Cisco Switching/Routing :: 4500e Power Cables Connection

Jan 21, 2012

Just received a couple of new 4500e chassis with the 2800ACV power supplies installed. I have not seen the cables they come with standard, the plug ends are considerably thicker than normal, what is the deal, do we need an electrician to come out and rewire or purcahse new powerboards?

View 2 Replies


ADVERTISEMENT

Cisco Switching/Routing :: C3750X Stack Power Cables End Colors

Oct 26, 2011

Does the color strips on C3750X stack power cables mean anything, I mean the green and yellow ones. On all Cisco pictures the green one seems to be plugged in the upper ports. I asked local Cisco representative, but he seems not to be sure. We tried to try different scenarios, and it looks like it does not matter what cable end we use. We do not have any external power supply, only interconnecting C3750Xs.

View 1 Replies View Related

Cisco Switching/Routing :: Power Stacking For 3750x - Both Cables Needed?

Jun 7, 2012

Suppose I have a 3 member stack of 3750x switches.  Members a, b and c.I have all 3 members stacked with all 3 *data* stacking cables in a daisy-chain topology.  The 50 cm data stacking cable from switch a (on the very top) to switch c (on the very bottom) just barely reached.Of course, that means the 30 cm *power* stacking cable didn't reach between a & c.  Right now, the power stacking cable goes from a to b, and then another cable from b to c.  Leaving me with a useless extra 30 cm power stacking cable.
 
My question is, can switch "a" receive power from switch "c" through switch "b"?  Is this just a big electrical "bus"?  What if the power supply in switch "b" is removed?Just wondering if there is a need for me to get a longer power stacking cable (one of the 150 cm power stacking cables). 

View 2 Replies View Related

Cisco Switching/Routing :: 3750x - Plug In Powerstack Cables With Switch Power Applied?

Mar 13, 2013

I have a customer that has a stack of 3750x switches installed in production and now would like to install the powerstack cables. The switches are in production and downtime would like to be avoided. Can you install the powerstack cables with the switches powered up? I would assume you can, but wanted to verify before doing so.

View 4 Replies View Related

Cisco Switching/Routing :: QOS On 4500E With Sup7-E?

Mar 25, 2012

I was contacted by a customer today who is trying to configure QoS on a 4500E with Sup7-E.  They are running:

cat4500e-universalk9.SPA.03.02.00.SG.150-2.SG.bin

And the 4500 is licensed for enterprise Services.  I don't have access to the switch and am looking for configuration documentation and I am not finding the necessary configuration guides. 

View 3 Replies View Related

Cisco Switching/Routing :: 4500E Not Remember MAC After Connected To 2960s

Jan 15, 2013

client originally connects to the 4500E, moves to the 2960s and then cannot connect back to the 4500E.My design is a 4500E (configured for routing) and a 2960s. The 2960s is trunked to the 4500E, no vlan pruning.
 
Tried;

- shut/no shut port on the 4500E doesn't work

- no result for sh ip arp | i (clients mac) or sh mac address | i (clients mac) on the 4500E
 
The only way I can get the user back online is removing the 2960s, not a desirable solution as other clients are on the 2960s.

View 2 Replies View Related

Cisco Switching/Routing :: 4500E QoS To Configure Access Port

Apr 25, 2013

I have some cisco 4500E with sup7l-e and I want config acces port(with non-cisco ip phone), that cos and dcsp mark does not change.

View 4 Replies View Related

Cisco Switching/Routing :: 4500E SUP7L-E Shows Error In Log After Upgrading

May 14, 2012

I upgraded IOS-XE on 4500E (SUP7L-E) to cat4500e-universalk9.SPA.03.03.00.SG.151-1. I encounter the log when i try to issue write mem commad
% VRF table-id 0 not activeCompressed configuration from 8947 bytes to 2140 bytes[OK].

View 3 Replies View Related

Cisco Switching/Routing :: Unsupported Module On 4500e SupV 10GE

Jan 17, 2012

When i swapped a  Sup v 10 ge for a Sup6 E Tonight in order to take advantage of the netflow capabilites of the Sup V - It came up with module unsupported for the following cards -  WS-X4648-RJ45V-E Will these only work with the Sup6 E or what

View 2 Replies View Related

Cisco Switching/Routing :: Assigning IP Address Through DHCP On New 4500E Install?

Nov 20, 2011

The DHCP/DNS server is on ip address 10.1.100.103 with an alt on .102 I'm attempting to integrate a 4510R+E into an existing network and use existing DHCP/DNS windows 2008 server to push out IP addresses to connected computers.
 
