Cisco WAN :: Catalyst 4500 E-Series Supervisor Engine 7L-E?
Aug 12, 2012
I have a strange issue with 4500 E chassis loaded with SUP 7L-E which always remains in ORANGE LED status, also the uplink ports interface is down and the line protocol is down but when i execute the command sh int gig1/5 it show me the media type sfp but there is no red laser light seen in the sfp transiever,The below command is configured for the uplink gig port on the SUP engine.hw-module uplink select gigabitethernet?
Our company will go to buy a core switch 4503. What is the difference between the Catalyst 4500 E-Series Supervisor 7L-E and the Catalyst 4500 E-Series Supervisor 7-E?
Does a new Cisco Catalyst 4500 series supervisor 7L-E model WS-X45-SUP7L-E is backward compatible with a Cisco Catalyst 4500 series chassis model 4507R? I've checked on Cisco website for that Supervisor and it shows only new chassis models WS-C4507R+E and R-E, but what about old type of chassis? We need to upgrade that Supervisor as it's out of line, but we don't really want to buy a new chassis as well as it's going to be very pricy.
On an existing 4500 switch with a single sup 6-E, another sup 6-E is added. But the second sup6-E comes up as synchronised with active and in a few minutes time, reloads again. the software is 12.2(44) is the same on both sup engines. the redundancy sso output shows that slot6 is disabled.
we have Supervisor Engine 720 10GE (VS-S720-10G) in slot 5 on Catalyst 6509-E. Slot 6 is free. We need to replace VS-S720-10G. Is it possible the following scenario
1. we will insert new VS-S720-10G into the slot 6 2. then we will remove the faulty VS-S720-10G from the slot 5
Will everything work without interuptions. Is any document where I can find step-by-step procedure how to replace VS-S720-10G ?
We've got a doubt about the uplink ports of this supervisor. I've read that you have to use the four ports in 10G mode or in 1G mode, but not use for example 1 port in 10G mode and 1 port in 1G mode:
But, you can read in another sentence: " Beginning with Cisco IOS Release 12.2(25)SG, you could simultaneously deploy the dual 10-Gigabit.Ethernet ports and the four Gigabit Ethernet SFP ports on the Catalyst 4503, Catalyst 4506, and Catalyst 4507R chassis." Is it posible deploy simultaneously both type of ports?
I am trying to understand the implicit limit to the priority queue. I know you can define an explicit policer but if you don't I can't find out what the rate limit really is.
switch catalyst 4500 with ios cat4500e-universal.SPA.03.02.00.XO.150-2.XO.bin. I need to configure modules 3 and 4 of supervision, the problem is that I need the 4-port module 3 are active but only the first turn on both the module 3 and the first port on the module 4. [code]
When the 4500-E series switch boots and if you issue a 'show run' there's several Star Wars themed references and their revisions. What these actually are and why they are using Star Wars terminology?
Here's the output:
Cisco IOS Software, Catalyst 4500 L3 Switch Software (cat4500e-ENTSERVICESK9-M), Version 12.2(53)SG2, RELEASE SOFTWARE (fc1) Technical Support: [URL] Copyright (c) 1986-2010 by Cisco Systems, Inc. Compiled Tue 16-Mar-10 04:50 by prod_rel_team Image text-base: 0x10000000, data-base: 0x12794974
1AR1R2-NC1 uptime is 2 years, 2 weeks, 3 days, 15 hours, 44 minutes System returned to ROM by power-on System restarted at 19:29:14 UTC Fri Jun 4 2010 System image file is "bootflash:cat4500e-entservicesk9-mz.122-53.SG2.bin"
What's the difference between a Catalyst 4500 and a Catalyst 4500E series chassis? I believe it has to to do with supporting PoE+? Are the blades in both series interchangeable?
I was looking to 6500 series switches. I saw DFC4 module (WS-F6K-DFC4-A, WS-F6K-DFC4-AXL) and (WS-F6K-DFC4-E, WS-F6K-DFC4-EXL). Data sheet for supervisor engine 2T wrote that for maximum performance you should DFC4. I'm a bit confused. I didn't any useful information about it:
1. DFC4 is a separate module(consumes 1 slot)? Does it have any ports on it?
2. Is it a daughter card? If yes, should it be installed on supervisor or it should be installed on line cards?
i have a standalone SUP720, no traffic is passing through it. only one port connected for remote telnet, its kind of backup device.today i checked its log, and there are some wiered message.is it a software bug or my SUP has gone bad? [code]
Removing and Installing a Supervisor Engine on a cisco router 7690 and more important IOS upgrade of this module.
