I have changed the universal IOS on the 3750X to IP base..but they still wont come up as a stack. On the 3750X I don't see any log entry, on 3750G (major version mismatch).
We have bought four identical 3750X switches with identical SW-images: 12.2(55)SE3 C3750E-UNIVERSALK9-M
We initially connected two switches, this resulted in forming a stack.With the other two switches we wanted to do the same thing. However, we received the following message:
%STACKMGR-5-MAJOR_VERSION_MISMATCH: Major Version Mismatch (Local 1 - Received 6) with neighbor-1
Both switches will not see each other and the output of show switch stack-ports shows only one switch and both stack ports as being Down.
I did some digging using the show platform stack-manager all command to find out that three of the 3750X's have the stack version number 1.45 and one has 6.45. This would obviously indicate the reason behind the mismatch, but the SW-versions on all new switches are identical!
Checking the CISCO site explains that mismatching of Major version is critical:
Major Version Number Incompatibility Among Switches
Switches with different major Cisco IOS software versions usually have different stack protocol versions. Switches with different major version numbers are incompatible and cannot exist in the same switch stack.
That's all I could find. Nothing about changing the major version number, so all I can suspect is that IOS version needs to be the same.
can i stack cisco (ws-c3750G-12s) with (ws-c3750X-24p-poe-s) with (ws-c3750-48p-10/100 poe) i mean even a switch is 10/100 and the other switch is 10/100/1000?
I'm able to upgrade the master of a 3750 stack, but the member fails to upgrade. [code] I couldn't do rmdir flash:update unless I reload chassis... but even after reloading still cannot make the 2nd member to load with the newer IOS.
I have a situation. I am running two-switch 3750-stack and it crashed this morning. IOS version the switches is: "flash:c3750-ipservicesk9-mz.150-1.SE.bin"
SRPRSRGBYA#
Log Buffer (10000 bytes): 3:40.840: %LINEPROTO-5-UPDOWN: Line protocol on Interface Vlan104, changed state to up Nov 3 13:13:40.840: %LINEPROTO-5-UPDOWN: Line protocol on Interface Vlan201, changed state to up Nov 3 13:13:40.840: %LINEPROTO-5-UPDOWN: Line protocol on Interface Vlan202, changed state to up M-1-CRASHED: (SRPRSRGBYA-1) Nov 3 13:18:13.336: %PLATFORM-1-CRASH(code)
I have running a Stack with two C3750G-24TS-S1U with the IOS c3750-ipbasek9-mz.122-50.SE3.Now I want put a new C3750X-24T-S in the existing stack. I have read this is possible. I have running a other mixed stack with a C3750G-12S and an C3750E-48TD. Its running fine until I want to make an IOS update. The update was done with the CW LMS 3.1. After the automatic update and restart only the C3750E had an new IOS the C3750G doesn't have any IOS. Do I have the same problem with the mixed Stack C3750G and C3750X?Do I have to upgrade the IOS by copying the different IOS Versions ( c3750-ipbasek9-mz.122-50.SE3 / c3750e-ipbasek9-mz.122-50.SE3) to every switch ?
I'm having trouble stacking a new WS-C3750X-24P with existing switches WS-C3750G-24PS ?I can see the license is on the new WS-C3750X-24P:
switch#sho lic Index 1 Feature: ipservices Period left: 8 weeks 4 days License Type: Evaluation License State: Active, Not in Use, EULA not accepted License Priority: None
[code].....
I could put on the c3750e-ipbasek9-mz.122-55.SE1 image, but I may need to get the license sorted still, but not sure if that will work or how to add it if i got one.....
Situation: Currently WS-C3750G-48TS-(S or E) switches are on stack. Now these units will soon EOL on Jan. 30, 2013 and Cisco recommends that WS-C3750X-48T-S or WS-C3750X-48T-E will be used.
The question is: Will the new SKU works together in a stack with the old ones? Will there be no changes on the type of stacking cable to be used?
