Cisco Switching/Routing :: 6509 / WS-X6704-10GE Module And Port Status?
Dec 7, 2011
We have two 6509 switches with one WS-X6704-10GE module in each of them. There is an optical cable between the two switches plugged in WS-X6704-10GE module on both sides. When you shut down the port on one side the other port still stays as up and you need phisycally to unplug the cable to have it down. The same behaviour is seen no matter on which of the two switches you shut down the port, the opposite one always stays as up and only removal of the cable makes it go down.
The ports are configured quite simply:
interface TenGigabitEthernet1/1
switchport
switchport trunk encapsulation dot1q
switchport trunk allowed vlan 1-10
no ip address
udld port
After inserting a RSP720-3C-10GE in module 6 and running the show module command display the following [code]what is the meaning of the UnKnown on the oline diag status ?
We had to transport one of our 4948 10 GE to another Data Centre and when we got it there and tried to power up its System Status LED was red and we cannot even get console to the device.
We can try to see if the switch is completely dead and needs replacing or is there something we can do to get it back up and running again?
I would like to know if we can use the following card i.e. WS-X6704-10GE along with SUP-2T which will be configured in VSS.
This line is supported with SUP-2T, however not sure if the sup 2t will be configured in VSS. If any supporting document can be provided for the same , that would be great.
If this is supported than whether i would be getting line rate/non blocking capacity with WS-X6704-10GE. Since SUP-2T provides 80 Gbps bandwidth per slot.
When i swapped a Sup v 10 ge for a Sup6 E Tonight in order to take advantage of the netflow capabilites of the Sup V - It came up with module unsupported for the following cards - WS-X4648-RJ45V-E Will these only work with the Sup6 E or what
We recently installed a WS-X6716-10GE module in slot 6 within a Cisco 6506. We are using two ports on the module (6/13 and 6/14), which are port channeled together to a Nexus 5548. Everything has been running fine for about a month and the card had a green light but the ports stopped communicating. The module was screwed into the chassis/slot. For problem determination reasons, we reconfigured ports 6/13 & 6/14 to 6/15 & 6/16 and moved the cables but the module was still not responding. We eventually pulled the module out of the slot and reinserted the module back into the slot, which reset the module and fixed the problem. Is there any way to determine if this was hardware problem with the module and it should be replaced, or is it a software bug/problem? We opened up a ticket with the TAC but we haven't heard back from them yet.
Cisco WS-C6506-E Cisco IOS Software, s72033_rp Software (s72033_rp-IPSERVICESK9-M), Version 12.2(33)SXI8, RELEASE SOFTWARE (fc2) Mod Ports Card Type Model --- ----- -------------------------------------- ------------------ 5 2 Supervisor Engine 720 (Active) WS-SUP720-3B 6 16 CEF720 16 port 10GE WS-X6716-10GE
I am trying to configure a 6509 as the passive receiver from a Dell Force10 10Ge switch with 2 sfp to 2 gig ports on our 6509 switch, I see LACP is up on both sides but cannot pass traffic, I have only 2 vlans that will carry across the aggregate link from our vmware boxes, this is just a temp until I get a 10ge in our 6509 chassis.
we have Supervisor Engine 720 10GE (VS-S720-10G) in slot 5 on Catalyst 6509-E. Slot 6 is free. We need to replace VS-S720-10G. Is it possible the following scenario
1. we will insert new VS-S720-10G into the slot 6 2. then we will remove the faulty VS-S720-10G from the slot 5
Will everything work without interuptions. Is any document where I can find step-by-step procedure how to replace VS-S720-10G ?
One of our Nexus 7000 modules failed and generated the status below. Could this possibly be a hardware issue?
# show module Mod Ports Module-Type Model Status --- ----- ----------------------------------- ------------------ ---------- 1 0 10 Gbps Ethernet XL Module powered-dn Mod Power-Status Reason --- ------------ --------------------------- 1 powered-dn Unable to power up card (Power_OK not set)
I installed WS-C4506-E 3 day ago. I discovered someting different module status Right at the end of the module ( WS-X4648-RJ45-E ) show red led. this is not port led i try to reset module several time. but it's same status. but this is operating now nomally I upload picture.. and this is module status and diagnostic result
Error code ------------------> 3 (DIAG_SKIPPED)
This Case is DOA(Dead of arrival ?