I need some kind of manual, but I would prefer a short procedure to do this change. A brief of the steps to do that. Also i don't if i have to upgrade the new module after install it.
PD. IP7VAL02#sh modMod Ports Card Type Model Serial No.--- ----- -------------------------------------- ------------------ ----------- 1 48 CEF720 48 port 10/100/1000mb Ethernet WS-X6748-GE-TX SAL1034Z32J 2 48 CEF720 48 port 10/100
We have a scenario with 2 chassis, both with 2 supervisor Engine 2T, we try to make a configuration of VSS with the chassis and would link to know if is possible have 2 supervisor on chassis one and 2 supervisors on chassis 2 with VSS?
Router#sho switch virtual redundancy My Switch Id = 1 Peer Switch Id = 2 Last switchover reason = active unit removed Configured Redundancy Mode = sso Operating Redundancy Mode = sso
[code]....
would like to use the second supervisors for obteind the local redundancy en chassis 1 and 2, this is possible?
the actually version on four supervisors is: s2t54-ipservicesk9-mz.SPA.150-1.SY3.bin
I have configured the VSS in two cisco 6509-E series with only one supervisor engine, but if i configured with two supervisor engine. it is going to common mode. One supervisor engine is 3c and 3cxl.
I have an older 4006 with a Supervisor II+. We now need OSPF support, which the Sup II+ does not provide. I have access to a Supervisor III (WS-X4014), which will provide OSPF support. Question is, are there any gotchas to shutting down the switch, replacing Supervisor Engines and then powering up? What about the flash card? On my current system, it appears that I am only using bootflash: , which is where the IOS resides (see below). Since my startup config is in nvram and my IOS is in bootflash, what's the purpose of the flash card in slot0: ? and where does NVRAM and bootflash actually live on a 4006 ( on the Supervisor Engine?)
sh bootvar BOOT variable = bootflash:cat4500-ipbase-mz.122-31.SGA11.bin,1;,1; CONFIG_FILE variable does not exist BOOTLDR variable does not exist
I buy a Cisco 4003 Switch with Supervisor Engine I but it only run CatOs and i whant it to run Cisco IOS so whitch Supervisor Engine can the Cisco 4003 Switch run? i have look at the Supervisor Engine III it can run Cisco IOS and Layer 3 but can i use that in my Cisco 4003 switch?
I have a 4507R with a WS-X4515 supervisor V. It was booting into rommon mode, so I attempted to boot to an IOS image from TFTP. The boot process hangs at at the end of the below output and the then the status light blinks orange. I left it sit like this overnight, and it remained the same.
There is a Cisco Catalyst 6513 in my office. Recently we decided to setup redundant Supervisor Engine 720-3B. When we did it, its became STANDBY COLD, and then it reloads. IOS is equal on both supervisors. It must be STANDBY HOT (SSO) redundancy. There is a configuration and show ver and show module outputs, and log of my actions.
In my 6513 switch chassis we have two Supervisor Engines 720 one is marked Active other as Hot. what is the diffrence in their mode as by name I suppose that Active one is currently in use and Hot one is in standby mode.They are showing in this manner.
We are expanding out LAN network with more 2960 access switches. All the access switches are suppose to be connected to core switch (4507R) but i have less port on the core switch.
On the core switch we have two supervisor engines (WS-X4515 ---description : "Supervisor IV with 2 1000BaseX GBIC ports"). I can see that on each supervisor engine i have two 1 GB SFP ports available and if i calculate for two supervioser engine i will have 4 1GB ports.
But at particular time only one supervisor engine is active and other is in standby mode (redundancy mode used is SSO between two SUP engines).
Can i used all 4 SFP ports for connecting 4 uplinks to the 4 access switch?Will all the 4 SFP ports active at one time or only 2 SFP ports will be active that is for only active supervisor engine.
We bought Cisco sup engine WS-SUP32-GE-3B for 6500 switches 2 nos for redundancy. I have connected 6 systems on each sup engine ports. How to clarify whether both sup engine will forward the data while one is Master and other is standby?
We recently perchaced 4503 switch with Sub Engine 7L. It has universal IOS. We are unable to run EIGRP and HSRP protocol and the switch came with temporal license.how to proceed further to get EIGRP and HSRP enabled on the 4503 switch.
we got 2 Cisco 4005 Switches with IOS 12.x. t.Now we have two new Cisco 4500 Switches with Supervisor 6E-L.But i dont really understand the new syntax / configuration method of ios 15.