Cisco Switching/Routing :: 2960G Core Switch For 400 Users

Jun 7, 2012

I'm trying to decide what switch to use as a core for 500 users. I'm currently looking at either 2 x 3750X stacks or 2 x 4500s with dual SUPs and PSUs, both options will provide the number of switchports required without the need for additonal access layer swiches. Which switch option is best to go for here? All of our services will be located in our data centre which will be connected using 2 1000Mbps MPLS circuits. I wont need any advanced L3 features and we are not likley to scale over 450 users. Also is it ok to use the dual switch stacks or chassis to provide the collapsed core/access layer or is it best to have a dedicated core (using one of the above options with less switchports) and having a dedicated accesss layer using 2960Gs for example. Our structured cabling terminates in a single comms room so we wont need to distribute switches throughout the office.

View 3 Replies


ADVERTISEMENT

Cisco Switching/Routing :: Cannot Upgrade 2960G Switch

Jun 26, 2012

I have a few 24-port Cisco 2960G Switches (model WS-C2960G-24TC-L) that I upgraded to IOS Release 15.0(1)SE2 using the web interface. I am now trying to upgrade those switches with the new release, 15.0(1)SE3, however I seem unable to do it, I have tried this on two switches so far, both have been upgraded to SE2 just a couple months ago or so, and both of them will not accept the SE3 upgrade, basically, I can select the tar file in the web browser and click "Upgrade"  but when I do the status never changes from "Loading the tar file to the switch". I have tried multiple times from multiple computers using many different web browsers, including IE6 which is listed as supported. I have let it go for as long as 1.5 hours but to no avail.I also had a few idential switches here that had never been upgarded to SE2, I have had no problems loading SE3 onto them using the same method so it would seem that the tar file I have downloaded is valid.

View 5 Replies View Related

Cisco Switching/Routing :: 2960G - Switch Clustering Benefits?

Jun 11, 2013

I recently changed jobs and at the new location we are primarily running Catalyst 2960G series switches with the exception of one 3750. All of the switches are setup in a cluster with the 3750 being the cluster master. My question is what is the benefit of switch clustering? The entire network seems to be a bit over engineered for the our needs and I am hoping to scale it back a bit. For example, the the network was setup with VOIP QoS when there were no plans to even use VOIP. Also what procedures would I want to follow to disable the cluster to avoid any major outages? Assuming there is no real need for a cluster.

View 1 Replies View Related

Cisco Switching/Routing :: IOS Installation For Switch 2960G 48TC-L?

Oct 23, 2012

i had made a software upgarde on the switch 2960G series have no any passwords, when I fished the upgrade process after rebooting the device i found it need a UserPw to access device manager. i tried to use the default PW "cisco" but it dosen't work too.. after that i tried the password recovery process to rest the PW, but noway, but now i have addition problem, when i try the cmd orders "flash_init , load_helper , dir flash" to beginning  the password recovery process it shows the following:
 
The system has been interrupted prior to initializing theflash filesystem.  The following commands will initializethe flash filesystem, and finish loading the operatingsystem software:

flash_init    boot
switch: flash_initInitializing Flash...flashfs[0]: 554 files, 19 directoriesflashfs[0]: 0 orphaned files, 0 orphaned directoriesflashfs[0]: Total bytes: 32514048flashfs[0]: Bytes used: 15540224flashfs[0]: Bytes available: 16973824flashfs[0]: flashfs fsck took 10 seconds....done Initializing Flash.
switch: load_helperUnknown cmd: load_helper
switch: load_helperUnknown cmd: load_helper
switch: load_helperUnknown cmd: load_helper

[code]....
 
After that the problem updated 
 
because I tried to install the IOS by Xmodem to reload the missing flash file.After finsh the TAR file loading and reboot the switch.......the LEDs of mode and Giga ports are lighted amber and not blinking,  i tried many times to follow the steps to connect the switch by the emulator and consol cable by holding mode button and connecting the power cable at same time the device does not work, the switch now still not blinking, now i try to read and understand how can i remove the corrupted files and install a new IOS for this switch?What shall i do.