C4506#sh modChassis Type : WS-C4506-E Power consumed by backplane : 0 Watts Mod Ports Card Type Model Serial No.---+-----+--------------------------------------+------------------+-----------1 6 Sup 7L-E 10GE (SFP+), 1000BaseX (SFP) WS-X45-SUP7L-E ABCDE1234562 24 1000BaseX (SFP) WS-X4624-SFP-E ABCDE123456 6 48 10/100/1000BaseT (RJ45) WS-X4648-RJ45-E ABCDE123456 M MAC addresses Hw Fw Sw Status--+--------------------------------+---+------------+----------------+---------1 b0fa.ebe5.16c0 to b0fa.ebe5.16c5 1.1 15.0(1r)SG3 03.03.00.SG Ok 2 b0fa.ebc6.5b70 to b0fa.ebc6.5b87 1.2 Ok 6 10f3.1197.1490 to 10f3.1197.14bf 2.1 Ok
Is it possible to use a 10GE interface on a sup720 and an interface from a 671610GE line card and create a port channel. I haven't found specific documentation on CCO stating you can. I have found the QOS queuing is differnet between the sup and line card.
I have a pair of 6509-E Switches running VS-720 Supervisors. We are planning to add Ace Module onto the 6509-E. Will IP Base Image suffice the requirement? Will Ace Module work with only IP Base Image?
I have a switch Cisco WS-C6509-E WS-X6716-10G-3C module ( module for 10 GB) , i have the IOS s72033-ipservicesk9-mz.122-18.SXF9.bin. I want to know if this IOS can support this module or not ? or , if i must do a upgrade , is that the IOS : "s72033-ipservicesk9_wan-mz.122-33.SXH8" work fine ?
Suffered a big outage on the network, the fix was to reload the module 3 on the 6509 switch, we had these errors on the log %CONST_DIAG-SW1_SP-3-HM_PORT_TEST_FAIL: Switch 1 Module 3 TestUnusedPortLoopback Port(s)[24,46] failed. System operation continues.in the end, we reloaded the card and it was all ok. is there anything I can do to check the card / or any deeper logs? would that error cause the card to crash?
I have a cisco 6509 (ws-c6509-e) IOS 12.2.(18)SXF6 with the following modules and submodules: [code] I would like to add another module, I have WS-6816-GBIC or WS-6516-GBIC which one will work with my 6509 ? The 6509 has four module slots empty: 4-7-8-9, Can I add the card in one of these slots ?
How I can shutdown a module when I am running vsl.I can use the following command #hw-module module 2 shutdown.As I have modules in both switch 1 and switch 2 how can I ensure I only shut down module 2 in switch 1.
We have a VSS environment with two Cisco 6509-Es. IOS image:s72033-ipservicesk9_wan-mz.122-33.SXI5 when I switch on or reload the Core switches(VSS), I find a Minor Error in the "Show module switch all" command.I also did a "show diagnostic result switch 1 module 5"Switch 1 Module 5: Supervisor Engine 720 10GE (Active) SerialNo : SAL1521E035
Overall Diagnostic Result for Switch 1 Module 5 : MINOR ERROR Diagnostic level at card bootup: complete Test results: (. = Pass, F = Fail, U = Untested) 45) TestVslLocalLoopback: Port 1 2 3 4 5 ------------------- U U U . F
This issue temporarily relieves when reseating the X2 module, but reappears after reloading the switch.
We have a requirement to build a datacenter within a datacenter for a new project. The existing Core network is 2 x Cisco 6509 in VSS configuration. We would like to connect the new datacenter to the existing Core switch from the new low-end Core switch. This datacenter would have a SAN network and blader chassis.
Listing the Cisco Switches requirements and expansion module requirements ?
- What expansion module is required at existing 6509 ? Can we have one 10Gibit modules on each switches and crate a port-channel connection from new datacenter core switch ?
- Which model of Switch you recommend for the new Datacenter Core which is only going to have one SAN Enclosure and two blade chassis? Will it be a good option to use 3750E ? If yes do we need any additional modules there ?
- Which aggregation switch should we use for the blade enclosure ?
- Should we have a Cisco Embedded Switch module on the chassis to create trunk with aggregation switch ?
- How the SAN director switch is connecting to the LAN ? should we have any particular module at new Core switch ?
I m planning to implement VSS in core but want some inputs on IOS as i have FWSM as a service module Core :- Ii am running 12.2(33)SXH2a on my Core 6509 and i checkd cisco sites and Fwsm release notes but it states only I-Train of IOS while mine is H-Train so can I directly upgrade to I-Train or I was thinking of SXH8b IOS.
We are facing a strange issue, our ACE 20 got failed due to power issue , after RMA once we are installing ACE 20 to 6509 , the status LED is showing ORANGE . The sh module shows it as " Others " ... The IOS is same as it was previously in 6509 .