Currently there are three stacked WS-C3750G-24TS-1U on data centre. I am going to buy a WS-C3560X-48T-L to use 10GbE module. Is it possible stack this switch "WS-C3560X-48T-L" to current switches "WS-C3750G-24TS-1U" ?
Any issues are reported while configuring power stack ? We did several times with 12.2.58SE1 and SE2, sometimes the power stack is created automatically, sometimes needs to be configured manually. Looks like the behavior is not the same. Maybe it depends on the number/type of switches and number/type of power supplies.
I have a pair of 5596 running in a vPC with Nexus 2248 connected to each N5596. When I do the command "show fex" I get the following output on the 2nd 5596
Number Description State Model Serial ------------------------------------------------------------------------ 101 FEX101 AA Version Mismatch N2K-C2248TP-E-1GE SSI16390705 102 FEX102 AA Version Mismatch N2K-C2248TP-E-1GE SSI163704AD 122 FEX122 Online N2K-C2232PP-10GE SSI16370195
I'm running version 5.1(3)N1(1) on both of the 5K's. I have looked through all the configuration and I am not understanding why I am getting this error. I have tried to look it up on [URL], but not having a ton of luck.
I have two Switches which i need to put in a same stack - WS-C3750E-48TD and WS-C3750G-48TS . Possible to do so and also which IOS to put in both the switches as WS-C3750G-48TS is having lower RAM and flash.Whether can i put following IOS in these switches and connect them in a stack as i have read that IOS -- 15.0.1. SE are compatible with both the switches.
a . c3750e-ipbasek9-mz.150-1.SE.bin in switch - WS-C3750E-48TD
b. c3750-ipbasek9-mz.150-1.SE.bin in switch -- WS-C3750G-48TS
I do have C3750G-12s switch which is not able to boot as of the expected. Every time when I break the stack and try to use console i got a weird output from my console output. we need the stack to be break and use those switch separtally .
I have 8 switch stack consisting of six WS-C3550-48P and two WS-C3750G-16TD running software vesrion 12.2(25) SEB1. When I added new C3750v2-24PS (running image 12.2(50) SE5) in stack so I up-graded the image of existing 8 switches with latest veriosn 12.2(50) SE5. Once I have done with the upgrade then all ports of my stack switches went down after around five minuts. Is it image compatibility issue with existing switches or something else?
We have a cisco stack with 5 ws-c3750-24p 12.2)55)SE3 c3750-ipbasek9-m switches. Can i add a switch to the stack that is the following model: ws-c3750g-48ts 12.2(25)see3 c3750-ipbase-m
Does the color strips on C3750X stack power cables mean anything, I mean the green and yellow ones. On all Cisco pictures the green one seems to be plugged in the upper ports. I asked local Cisco representative, but he seems not to be sure. We tried to try different scenarios, and it looks like it does not matter what cable end we use. We do not have any external power supply, only interconnecting C3750Xs.
I am having an issue with adding a c3750x switch to an existing switch stack Currently there is 2 x WS-C3750X-48P and I am trying to add another WS-C3750X-48P to this switch I have cabled the switch to the stack using the stack cables and added the command to provision the switch on the exisitng stack. However when I turn the switch on it just goes on its own stack.
I noticed the new switch had a later version of IOS so have downgraded this to the same version as the other switches but still no joy Here is the sh ver from the exisitng stack
uptime is 4 weeks, 4 days, 23 hours, 30 minutes System image file is "flash:/c3750e-universalk9-mz.122-53.SE2/c3750e-universalk9-mz.122-53.SE2.bin" License Level: ipbaseLicense Type: PermanentNext reload license Level: ipbase cisco WS-C3750X-48P (PowerPC405) processor (revision A0) with 262144K bytes of memory.Processor board ID FDO1448Z0FJLast reset from power-on21 Virtual Ethernet interfaces1 FastEthernet interface156 Gigabit Ethernet interfaces6 Ten Gigabit Ethernet interfacesThe password-recovery mechanism is enabled.