View 1 Replies View Related

Cisco Switching/Routing :: 2960G Stack To Another 2960G

Oct 23, 2011

I have used all the ports on my 24 port 2960G and need to extend it with another 2960G. These switches do not have trunk ports so what is the best way to stack them and have all 5 vlans on both switches.Can I just use a port Channel trunk  etherchannel ?

View 7 Replies View Related

Cisco Switching/Routing :: 2960G Disable Srr-queue On Switch Port

Jun 20, 2012

I have a Cisco 2960G switch and one of the ports was configured with srr-queue bandwidth limit 90 - I need to remove this bandwidth limiting from this interface. [code]

View 2 Replies View Related

Cisco Switching/Routing :: Forwarding IEEE 802.3 Raw Packets Through 2960G Switch

Dec 5, 2011

I have a requirement to monitor downstream data feed from a remote site and feed it to multiple destination devices for recording.  The source data will be fed into a port on a Cisco 2960G switch then, using the monitor function, be forwarded to multiple interfaces.   This works fine for normal Etherent II traffic.  We tried a test using a device that generates IEEE 802.3 Raw packets ('type' field is used as a 'length' field) but found that while the traffic appeared to be accepted by the input port with no errors it was not forwarded to the destination ports, even when using the monitor function.  I did try the 'encapsulation replicate' feature with no luck.  It does not forward these packets even if I set all the ports into a common VLAN and let the switch just perform a normal switch function (non monitor).
 
if it is possible to get the IEEE 802.3 raw packets to pass through the switch and if it is, how to or what I need to do to make it work?

View 13 Replies View Related

Cisco Switching/Routing :: Browser Access To Switch Fails (Catalyst 2960G)

Jul 4, 2012

I am unable to access a series of switches connected together through a management vlan.  I receive the message "The server xx.xx.xx.xx at level_15_access requires a username and password."  Entering the username and password fails and the same username and password message returns.  I am able to ssh into the switch with the username and password that fails trying to access the switch with the browser.
 
How can I check the username and password for access with the browser?
 
I am trying to monitor switch performance.  Is there a good way to monitor switch performance with the command line interface?

View 2 Replies View Related

Cisco Switching/Routing :: 2960G High Output Drops Only On Gigabit Switch

Feb 11, 2013

I just got a Cisco 2960G 24-port gigabit switch so that our HP servers can have a Gigabit connection to the network. I moved 2 servers to it (HP Proliant DL380's)  but they don't actually seem to be able to achieve even close to 1000Gbps. I ran same some LAN bandwidth tests and it was showing only around 200-300 Mbps between all of them. I also ran a network stress test utility, LAN Tornado, and it was showing packet loss as high as 60% when on gigabit, and only .07% when on 100Mbps.
 
-Both the NIC's and the switch ports are set to 1000/Full

-Currently using Cat5e cabling no more than 25Ft in length (I know Cat6 would be better but Cat5e is supposed to support Gigabit)

-All servers are on the same VLAN
 
Here are the port statistics when running just a stress test @ 10Mbps that had a 45% packet loss. What's odd though is when I set the servers and switches to 100Mbps, I get less than 1% packet loss.
 
GigabitEthernet1/0/16 is up, line protocol is up (connected)
Hardware is Gigabit Ethernet, address is 203a.07ff.7e90 (bia 203a.07ff.7e90)
MTU 9000 bytes, BW 1000000 Kbit/sec, DLY 10 usec,

[Code].....

View 2 Replies View Related

Cisco Switching/Routing :: 6500 - Power Off Core Switch?