I want to assign a VLAN to every port for management purposes and then I put an IP helper address on every VLAN.
 
I've attached a the 4500E partial config.  I'm attempting to get Gi1/44 to a state where I can plug a computer into it an resolve an ip address and gain internet access like all the devices on the existing network can do.
 
I've created a new scope in DHCP with the ip subnet of 10.60.211.0 255.255.255.0 It leases addresses from .1 to .253
 
The computer will not resolve ip addresses with this config.

View 5 Replies View Related

Cisco Switching/Routing :: CAT 4500E Installed With WS-X4648-RJ45-E Module

Jun 29, 2012

I have cat4500 with subject module. There is strange behaviour over module installed in 3rd slot only, some ports are connected, UP & working fine. But If I am connecting new ports over same module, are not coming UP.Duplex/speed settings already checked & are fine. If i connect same machine to any other module, it perfectly comes up & operation is fine.

View 3 Replies View Related

Cisco Switching/Routing :: Connect PC With Fiber Cable On Supervisor WS-X45-SUP6L-E Of 4500E?

Feb 23, 2012

I have a problem connecting a PC in a TwinGig Convertors (GLC-LH-SM). I want to connect a PC with a fiber cable on the supervisor WS-X45-SUP6L-E of my Switch 4500E.
 
The default configuration mode is X2. As I want to deploy Gigabit interfaces (that is, use TwinGig Convertors), then I configured the associated port-group:
 
Switch(config)#hw-module module 1 port-group 2 select gigabitethernet
*Feb 24 06:18:37.125: Port Te1/2: TwinGig Converter inserted: vendor: CISCO
 Switch(config)#do sh int status mod 1                     
 Port      Name               Status       Vlan       Duplex  Speed Type

[code]....
 
I noted that the Swicth set up automatically 'switchport mode trunk', so i put the command 'swicthport mode access' because i want to connect only a PC. But the status is the same, I can not achieve connectivity. i just want to know how connect a PC in the interface GigabitEthernet1/4 of the supervisor engine of my Switch.

View 3 Replies View Related

Cisco Switching/Routing :: 4500E - Changing Default Etherchannel Load Balancing Algorithm

Mar 25, 2012

Will there be some pause in traffic on formed ether channel interfaces (4500E switch), when i will change the default ether channel load balancing method to src-dst-port (or any other non-default method)?

View 1 Replies View Related

Cisco Switching/Routing :: Catalyst 4500 Versus 4500E Series - Blades Interchangeable?

Feb 6, 2013

What's the difference between a Catalyst 4500 and a Catalyst 4500E series chassis? I believe it has to to do with supporting PoE+? Are the blades in both series interchangeable?                   

View 1 Replies View Related

Cisco Switching/Routing :: Catalyst 4500E Supervisor Engine 7-E / Possible To Deploy Simultaneously Both Type Of Ports

Aug 8, 2012

We've got a doubt about the uplink ports of this supervisor. I've read that you have to use the four ports in 10G mode or in 1G mode, but not use for example 1 port in 10G mode and 1 port in 1G mode:
 
But, you can read in another sentence: " Beginning with Cisco IOS Release 12.2(25)SG, you could simultaneously deploy the dual 10-Gigabit.Ethernet ports and the four Gigabit Ethernet SFP ports on the Catalyst 4503, Catalyst 4506, and Catalyst 4507R chassis." Is it posible deploy simultaneously both type of ports?

View 2 Replies View Related

Cisco WAN :: Find Website Specification Of Power Cables For ASR1002

Jun 5, 2013

I am trying to find on Cisco's web site the specification of their power cables for the ASR1002.  I am particularly interested in the NEMA specification for  the US power cable CAB-AC-RA .

View 2 Replies View Related

Cisco Switching/Routing :: 3550 EMI Switch Is Not Responding To Power Connection

May 10, 2012

My cisco 3550 EMI switch is not responding to power connection. I have checked and changed power cable. its still not working.fan is not running and no lights on front panel

View 3 Replies View Related

Cisco Switching/Routing :: Stack Cables For 3750e?

Nov 13, 2011

Can I get a stack cable longer then 3m?

View 1 Replies View Related

Cisco Switching/Routing :: 3750 - Power Stack Has Unbalanced Power Supplies

Jun 9, 2013

I am receiving the following error on 3750 stack switches. have already verified the power status and found ok.
 
