU-SW2_CFC2-3-ERP_AGENT_SEND_MSG: client/entity send failed; error code is timeout
*Jan 12 08:57:40.330: %ISSU-SW2_SPSTBY-3-ERP_AGENT_SEND_MSG: client/entity send failed; error code is timeout
Jan 12 08:57:40.146: %ISSU_ERROR-SW2_CFC2-3-START_NEGO_FAILED: ISSU NTI Client(2040): failed to start negotiation (ISSU_RC_CLIENT_ENTITY_DOES_NOT_EXIST_IN_PEER)
[code]....
Afer some time VSS switch didnt response to console commands and all the users in access switches were not able to reach the gateway (VSS). Then the problem disappeared once we rebooted both the switches in VSS.why the VSS switch become non-responsive?
View 1 Replies
View Related
Apr 16, 2013
can i use any downlink port of the C4500-X switch as uplink without the need of the network module?i need to connect that switch to C6500E backbone without getting the network module, is that OK or i must get the network module?
View 1 Replies
View Related
Sep 4, 2012
how this switch module works in 2911 router? I have two 2911 routers in HSRP configuration for redundancy with crossover cable between switch modules. OSPF running on routers.If active router loses its power and then comes back again, it boots first, its internal link to switch module comes up and it starts to forward packets to switch module. The switch module starts to boot only after router is ready. So I have outage of about 3-4 minutes. For our real-time applications it is way too long.
any way to start booting of the switch module before router gets ready?I understand I can boot it manually, but it is only after router is ready. Only way to get around it I found is to disable internal link and use router interface to connect to the switch module.
View 1 Replies
View Related
Sep 2, 2012
My Cisco 2960 Switch hanging problem (does not work or LED light), when i removed SFP module slots its working fine.
View 1 Replies
View Related
Apr 1, 2013
I am trying to use a Tekradius Windows2008 server to aaa authenticate switch admin logins. The Radius server and 6509 loop0 are in a management VRF "netman". I can happily ping to and from the Server and loopback0 interface without issue. I have also tested the radius server account using RadiusNT on a workstation. I get an accept reply with the following variables..
shell:priv-lvl=15
NAS-Prompt
Here are the relevant parts of my config as far as I can see..
aaa new-model
aaa group server radius SRADIUS
server-private 192.168.1.101 auth-port 1812 acct-port 1813 key cisco
ip vrf forwarding netman
ip radius source-interface Loopback0
!
aaa authentication login default group SRADIUS local
[code]...