May 31, 2012

we need to relocate our core switch 6500 with sup 720 to another bldg
 
what is the command to gracefully shut it down I mean power off
 
I was told one can just switch off the power

View 4 Replies View Related

Cisco Switching/Routing :: How To Configure 1 Core Switch 4500

Jun 2, 2013

i configure the uplinks as etherchannel, i configure two svi interface on core switch int vlan 51(192.168.51.1) and int vlan 50(192.168.50.0) for this two svi int i configured two dhcp pool , when any of the pc is requesting for dhcp add i am getting dhcp request failed/

View 7 Replies View Related

Cisco Switching/Routing :: How To Connect Two Core Switch C4510R+E SUP 7-E

Nov 4, 2012

I have 2 units core swicth C4510R+E SUP7-E  need to connect together for redundant purpose , i bought also 4X 10GE uplinks for each core switches .May i know how i shall connect both core switches together using my spec Catalyst 4500 E-Series 12-Port 10GbE (SFP+) ?

View 6 Replies View Related

Cisco Switching/Routing :: EWA14 - High CPU Utilization In Core Switch

Dec 20, 2011

I am experiencing high cpu utilization in my 4000 series core switch.
 
I checked the loggs. i saw some strange loggs.
 
Please see the below logs:

Code...

What is the "invalidsourceaddresspacket" ?
 
Is this is due to some virus attack or something?? Also one more thing this switch is the Active router in HSRP.

View 12 Replies View Related

Cisco Switching/Routing :: 2960S Unable To Connect To Core Switch

Sep 21, 2012

I have a problem with extending the LAN on a client site . They are looking to extend the LAN with a 2960S-series switch. Already in place is a 4510 switch which the 2960 is connected to via fibre. The 2 switches are both set up but there is no connectivity as I cant ping between them or anything. The management VLAN on the 2960 shows line up, protocol down, which I believe means the VLAN is enabled but there is a form of physical mismtach on the ports. I have attached the configs of both switches. I feel it might be a problem with GBIC module compatibility. The SFP installed on both ends of the switch are GLC-SX-MMD. On the 4510, the SFP sits in a twingig converter (CVR-X2-SFP) but there is no light on it at all when the cables are plugged in.

View 40 Replies View Related

Cisco Switching/Routing :: 6500 - Changing VTP Mode Of A Core Switch

Oct 14, 2012

We have two 6500 core switches and one(primary) of them is running in VTP transparesnt mode and the other (secondary) one is running in VTP client mode. I would like to change the VTP mode of the second switch to transparent mode. Would it cause any issue. I guess i have to create VLANs onto the switch.

View 7 Replies View Related

Cisco Switching/Routing :: Connecting Core Switch To Firewall 3750x

Apr 13, 2013

I have a 3750X four-switch stack acting as the core of a fairly simple LAN. All I need to achieve (and this seems inordinately hard, but it is entirely likely that I'm just being dense) is to get access to the internet through my core switch, through the firewall and out through my VSAT. I've spoken at some length with the firewall providers (Cyberoam) and they tell me all I need to do when I migrate onto my new system (Cyberoam is currently in place at the entrance to our existing LAN) is change the local IP address of the Firewall, plug in the new switch to the LAN port, and away I go. Tried that, didn't work, so obviously I'm missing something.

View 22 Replies View Related

Cisco Switching/Routing :: Migrating Core Switch From 3750 To 6500?

Jun 5, 2013

I am planning to migrate the core switch from cisco 3750 to Cisco catalysts 6513 switch. What could be the best approach to minimize the downtime or avoid disrupting the production. I have couple of thoughts, one method is to build the core and then replace the existing core, another option is to build the new switch as the second VTP server and once it recieves all the VTP information then disconnect the old server.

View 6 Replies View Related

Cisco Switching/Routing :: Change From 3com Core Switch By 2960?

Aug 30, 2012

choosing a core switch, to replace a swich 3com model 4924, its main function is to support a 4-LAN switch cisco 2960 (100 users) and a ring cluster of 12 servers.obs. Current 3com core switch has 56 Gbps performance and 41.6 million packets per second.

View 3 Replies View Related

Cisco Switching/Routing :: Upgrade Software Of Core Switch 4503e?