IOS used: Cisco IOS Software, C3750E Software (C3750E-UNIVERSALK9-M), Version 12.2(55)SE3, RELEASE SOFTWARE (fc1)

211540: Jun 10 10:45:17.935 UTC: %PLATFORM_STACKPOWER-4-UNBALANCED_PS: Switch 4's power stack has unbalanced power supplies
211541: Jun 10 10:46:18.045 UTC: %PLATFORM_STACKPOWER-4-UNBALANCED_PS:

[Code]....

View 1 Replies View Related

Cisco Switching/Routing :: Stack-power 3750x / FRU Power Supply Is Not Responding

Sep 4, 2012

After stacking two 3750X switches, with four equal power-supply's, with StackWise and PowerStack , still got the next message every few hours %PLATFORM_ENV-1-FRU_PS_ACCESS: FRU Power Supply is not responding (gn4m-rt1p08-04-2)( note that the message revers to the second switch in the stack ) although the stackwise and powerstack on the switches is oke and are working correctly. !
 
Config  : Stack-power in power-sharing mode/strict With CLI on the switch : All the power supply's and stack-power details, prio look OK.
 
Only: LMS prime /inventory/cisco-view/configure/power supply status  result :  some power supply's are marked as disabled.with the command  > power supply 2 slot a off/on I manage to get the status back to "normal", but after a few hours some power supply's are again marked as "disabled".
 
Looks like SNMP en IOS difference from opinion.
 
Hardware
WS-C3750X-24S-S
C3KX-PWR-350WAC
 
Software
15.0(2)SE
C3750E-UNIVERSALK9-M

View 5 Replies View Related

Cisco Switching/Routing :: WS-C3560-48PS-S Show Power Inline But No Power Available

Apr 14, 2013

We have two switches of the same model (WS-C3560-48PS-S) that are not providing PoE. I'm trying to remotely determine what the cause of the issue is.
 
Here is some output.
 
Hostname#show power inlineAvailable:0.0(w)  Used:0.0(w)  Remaining:0.0(w)
Interface Admin  Oper       Power   Device              Class Max                            (Watts)--------- ------ ---------- ------- ------------------- ----- ----Fa0/1     auto   off        0.0     n/a                 n/a   15.4Fa0/2     auto   off        0.0     n/a                 n/a   15.4Fa0/3     auto   off        0.0     n/a                 n/a   15.4Fa0/4     auto   off        0.0     n/a                 n/a   15.4Fa0/5     auto   off        0.0     n/a                 n/a   15.4Fa0/6     auto   off        0.0     n/a                 n/a   15.4Fa0/7     auto   off        0.0     n/a                 n/a   15.4Fa0/8     auto   off        0.0     n/a                 n/a   15.4Fa0/9     auto   off        0.0     n/a                 n/a   15.4Fa0/10    auto   off        0.0     n/a                 n/a   15.4(code)

View 1 Replies View Related

Cisco Switching/Routing :: 6500 - Power-Redundancy Mode Combined And Power Fail

Feb 28, 2011

I have a 6500 chassis with 2 power supplies. At the moment  I am using the default configuration:
 
power-redudancy mode redundant
 
The problem is that an inserted module is in "power deny" state due too insufficient power.
 
I know, that It's not a good idea to change into combined mode (loss of redundancy), but my customers requested this anyway.
 
So I will change to combined mode. So here's the 1 million dollar question: "Which modules will go into power deny, if one of my power supplies fails?"
 
The 6500 config guide states:
 
"Power supply is removed withredundancy disabled
• System log and syslog messages are generated.
• System power is decreased to the power capability of one supply.
• If there is not enough power for all previously powered-up modules, some modulesare powered down and marked as power-deny in the show power oper state field."
 
Well, do you know if there's any way to configure some kind of priority? E.g. I definetly don't want by 10Gig Module or WiSM module to be in power deny. Can i statically make sure, those module will be powered on for sure? Like: "power enable module slot_number" How is this calculated? Or is random?

View 3 Replies View Related

Cisco Switching/Routing :: 3750X Stand Alone Secondary Power Supply Act As Pool Of Power

Apr 4, 2012

In a stand alone 3750x switch configuration, can the secondary power supply only act as a redundant power supply (active/standby), or can it become a "pool" of power similar to power sharing mode for StackPower (somewhat active/active)?  I understand there is no stack involved here but I'm curious if this functionality is possible.

View 1 Replies View Related

Cisco Switching/Routing :: 6500 MTP / MPO Crossover Cables Or Straight Through?

