Cisco Switching/Routing :: 3750X Building IP Base And Services Stackable Switches
Jul 30, 2011
I'm building a wired closet to aggregate user's connections, Im planning to have 5x 3750X stacked switches and there is a need to run EIGRP, I'm thinking to order one switch with IP service image while the rest will run IP base image, is it workable scenario and what are the drawbacks of such combination of images ?
View 1 Replies
ADVERTISEMENT
Aug 16, 2012
I'm building a wired closet to aggregate user's connections, Im planning to have 5x 3750X stacked switches and there is a need to run EIGRP, I'm thinking to order one switch with IP service image while the rest will run IP base image, is it workable scenario and what are the drawbacks of such combination of images ?
View 5 Replies
View Related
Jan 23, 2013
How can I Upgrade a Cisco 3750X 12-SFP switch with IP Base to IP Services Image?
View 1 Replies
View Related
Apr 9, 2013
What is the difference between IP Base and Universal for 3750X switches?
View 2 Replies
View Related
May 6, 2012
I have a WS-C3750X-12S-S (IP Services) that I THINK I'd like to downgrade to LAN Base so I can stack it with a WS-C3750X-48T-L that is already LAN Base..
View 4 Replies
View Related
Feb 25, 2012
I have 3750 Switch and need to activate the ipservices on it , it is need a license file to switch from ipbase to ipservices , if i installed the ipservices image from cisco site , do i still need an activation key to use it??
View 7 Replies
View Related
Jul 5, 2012
I would I upgrade this from a LAN base to ip services?
View 2 Replies
View Related
Nov 18, 2011
If I have two stackable switches one switch uplinks to one 6509 core switch and the other connection uplinks to another 6509 core switch, and also the other stackable switch does not connect to the core switches. Because I am using hsrp and also we are not using vss then one uplink to the core is not in used only ones is so then how does creating an etherchannel between does two uplinks to both core switches benefit me in anyway such as more bandwith and using both uplinks at the same time or I'm I wrong?
View 7 Replies
View Related
Nov 14, 2011
If I have two stackable switches were only one stackable switch has two uplinks one uplink goes to one core 6509 switch and the other uplink goes to the other 6509 core switch can a Layer 3 etherchannel be used if each uplink go to a different core switch, by the way hsrp is running between both switches and also can you give an example how data will be routed from the stackable switch through the ethernetchannel to one of the core switch accross the WAN to another core switch?
View 1 Replies
View Related
Jan 7, 2012
The model WS-C3750X-24T-L is only Lan Base. We need this switch to use EIGRP Protocol. Does it exist a License for supportting IP Base o IP Services Feature Set?
View 4 Replies
View Related
Oct 26, 2011
I have been looking to find out the list of features that the IP Base IOS has for the 3750X series switch. What would be ideal is a comparable list but essentially I need to know which of the LAN Base/IP Base/IP Services has SSH functionality.
View 1 Replies
View Related
Sep 9, 2012
Full feature set for IP Base with the 3750x.I just wanted to verify that I could create a routed port, turn ip routing on, and create static routes as well as a default route. From what I can find, there shouldn't be a problem with this on the IP Base Feature Set, I just wanted to verify. Or any link for the Features of IP Base on the 3750x.
View 3 Replies
View Related
Nov 9, 2012
C3750X-24T-S have IP base SW initialy. It is possible to upgrade IP services feature set? BGP routing is needed.
View 1 Replies
View Related
Jul 5, 2012
Are the non-S series 2960 switches stackable or are they only able to be uplinked?
View 6 Replies
View Related
Dec 8, 2012
I am having a ws-3750x-12s-s switch . I want to upgrade it from ipbase to ip service. after installing ip service liciense file, when i gave command " show license detail" i found there 3 index . one is for ip base -active (permanent) ..2nd is for ip service-active(permanent) 3rd is again ip service but inactive( period 8weeks 2days) , then i cleared 1st one by giving command "clear ipbase" and reboot. but still 2 index .both for ipservice one is permanent-active another is inactive . so my question is how can i remove 2nd index which one is inactive and time period for 8weeks and 2days..?? becasue i don't need it. and it will make any problem in future ?