Nov 2, 2011

i am trying to upgrade the software of the core switch 4503e, i could not get the managemenet ip address up and running. what i did is the following :
 
interfave vlan 1
ip address 192.168.1.1 255.255.255.0
no shu
  
then my laptop ip address is 192.168.1.100 255.255.255.0?result pinging from CLI is request time out.is there any els command where i need to input ?

View 13 Replies View Related

Cisco Switching/Routing :: Very High CPU Utilization Core Switch 4503?

Feb 14, 2012

We  had a core switch(30 vlans) in our environment and it's noticed that  CPU utilization of the core switch is showing high during recent days. I  have checked logs and processes, but couldn't find the root cause. The  issue found only in the office hourly only(after that the cpu  utilization is idle and normal). I have already referred the following  link to troubleshoot the issue " [URL]
 
see the following outputs from the core switch
 
CPU utilization for five seconds: 99%/0%; one minute: 99%; five minutes: 99%
PID Runtime(ms)   Invoked      uSecs   5Sec   1Min   5Min TTY Process
  30   6687557041432420936        466 47.52% 47.10% 45.98%   0 Cat4k Mgmt LoPri
  55  30667074884269560256          0 45.36% 45.50% 45.85%   0 IP Input
  29  28552856922870089254          0  3.59%  3.50%  3.57%   0 Cat4k Mgmt HiPri

[code]....
 
Note: Each Invalid source mac entry in each day from same port (above is the output after clearing logs before 3 days)
  
My queries regarding the issues are following
 
1) How can we find root cause regarding the high cpu utilization?

2) Is a single invalid mac address makes the cpu highly utilized for suppressing it?

View 10 Replies View Related

Cisco Switching/Routing :: Upgrade IOS For Production Core 3750 Switch

May 7, 2013

I want to upgrade IOS for my production core 3750 switch. Below is Show version/fash output. I have IOS image "c3750-ipservicesk9-mz.122-55.SE7", need to confirm below concerns:-
 
1-As this is stackable switch do i need to upgrade on all Switch..i can see there are 3 flash while doing show flash?
2-Is above IOS image support with  my switch? do i able to enable ssh?
3-is flash memory is enough to succefully upgrade IOS?
4-Any other point which i should keep in mind before upgrading..any special feature which this IOS wont support.

View 11 Replies View Related

Cisco Switching/Routing :: 3750X / Core Switch In Redundant Mode?

Nov 18, 2012

Two Cisco 3750X can be stacked together to ensure redundancy.Is the attached topology feasible for access layer redundancy?

View 5 Replies View Related

Cisco Switching/Routing :: WS-4503 - Core Switch Having High CPU Load

Jan 13, 2012

We have two core switches in our network (Cisco WS-4503). HSRP is working as Active-Standby mode. Recently it has been found that core 1 (which is in active mode) shown high CPU load (60% - 100%). Also found that the below mentioned process takes more CPU. Our network consist of around 30 Vlans. We have already checked for the solution in Cisco website [URL]  but couldn't find exact reason. see the below outputs for core 1 switch.
 
Core1# sh processes cpu sorted
CPU utilization for five seconds: 55%/3%; one minute: 65%; five minutes: 71%PID Runtime(ms)   Invoked      uSecs   5Sec   1Min   5Min TTY Process  30   1606933521086983644        147 24.79% 29.93% 35.85%   0 Cat4k Mgmt LoPri  29 

[Code]....

View 3 Replies View Related

Cisco Switching/Routing :: 5520 Dual Core Switch For Redundancy

Sep 16, 2012

I have the following: 1 5520 ASA connected to the internet, 2 core switches, and several access switches.Aside from implementing RSTP, VRRP, hard code access and trunk ports, is there any other recommendation you would like to add.

View 7 Replies View Related

Cisco Switching/Routing :: 2 Internet Connection Connected To Same Core Switch 6509

Jan 25, 2012

i'm already has one internet connection is conecting directily to the Core Switch 6509, and the Switch is route any internet request with default route:
 
SW6509-conf)# ip route 0.0.0.0 0.0.0.0 10.170.10.10
 
10.170.10.10 is --> Next hop for the DSL router internal IP, and it's working fine.
 