We have a design of two 6509 running in a VSS with dual supervisor each having fthree 10/100/1000mb etherner modules. We have diagnosed a wierd problem that none of the switchports in module 1 and 2 on either switches are having layer2/layer 3 connectivity.
Tried everything from changing the cables to changing the end device but no luck with it.
Module results show pass and no errors in the logging.
I have a cisco 6509 configured with a cisco NAM module. I have reset the config of the NAM module by the config clear command. Since this moment I can't no more ping the NAM module via the management port: OK via the 127.0.0.91 address and log in ok via the ios cli session command. [code] I have already tried to reboot the module via the ios cli hw module command and nothing better.
I've got a pair of N7010's in a vPC domain with some FEX's attach running NX-OS 6.0.2. I am experiencing port failures on my N7K-M132XP-12L module the port got shut down due to internal errors with Error Disabled status and I am not able to bring the port back up. I am getting the following errors when I try to reset it. I am hoping is not hardware related as my vPC peer-link is on this module and I only have a single N7K-M1 32 XP-12L in each N7010. Replacing the module will be painful. [code]
My questions is can a 4 port PoE switch module (EHWIC-4ESG-P) and a 8 port switch module (EHWIC-D-8ESG) be used at the same time in a Cisco 1941 router?
I have a laptop with a single physical NIC which I have used the advanced management tools to create two virtual NICs (say vlan 10 and vlan 20) and both are on the same subnet (say 192.168.4.x). One NIC is for normal TCP/IP traffic and one is for broadcast/multicast traffic (I have some custom software that requires this to be the case and works fine on an older laptops with built-in physical NIC and PCMCIA XIRCOM NIC). The dual NIC laptop communicates with a dual NIC server via a Cisco 2811 router (which has a 16 port switch module at the back) and has vlans set up so.
What I want is for the single NIC laptop (with two virtual NICs) to be able to also communicate with the server. Basically, one NIC is for normal traffic and one is for multicast/broadcast traffic. All three machines need to be able to talk to each other using the NIC for normal traffic and both laptops must be able to receive broadcasts from the server. What is the best way to configure the router to handle the trunking/tagging? Most configuration documentation I read has two complete subnets for the two virtual NICs. Note that all three machines use static IPs and are part of a workgroup so no DNS and domain servers etc.
i have 4507R with dual supervisors (WS-X4013+10GE) with IOS cat4500-ipbasek9-mz.122-46.SG.bin the supervisor module are in 3 and 4, and I want to connection port 5, but i have interface and line protocol down "inactive" error.
So I realized to use command "hw-module" to change the module to GE port. However, I am not able to use the command as" I cannot use the command "hw-module uplink" as well.
We have recently purchased a Cisco 4506 that has several Gigabit Ethernet modules installed.One of the Ethernet Gigabit modules - a WS-X4424-GB-RJ45 - is being picky with who it talks to at Gigabit Ethernet.
If I plug a laptop into one of it's RJ45 ports using a Cat 6 cable, nothing happens. No link light, no notification of link up or down on port statistics, absolutely nothing.If I plug a server into the same port it works fine at Gigabit Ethernet (even using the same Cat 6 cable).I can get the module to recognize a laptop if I fix the speed/duplex on the laptop to 100Mb/Full. I have tried this with other staff laptops from different vendors (HP / Dell / etc.) all with the same result.
The module directly underneath this module - a WS-X4448-GB-RJ45 - works fine for both laptops and servers. We have tried swapping the module positions but to no avail.
I am very new to configuring ports on a switch. My boss usually does the port configurations but I am starting to learn some of the basic commands. The commands I know how to do are; close a port by typing config t, int gi0/port# and typing shut. I know how to enable a port, but how can I add info to a port or copy settings from one port to another?
We have some ports that are configured for 192.168 addresses but most are 10.128 addresses. I need to configure a certain port to be able to receive 192.168 addresses.
I have a 3925 Router with a 48 port switch module (part number SM-D-ES3G-48-P). I have no problem accessing the 3925 Router, but when I go into the 48 port, I get an error that reads
Error Hardware not supported by firmware. Try loading a newer software instead. System Resetting...
I know that the wrong IOS is installed on the switch, but the problem is that this is an endless loop. The switch resets then comes back to the same error. How to get the switch out of this loop so that I can load the correct IOS.
I have a 6500 switch and i recently removed a module (line card) from the switch. The problem is that the port configurations of the removed module still exhists in running configuration. I was not aware of the right procedure,[URL] however, i would like to know whether it resolves if i reboot the switch.