Cisco Switching/Routing :: WS-C2960S-48TD-L / Stack Reboot A Standalone Switch?
Dec 16, 2012
I have a Cisco WS-C2960S-48TD-L with 12.2(55)SE2.This is a standalone switch, not in stack, and with no order it reboots itself looking for a new master election. On logging i have nothing, but connected with console cable i see the following after 2 minutes of not showing anything:
Waiting for Stack Master Election...
...
The switch reboots and:
...
*Mar 1 00:00:12.289: Read env variable - LICENSE_BOOT_LEVEL =
[URL]
After searching online i have no seeing nothing about disable the feature of the stack so i configure the priority for the "switch 1" to 15 and configure it the switches 2, 3 and 4 to no provision, although this switches don´t exist:
SW_ACCESS(config)#switch 1 priority 15
Changing the Switch Priority of Switch Number 1 to 15
Do you want to continue?[confirm]
New Priority has been set successfully
[URL]
With this new configuration the switch has rebooted again.Why on a standalone switch the stack is rebooting my system?Is it any feature to disable the stack?
I want to connect WS-C2960S-48TD-L switch to WS-X6708-10G-3CXL module in Cisco WS-C6503-E switch. WS-X6708-10G-3CXL is C6K 8 port 10 Gigabit Ethernet module with DFC3CXL which requires X2 module. on the otherhand, WS-C2960S-48TD-L requires SFP+. Now is it possible to interconnect these two switch interfaces if I use LIU in between. or does WS-X6708-10G-3CXL module supports CVR-X2-SFP+ to use SFP+ transceivers.
I have two Switches which i need to put in a same stack - WS-C3750E-48TD and WS-C3750G-48TS . Possible to do so and also which IOS to put in both the switches as WS-C3750G-48TS is having lower RAM and flash.Whether can i put following IOS in these switches and connect them in a stack as i have read that IOS -- 15.0.1. SE are compatible with both the switches.
a . c3750e-ipbasek9-mz.150-1.SE.bin in switch - WS-C3750E-48TD
b. c3750-ipbasek9-mz.150-1.SE.bin in switch -- WS-C3750G-48TS
7x stack WS-C3750E-48TD-E orignal code 12.2.35...i wanted to get it to 15.0.1 so as a test i disconnected top switch (not the master ) and installed via archive download-sw /allow upgrade 15.0.1.tar. and it worked away fine...
so i moved onto the stack, issued the same command, image loaded rebooted and stack hung..Consoled in and switch was unable to boot..looping on trying to load flash. [code]
We have a 2960 stack of 4 WS-C2960S-24PS-L switches.Sometimes, at random, the stack crashes and reboots. I have downloaded the crashinfo file and can see the following error.
I'm trying to configure a stack between two WS-C2960S-48FPS-L but does not working.The switch port is always Down.I tried to change de module and cables.I tried to make a loop in one of two switches and the ports always down.
IOS: 12.2(55)SE5 #show switch stack-ports Switch # Port 1 Port 2 -------- ------ ------ 1 Down Down
We have two switches WS-C2960S-24TS-L running in stack with running IOS c2960s-universalk9-mz.122-55.SE3.We have connected two checkpoint devices on Gi1/0/24 and Gi2/0/24 with a simple configuration:
interface range GigabitEthernet1/0/24, gi2/0/24 switchport access vlan x switchport mode access spanning-tree portfast
On the devices log we get the following message:
%SW_MATM-4-MACFLAP_NOTIF: Host 0000.0000.fe21 in vlan x is flapping between port Gi2/0/24 and port Gi1/0/24
The mac-address 0000.0000.fe21 is not found on any checkpoint interface. "Show mac-address int gi1/0/24 or gi2/0/24" does not show the correct mac-address of the checkpoint interface connected to the port, but instead shows 0000.0000.fe21.Is there a bug in the IOS, something wrong with the switch config or does it have something to do with the checkpoint config?
I have a customer with a stack of two switches C2960S-24TS-L that are running 12.2(58)SE2 universal K9, we see that the CPU load increase over time, to 95% and stays there reload solves the problem.the process that akes a lot of CPU is also the SNMP ENGINE, I see that it is running 30 minutes on 95% and then 10 minutes on 35%, this is the only stack were we see this problem. Is there also a SNMP bug in this version ?
I have 2 Catalyst 2960S-switches configured in a stack. The uplink is configured as a cross-stack etherchannel. Now I want to upgrade the stack with a minimum of downtime for the connected hosts. The hosts are connected to the stack via cross-stack etherchannels. So my question is: How can I upgrade the stack and reboot the members with a minimum of downtime? If I use the archive download-sw command with the /reload-option, the stack is reloaded and the result will be downtime for the hosts while th stack is reloading. Is it possible to upgrade the stack and then reboot the members one by one in a controlled manner?
I wanted to know if there is a way of upgrading the IOS on a stack of 6 - 8 3750's with minimal impact at reload. Is there a way to reload one member at a time?
We have several of these WS-C2960S-24PS-L running 12.2(55)SE5 C2960S-universalK9-M and need to upgrade to a better.IOS since we have a sitution where CPU would get to 100% but we have only a few ports connected.Also we have several of WS-C3750-48P running 12.2(55) SE6 C3750-IPBASEK9-M.