We have a new internet connection with another ISP/ with another DSL router, how to connect both of them to exit from the Core Switch 6509.
 
is it ok if i make another default route to the Next hop to the new DSL router as:
 
SW6509-conf)# ip route 0.0.0.0 0.0.0.0 10.80.10.10
 
10.80.10.10 is --> Next hop for the new DSL router internal IP.

View 6 Replies View Related

Cisco Switching/Routing :: Setup SG300-20 As Core And SF100-48 As Distribution Switch

Oct 6, 2012

To setup SG300-20 as CORE switch and SF100-48 as Distribution switch.SG300-20 will have 2 VLAN(DATA and VOICE)
 
-192.168.14.1/24 DATA
-172.168.0.1/24 VOICE
 
SF100-48 will also have 2 VLAN(DATA and VOICE)
 
-192.168.14.1/24 Desktop/Laptops
-172.168.0.1/24 IP phones
 
Problem is when I tried to assign IP to any VLAN's the switch will just hang and loose my connection the light will stop blinking it will steady and i unable to access the switch until i turn off again?

View 1 Replies View Related

Cisco Switching/Routing :: 3750 / 6509 - Upgrade Core Switch Without Disrupting Network?

Feb 2, 2013

I am planning to upgrade the current core switch(3750) to 6509 series switch. Since we have a production network running we have to plan for an online core switch upgrade.

View 7 Replies View Related

Cisco Switching/Routing :: 6509 Core Switch Command / IP PIM Sparse-dense-mode

Oct 23, 2011

What is PIM? give me an example when I will use and not use the PIM command.

View 4 Replies View Related

Cisco Switching/Routing :: Not Logging All Levels Of Sylog Messages From Core Switch 4503

Apr 23, 2012

We had a core switch(4503) in our environment and recently we tried to enable syslog in the switch. But the syslog server doesnt receives all the configured level messages from the switch. Following is the only message getting in syslog server after the configuration change in switch.
 
%SYS-5-CONFIG_I: Configured from console by CWLMS onvty1
 
(No Traffic related messages like acl deny traffic, spanning tree events etc are getting to syslog server as well as log buffer of the switch)
 
Following are the logging configuration for the core switch
 
logging monitor informational
logging facility syslog
logging source-interface Vlan44

[Code]....

1) Is there any more configurations required for getting all traffic related messages, (i mean all possible messages - upto level 7 - debugging)?

View 3 Replies View Related

Cisco Switching/Routing :: Limit For Creation Of Port Chanel In Core Switch 6509 And 6513

Feb 20, 2012

How much is the limit for the creation of PortChanel in a Core Switch 6509 and 6513?Is there a limitation byu hardware?

View 7 Replies View Related

Cisco Switching/Routing :: 6500 Ping Packet Drop From Core-Switch To Directly Connected Server

Oct 24, 2011

I have an Cisco 6500 CS and there is a Cisco Unified Communication Manger Server connected directly to the Core Switch.I tried to change duplex and speed ( fix and auto ) for both sides, but the same problem.

View 9 Replies View Related

Cisco Switching/Routing :: Any Challenge To Upgrade Core Switch 6500 Series From Nexus 7009 Which Runs NxOS

Jan 28, 2013

Is there any challenge to upgrade core switch 6500 series from Nexus 7009 which runs NxOS, because i have 3750X series switches connected at distribution and access layer in my network topology??
 
Is there any challenge if we place NxOS in core and IOS in distribution and Access layer??? how we are able to match sh run config in existing 6500 switch to Nexus 7009 NXOS?

View 9 Replies View Related

Cisco Switching/Routing :: 2 Users To Access 2955 Switch

Apr 15, 2012

I'm trying to allow 2 users to access as 2955 switch.
 
-admin privilege 15
-eousers privilege 2
 
When they both log in they just get to the user exec mode, how can I get them to go to their respective modes? [code]

View 1 Replies View Related







Copyrights 2005-15 www.BigResource.com, All rights reserved