Jan 20, 2013

I'm looking to deploy a pair of 6500s running VSS. VSS will be established over a pair of 40GBASE-SR4 QSFP+ transceivers in each switch.Do we need MTP/MPO crossover cables or straight through cables to connect the QSFPs?Since the two switches are sitting side by side the MTP/MPO cables will be passed directly between the two racks.As a result there will be no intervening fibre fobots used.

View 1 Replies View Related

Cisco Switching/Routing :: 3750 Connect Stack Cables To New Switch

Dec 11, 2011

At a customer i've tried to add a new 3750 switch til a running stack.I used the following proccess:
 
1. connect stack cables to the new switch

2. bootup new switch.
 
Normally the new switch will become a member of the stack, but here, the switch says its the stack master. I can see that the stack port from the old switches connecting the new is up.The only way i could make it work was to provisioning the new switch as switch nr x, save, power off and then connect it and boot it up.The IOS i the same on all switches.

View 2 Replies View Related

Cisco Switching/Routing :: Do 3560X Switches Include StackWise Cables

Nov 18, 2011

When purchasing part number WS-C3560X-48P-L is a StackWise cable included or do I need to purchase that separately?

View 3 Replies View Related

Home Network :: UTP Cables Are Crossover Cables Or Straight Through?

Jul 17, 2012

UTP cables are crossover cables or straight through??

View 5 Replies View Related

Cisco WAN :: Catalyst 4500E - Any Supervisor With DECnet Routing Support?

Feb 8, 2011

Is there any sup for 4500E with DECnet routing support?

View 2 Replies View Related

Cisco Switching/Routing :: Power Connect 6224 With Routing Enabled With Several VLAN Setup

Jan 19, 2013

I have a power conncet 6224 with routing enabled with several VLANs setup.VLAN Database: 6,8,10,90-254VLAN 6 is our management vlan10 is for our core network services (DNS, Domain, Exchange etc)90-254 are isolated vlans.What I need to accomplish is to prevent vlans 90-254 from communicating with each other and only allow communication to VLAN 10 and the internet. All internet firewall work will be handled by our Sonicwall. [code]

View 1 Replies View Related

Cisco Switching/Routing :: 3750-x Won't Power Up

Oct 31, 2012

I recently bought a bunch of cisco 3750-x switches. I configured them all and started deploying them. A day later, some of the switches started failing on me. When I connect the power cord to the AC main, the power supply module on the back shows "AC OK" LED Green but the "PS OK" LED shows Red. I started referring to the installation guide and it told me that "PS OK" LED turns RED when output has failed. Guessing this I checked with another power supply module that was working, but still I get the same LED indicators.The original power supply module works with other switches.IOS crash...?

View 5 Replies View Related

Cisco Switching/Routing :: How To Power 3560CG-8PC-S By PoE

Sep 4, 2012

I got some specs here that I can't seem to match with any existing switch - unless the 350CG-8PC-S can be powered by PoE.Let me quickly put down the important specs.
 
8x Gigabit ports
2x 1G Copper or 1G SFP Uplinks (It'll be a 1x Copper and 1x SFP setup)
support for PoE passthrough ( so just capable of it, provided it's 2x Copper Uplinks )
 
Does that match the 350CG-8PC-S ?

View 1 Replies View Related

Cisco Switching/Routing :: 2960 - Power LED Does Not Come Up

Jul 22, 2012

Have Cisco catalyst 2960 IOS ver12.2(53)se2 when power on the power LED does not come up and on this is what shown on hyper terminal. what need to be done for this switch ? 
 
Boot Sector Filesystem (bs) installed, fsid: 2
Base ethernet MAC Address: b4:d9:8d:27:4c:00
Xmodem file system is available.
[code]......
 
Interrupt within 5 seconds to abort boot process. Boot process failed. The system is unable to boot automatically.  The BOOT environment variable needs to be set to a boot able image.

View 12 Replies View Related

Cisco Switching/Routing :: 3750X Power Needs For PoE

Mar 21, 2013

I am building a switch stack using 4 48 port 3750X switches that will also have the power stacked.  If I install a single 715W power supply in each switch will the stack support 802.3af accross all 48 ports on each switch?  My calculations are 48 ports x 15.4W which gives me almost 740W needed which is over hte 715W power supply.  I was reading somewhere were it mentioned that in a powerstack additional power can be drawn from the stack.  I know this will not work if you are trying to support power on all switches accross all ports but would it if say 2 of the 4 switches are needing to provide PoE accross all 48 ports?  If I say we can only use 24 ports per switch for PoE that drops the power need down to 370W which I believe should work.  Just trying to get a better understanding of PoE consumption.  Would the best solution be to just add a second power supply to each switch?

View 8 Replies View Related