We have WS-C3750-24FS switches stacked supporting users on our LAN. I want take advantage of the netflow capabilities of the WS-C3750X using the C3KX-SM-10G card.
Would I be to see netflow data coming from the WS-C3750's if I stacked it with the WS-C3750X?
Also I read that the C3KX-SM-10G card would support a 1G SFP is that correct?
I have two WS-C3750X-48T-S which is "IP BASE" licensed, which are connected as stack.I need to use Policy Based Routing (PBR) to direct Vlans to two different gateways, and command "ip policy route-map" which is supported only in C3750-IPSERVICES license.Do I need upgrade only master switch with Cisco IOS IP Services - product upgrade licenseMfg. Part#: L-C3750X-48-S-E, or both switches need to be upgraded?
Cisco let us try a CISCO C3750X- 24T-S Stack (2 switches) ->> IpBase Sofware licence We've 2 Hyper-v 2008 R2 and one SAN Netapp FAS2040 connected via Iscsi.All was working well with this stacks.Hyper-V see Nas Iscsi interface without problem. Even with basic stack config (no Vlan, ect...).Then, after this test period, we bought a C3750X-24T-L stack (2 switches) to replace the stack lent by Cisco.This one is LanBase Software.
With this stack, hyper-v work very bad ! We've got a lot of Iscsi error in the eventvwr.I can't access luns.So, is there a difference between LanBase and IpBase for a iscsi use ?I put the 24T-S config on the 24T-L switch without pb. So config is the same on both stacks...Also i've got a "TestPortAsicLoopback" = "Failed" on the new stack...I've tried with other stack cables. Not better.
WS-C3750G-24TS-S1U switch stack with high CPU utilization. 3 switches are stacked and using PBR on that. I am attaching the show cpu process as an attachment.The current template is "desktop routing" template.The selected template optimizes the resources in the switch to support this level of features for 8 routed interfaces and 1024 VLANs. [code]
I have a couple of WS-C3750X-48T-L and a couple of WS-C3750X-12S-S, I want to stack all four of them together into a single stack. WS- C3750X-12S-S are running c3750e-universalk9-mz.122-58.SE2 whereas WS-C3750X-48T-L are running c3750e-universalk9-mz.122-55.SE3.I have got a couple of queries as under:What are the options to achieve putting all these 4 switches into a single stack? Can the LAN Base switches upgraded to IP Base?
I am in the process of upgrading our stack of 4 switches consist of WS-C3750G-48PS. Upon reading release notes found that there are two versions of release notes 1 day apart, the one 02 Sep 2012 saying that WS-C3750-48PS is not supported in this version. Then in release next day 03 Sep 2012 that note has been removed. Which one is correct. Is it supported with my model of switch or not.also unable to update boot path in the stack switches, "switch all" is not supported in the current IOS. Master switch has new boot path but unable to change in slaves.
I have a customer with a stack of two switches C2960S-24TS-L that are running 12.2(58)SE2 universal K9, we see that the CPU load increase over time, to 95% and stays there reload solves the problem.the process that akes a lot of CPU is also the SNMP ENGINE, I see that it is running 30 minutes on 95% and then 10 minutes on 35%, this is the only stack were we see this problem. Is there also a SNMP bug in this version ?
Now I'm have IOS ver. 12.2(55)SE but from time to time I'm experiencing strange system freezing. It means that all systems connected to the stack are working very, very slow. It hapens ones, sometimes twice a month and takes 5 minutes. I didn't find anything strange in logs (neither on switch nor router). I would like to install other IOS version. Could you recomend me the most stable version for this stack (built from these different models) ?And the secound question: - Is it possible to copy SE1 manualy to every switch and reload one by one manualy. Will they join the stack and work fine after reload or maybe there will be a IOS mismatch ?