View 2 Replies
View Related
Dec 27, 2012
I have a stack of 2 x 3750X switches these are running 12.2(55)SE5. I needed to add some static IP routes and found that the ‘ip routing’ command is not supported. I came across a document that stated “On switches running the LAN base feature, static routing on VLANs is supported only with Cisco IOS Release 12.2(58)SE and later.” So I have upgraded to 12.2(58)SE2, but ‘ip routing’ is still not a valid command.
The release notes state:“On the Cisco Catalyst 3560-X and 3750-X Series, it adds support for 16 static IPv4 routes in the LAN Base image.”
I have read other posts that talk about running the ‘sdm prefer routing’ command which I have done, but I am still unable to add any routes or run the ‘ip routing’ command.
View 4 Replies
View Related
Jun 23, 2012
I want to be sure for this before ordering: is the Enterprise-class stackable switches "WS-C3750X-48T-S" model can be stackable with "WS-C3750G-48TS" model.
View 5 Replies
View Related
Nov 14, 2011
If I have two stackable switches one that connects to the 6509 core switch and the other switch does not, do I have to uplink the switch to the other switch so that switch has route to the core switch or because the switches are daisy chain there is not need to cable one switch to to the other switch connected to core switch?
View 6 Replies
View Related
Nov 13, 2011
If I have two switches in a stack can both stack able switches be connected to a core switch through gbics or just only one switch can be connected to the core and the other switch connects to the other stack able switch through an Ethernet port which uses as a gateway to the core switch?
View 3 Replies
View Related
Dec 11, 2011
I have a design for my infrastructure and i'm thinking to choose 4 or 5, or more, 2960 series in a stack mode instead of one 4500 series?
View 6 Replies
View Related
May 6, 2013
can you stack a 3750 switch over fiber.....the answer is no, but the virtual switching supervisor 720-10G for the 6500 can create one virtual switch using two 6500s...
how can we get cisco to come up with a way for access switches to be stacked over fiber similar to above supervisor? i know of few of my site that would benefit from this...maybe they can come up with a vss appliance, similar to a media converter, to convert stackwise over fiber...then of course, you would need the same appliance on the other end....
View 3 Replies
View Related
Apr 3, 2011
I'm trying to work out if I need to order the "IP services" image for a couple of C3750-X. I need to run OSPF on these switches, but find the IOS image requirements on Cisco contradict.
At the top of the data sheet it says: • Open Shortest Path First (OSPF) in IP Base image
On the product info page it says: IP Base: Enterprise Access Layer 3 Switching, including OSPF (Open Shortest Path First) for routed access
But in lots of other places it says you need 'IP services' for OSPF.
As the IP services IOS is quite a bit more expensive I would like to avoid buying it. What image do I need to run OSPF?
View 6 Replies
View Related
Feb 6, 2012
We ordered 4x cisco 2960 switch with LAN Lite software by mistake. Can we upgrade them to Lan Base?When I change boot image I get Error: hardware not supported by firmware.
View 3 Replies
View Related
Feb 6, 2012
We are using 18 numbers of 3560X -Lan base series switches in our network(Access layer). We have 400 users and created vlans in access switches. we are planning to purchase Two numbers of 4900 M as Core layer switch and for redundancy. The uplink would be on 10 gig copper cable (CAT 7) between the access layer switches and core switches. I like to know whether 4900M can take the load of 18 access switches.
View 1 Replies
View Related
Mar 28, 2012
1)For 3650X I found some contradiction in the Q&A about feature set LAN Base vs IP Base:
LAN Base: Can I do static IP routing ?
LAN Base: SVI => is this for intervlan routing ?
2)For 2960, there are 2 flavors (LAN lite and LAN BASE) Q: Can I do static routing on one of these flavors ?
View 2 Replies
View Related
Nov 14, 2011
can we upgrade 2960 switch from Lanbase IOS to IPbase
View 4 Replies
View Related
Aug 19, 2012
Can I implement MACsec betwen two Cisoc 3750X using the C3KX-NM-1G? 3750x (C3KX-NM-1G) -------------------MMF------------------(C3KX-NM-1G) 3750x.