I have configured about 20 of these switches now, and notice in the port listings a TE1/1//1 TE1/1/2 and GI1/1/1 GI1/1/2 uplink port. There are only two uplink SFP+ ports. I now have a reason to install with a 1Gb uplink to the Core. I am using a GLC-LH module at each end. I did configure the TE1/1/1 port for the uplink. Does not work though..Do I need to configure the two GI1/1/1 and 1/1/2 ports for uplink, remove the TE configuration for the uplink to work? Using the UNIVERSAL code with a LANBase license.
The field engineer has a stand alone 24 port 2900 series switch that he has different equipment connected to and are segmented using VLANs. So for example, he's got ports 1-4 assigned to VLAN 10, 5-12 assigned to VLAN 20, 13-19 assigned to VLAN 30 and 20-24 assigned to VLAN 40. He would like all the gear on VLAN 30 to have the ablity to talk to all of the other VLANS, but VLAN 40 should not be allowed to talk with any other VLAN. Trunking would do no good here since the switch isn't connected to anything and you can only assign one VLAN per port.
Is there a way to do this within the stand alone switch? The only possible way I could think of would be to ensure that each VLAN has an assigned IP number (subnet) and doing this through access lists.
Configured Layer 3 portchannel from 6500VSS enabled switch to two different 6500 standalone switch. Configured first ip on VSS switch, second ip on standalone switch1 and third IP on standalone switch2. My question is
1. Will the portchannel be up? 2. If port channel is up, will I able to ping the connected IP's.
Does GLC-GE-100FX is supported on the WS-C2960S-24TD-L. I don't see this switch listed under the compatibiilty matrix.URL,But the datasheet for the 2960S says this:"The Cisco Catalyst 2960-S with SFP+ does not support the GLC-FE-100BX, GLC-FE-100FX, or GLC-FE-100LX."But it provides no reference for the GLC-GE-100FX,The easy answer is, no the 2960S-24TD doesn't support it.
Need your expert input in sorting out the below problem.I have a cisco 6513 switch which is going into SP mode after a reboot whci i have done during BCP activity in my organization.Below are the log for your reference.
I was trying to configure an SF 300-24 for use in my home and obviously did something dumb. It was working fine. The f/w was updated and I had configured 2 VLANs. VLAN2 was ports 1-6+GE1 for IPTV streaming and VLAN3 was ports 7-24+GE2 and GE3 for the rest of my LAN. I was plugged into GE4 and was configuring the switch with a laptop. GE4 was the only port still on the default VLAN1. I chaged the default VLAN to VLAN3, which forced a reboot and the switch never came back up. Attached is what I see when I connect to the console port: [code]
I can't access to GUI using it's static IP or it's default IP on any port and the console never reaches the point where I can log in. The System light is flashing green but the boot sequence never progresses past what's in the screen shot. I tried to do a hard reset using the recessed button on the front panel but it does not seem to have any effect, no matter how long I hold it down.
Everything is in the title...When I plug a GBIC adapter on a port, my switch reload automatically..! Is it normal, because I did it during production and It disconnects some users.
i want to remove an access layer 3750 48 POE master switch and replace with a new 3750 switch in the stack. i want to copy the same configuration to new switch since the old switch is having POE issue and I got replacement of the malfunctioned switch. we have VTP domain is configured in the network...
I have a running setup having 2 Cisco 2960s 24 TS switch with Stack configuration. Now I want to add one more same Cisco switch. My questions are:-
1) How can I do this...(Should follow the same process as I did before.
2) Could I do this without impacting the service. i.e. without rebooting the switch.
3) What should be the connection archiecture as of now since there is two switch so it is connected 1 -1 and 2-2. but for 3 switch should we require to change the connectivity.
have one 3750G stack with 4 switches and this stack is presenting the follow log message:
%PLATFORM_UCAST-4-PREFIX: One or more, more specific prefixes could not be programmed into TCAM and are being covered by a less specific prefix, and the packets may be software forwarded.
In this stack we are using the layer 3 with OSPF routing, and the current sdm prefer is default:
switch-01-3750#sh sdm prefer The current template is "desktop default" template. The selected template optimizes the resources in the switch to support this level of features for 8 routed interfaces and 1024 VLANs.(code)
My question is about WS-C3750E-48TD-S and WS-C3750E-24TD-S Switches
What are the limitations of the mapping of VLANs on this device? Is it limited by number or by interface? Does the configuration of an interface has spread all interfaces ?
We have existing stack of 3 units of WS-C3750-48TS-S ( 100 mbps ports with Gigabot uplinks). with IOS as follows, Can we add WS-C3750G-48PS-S in this same stack (this is 48 Gigabit ports)?
I configured 3750 A switch with vlan 20 and its IP address 192.168.20.41Its default gateway was 192.168.20.3Then i configured 3750 B switch with same default gateway and vlan 20 IP 192.168.20.43My question is now when we stack it becomes single switch and now vlan 20 ip address is 192.168.20.43 thats only IP i can see.So how does stack switch choose vlan 20 IP?Does it choose highest IP address between two switches if they have same vlan 20 as in my case?Also when i go to switch 3750 b by session command and do sh ip route it does not show ip default gateway .Also it shows vlan 20 as admin down .