View 1 Replies
View Related
Jan 25, 2012
How to get vlans working properly between sub-interfaces on a ASA and a trunk port on a switch.There seems to be issue with the VLAN's being assigned to the correct VLAN and this information being properly sent to the ASA over the trunk.
We seem to be unable to ping most of the interfaces except for one on the switch. Sometimes if we are lucky we are able to ping a host on a different vlan that is on the switch. This seems sparadic at best.
Logs on the ASA show traffic does not seem to be assigned properly to the correct sub interface. We have access rules on the ASA disallowing traffic not part of the same vlan. For example you will see networkA blocked on networkB when it really should be directed through networkA's sub interface.
Any example commands for the ASA and Switch for at least the basic requirements to enable all the VLAN's to communicate properly with the ASA?
View 5 Replies
View Related
Dec 27, 2012
I'm trying to get some clarity on power stacking 3750X switches. I have a new stack of 6 switches. I know I can only have 4 in a power stack and all 6 in the data stack with a max of 8. I'm trying to find the proper way to connect the power stack cables for the 4 switch power stack.
View 1 Replies
View Related
Sep 4, 2012
I need to know if is possible to do a LACP using 2 x 10GB between 3750X and 2960S (WS-C2960S-48LPD-L) switches.
View 1 Replies
View Related
Feb 25, 2013
I have two 3750x stacked switches , both with the latest firmware on them. I enter the configuration onto one switch and it obviously copies over onto the other switch. Although in the configuration I have both a console username and password and an enable password, when I try to log onto the initial switch that I entered the configuration on, I am prompted for a username and password, which works fine, but when I try to enter enable mode i get an error stating that no password has been set. However when logging onto the other switch I am not prompted for a username or password but when I try to enter enable mode I am prompted for a password and can access it with no problems.
View 1 Replies
View Related
Dec 11, 2012
We purchased a number of 3750X 48 and 24 port switches for the College Campus. Am finally getting around to getting them inserted on the network. Working with a WS-3750X-48PF-S and a WS-3750X-24P-L. Have them stacked with the 10Gb uplink on the 48 port switch. Have not been having fun.In the boot sequence, the switches recognize they are stacked, but as soon as they finish boot, I get the message on the 48 port switch: “Stack Port 1 Switch 1 has changed to state down.” Then “Stack Port 2 Switch1 has changed to state down.” Am noticing that I have a message preceding that: “Major version mismatch with stack neighbor.”The 48 port is running c3750e-universalk9-mz.150-1.SE3, HBOOT 12.2(53r)SE2.The 24 port is running c3750e-unversalk9-mz.122-55.SE3, HBOOT 12.2(53r)SE2Most of our 3750X and older switches are running 122-55 or 122.58 code. IP base or Universal. There is speculation that the problem is the 24 Port is Lan base, as the part number might indicate. (WS-C3750X-24-P-L.... I think that is the part number) and the 48 is IP base. Both switches are Universal, and my understanding is that they don't care about LAN or IP Base until you enable a function that falls in the IP Base domain. Then I have to call Cisco Licensing.For these switches, LAN Base is fine, based on the boot message, I feel the real problem is 122-55 versus 150-1 in the stack. So.. the question is: Do I downgrade the 48 port to match what we have in our environment, and what is on the 24 port switch. Or... Upgrade the 24 port switch to match the 48 port switch and have an installation that is not consistent with our environment? I do have two more edge closets to install with this purchase of 3750X 48 port switches.
View 2 Replies
View Related
Mar 28, 2012
In my office we bought 7 cisco 3750X - 48PS switches. We configured Data Stacking between those switches. We also want to configure Power Stacking between those 7 devices.
I found in the Data Sheet that we can only configure 4 devices in power stacking at a time. If it is like that how to configure the rest of 3 devices. Need configuring power stacking between those devices in a better way..
power stack cable part no we have is
CAB-SPWR-30CM
View 2 Replies
View Related